freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

永磁同步電動機(jī)英文翻譯(編輯修改稿)

2025-07-21 03:02 本頁面
 

【文章內(nèi)容簡介】 roop is lower than load troque, can not start thus and want to raise vs this power supply voltage to enlarge the starting torque of dynamo.(2)The fault of motor. Check motor settle, the rotor winding had no short circuit, open circtui, open soldering and link bad etc. fault, these the faults will make the dynamo can not start to create starting of rating of intensity of magnetic field, make thus the dynamo can not start。Checking the motor bearing has already had no failure, the port cap has have no loose, if bearing failure port shroud loose, result in bearing39。s down sinking, mutually rub with stator iron core, result in thus dynamo39。s canning not start, vs settle the rotor fault can be shaken table with the low tension, gradually click to check to seek a fault condition and adopt homologous treatment。The countersgaft accepts and carries to shroud a loose condition and all wants a pan car before driving each time and sees motor rotor whether slewing is vivid, if bearing or shaft kiowatt damage and replace in time.(3)The control device breaks kind of faults are mostly the . output voltage of the windings of Li magnetic belt to adjust not appropriate or don39。t output, result in the stator current of motor over big, cause the motor conduct electricity the run make or the losing of dynamo magnetic belt run check whether output voltage current and its waveform that the Li magnetic belt equips is normal at this time, the Rong breaks whether the machine Rong breaks, the contact is bad。Whether circuit board plugin puts prison or alignment。Check loop resistance, put out whether crystal gate tube of magnet burns out or brokes through.(4)Mechanical trouble. Such as be dragged along a dynamic machinery to block, result in motor incapability39。s starting, the rotor that moves motor in response to the pan at this time sees whether the slewing is vivid, machinery burden whether existence fault synchro motor incapability leads long into synchronization.Synchro motor in mon use law of nonsynchronous starting,throw in Li magnetic belt when the motor rotor revolving speed hits synchronous revolving speed of 95%, make it leads long into synchronization. The synchro motor incapability leads long into synchronous reason as follows:(1)The Li magnetic belt winding short the winding of Li magnetic belt, existence short circuit breaks down, as a result makes motor able to stabilize run time but incapability and lead long into synchronization while being lower than synchronous revolving speed. Check to seek the Li magnetic belt winding short circuit, can open into low tension(about the 30 Vs) in the rotor derivation on line, put on the magnetic poles surface with a hand work steel saw, pursue inspection magnetic poles, if vibrating is violent, explain the magnetic poles to have no short circuit on steel saw of the magnetic poles39。 surface, if the vibrating of saw blade micro or don39。t flap, explain the magnetic poles short circuit. After unloading the magnetic poles, check the fault to click,is shortcircuit degree, adopt local to mend or re round to make.(2) Power supply voltage over low. Power supply voltage over low, result in the strong Li link of the device of Li magnetic belt incapability working, make the motor incapability lead long into synchronization thus, the concrete way is to raise power supply voltage appropriately.(3) The fault of Li magnetic belt device. Such as throw Li over speedy(namely throw in Li magnetic belt, motor rotor revolving speed over low), will make the motor can not lead long into synchronization, should check to throw if the Li link exists fault at this time. If Li magnetic belt device fault, the output39。s current is lower than a rating value, cause the electricity magnetic troque of dynamo over small but can not lead long into synchronization, at this time in response to scrutiny Li magnetic belt device of throw Li link and phase shifting link, waveform use oscillo graph to check to throw Li link and phase shifting link, should also check and put out magnetic belt link and put out crystal gate of magnetic belt whether tube discovers a question as usual, handle in time, if the incapability handles in time, by way of the energy quickly restore capacity, should replace to provide for use circuit board.
點(diǎn)擊復(fù)制文檔內(nèi)容
化學(xué)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1