freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

(最新)土木工程專業(yè)英語結(jié)課論文(編輯修改稿)

2024-12-13 12:10 本頁面
 

【文章內(nèi)容簡介】 y should the pit ( groove ) bottom soil prehensive observation. ① soil and the color is the same。 ② soil hardness is uniform, there is no local soft or strong。 ③ soil moisture content is abnormal or not, there is no too dry or wet。 ④ pit ( groove ) in bottom walking or tamping shooting without tremor or hole sound phenomenon. Through the above observation to analyze and judge the pit ( groove ) bottom dig to old soil ( bearing layer of Foundation ), whether to continue to dig or processing. Trough inspection should focus on to a load bearing walls, wall, or other larger force parts of the mainly. II, brazing trough inspection Brazing is a hammer into the pit ( groove ) steel under the soil in certain depth, according to the number of hammering and has difficulty to judge the soil soft and has no hole, hole, curtain cave and soft bottom layer. Brazing procedure is as follows: ① according to the pit ( groove ) plans for the drilling sites, and drill detecting points are sequentially numbered drawing drill detecting point layout。 ② preparation of hammer and drill rod, a drill diameter engineering should be consistent, the heavy hammer is consistent。 ③ press drilling sequence number for drilling construction。 ④ drilling, requirements to consistent, hammer drop distance consistent. Each peration30CM ( called step ), recording a hammering number, fill in the drill rod detection record。 ⑤ After the end of the drill rod detection, to from go up by step analysis of brazing records, and horizontal analysis of drill hole between the number of hammering, can determine soil structure and soil hardness, and should be the number of hammering to
點擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1