【正文】
Mo 新風(fēng)量, kg/s; ho 室外空氣的焓值, kJ/kg; hR 室內(nèi)空氣的焓值, kJ/kg; 根據(jù)夏季空調(diào)室外計(jì)算干球溫度 ℃,濕球溫度 ℃,由濕空氣焓濕圖查得室外空氣焓值 ho=當(dāng) tR=26℃, φ =55℅時(shí),室內(nèi)空氣焓值 hR =; Δ hoR== kJ/kg 表 31 新風(fēng)量計(jì)算表 房間類型 每人最小新風(fēng)量 m3/( h178。 河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 17 (十 )、伴隨散濕過程的潛熱冷負(fù)荷 (1) 人體散濕量按下式計(jì)算 D= ng (320) 式中 D— 散濕量, kg/h; g— 一名成年男子的小時(shí)散濕量, g/h。 ,通過空調(diào)房間內(nèi)窗、隔墻、樓板或內(nèi)門等內(nèi)圍護(hù)結(jié)構(gòu)的溫差傳熱負(fù)荷,按下式計(jì)算: Q=KF(twp+Δ tlstn) (37) 式中 Q— 穩(wěn)態(tài)冷負(fù)荷,下同, W; twp— 夏季空氣調(diào)節(jié)室外計(jì)算日平均溫度,℃; tn— 夏季空氣調(diào)節(jié)室內(nèi)計(jì)算溫度,℃; Δ tls— 鄰室溫升,可根據(jù)鄰室散熱強(qiáng)度采用,℃。這是因?yàn)橛?jì)算 16點(diǎn)鐘外墻內(nèi)表面由于溫度波動(dòng)形成的房間冷負(fù)荷是 5小時(shí)之前作用于外墻外表面溫度波動(dòng)產(chǎn)生的結(jié)果。此過程考慮外擾的周期性以及圍護(hù)結(jié)構(gòu)對(duì)外擾量的衰減和延遲性。水泵要配以變頻調(diào)速裝置。便于水力平衡。為節(jié)省投資,采用屋頂 冷卻塔形式。全空氣系統(tǒng)所選用的空氣處理設(shè)備一般是組合式空調(diào)器。另外,板式換熱器還有一個(gè)突出的特點(diǎn)是能在小溫差下傳熱,因而得到廣泛的使用。 機(jī)型和設(shè)備的選擇,應(yīng)根據(jù)建筑物空氣調(diào)節(jié)的規(guī)模、用途、冷負(fù)荷、所在地區(qū)氣象條件、能源結(jié)構(gòu)、政策、價(jià)格及環(huán)保規(guī)定等情況,按下列要求綜合論證確河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 6 定: 、區(qū)域供熱或工廠余熱; 、干旱缺水地區(qū)的中小建筑可采用空氣源熱泵或埋管式地源熱泵冷(熱)水機(jī)組供冷、供熱; ,且各房間區(qū)域負(fù)荷特性相差較大,需要長時(shí)間向建筑物供熱和 供冷時(shí),技術(shù)經(jīng)濟(jì)比較后,可采用水環(huán)熱泵空氣調(diào)節(jié)系統(tǒng)供冷、供熱; 行分時(shí)電價(jià)、峰谷電價(jià)差較大的地區(qū),空氣調(diào)節(jié)系統(tǒng)采用低谷電價(jià)時(shí)段蓄冷(熱)能明顯節(jié)電及節(jié)省投資時(shí),可采用蓄冷(熱)系統(tǒng)供冷(熱); (2)需設(shè)空氣調(diào)節(jié)的商業(yè)建筑或公共建筑群,有條件時(shí)宜采用熱、電、冷聯(lián)產(chǎn)系統(tǒng)或集中設(shè)置供冷、供熱站; (3)電動(dòng)壓縮式機(jī)組臺(tái)數(shù)及單機(jī)制冷量的選擇,應(yīng)滿足空氣調(diào)節(jié)負(fù)荷變化規(guī)律及部分負(fù)荷運(yùn)行的調(diào)節(jié)要求,一般不宜少于兩臺(tái);當(dāng)小型工程僅設(shè)一臺(tái)時(shí),應(yīng)選調(diào)節(jié)性能優(yōu)良的機(jī)型; (4)選擇電動(dòng)壓縮式機(jī)組時(shí),其制冷劑必須符合有關(guān)環(huán)保要求,其使用年限不得超過中國禁用時(shí)間表的規(guī)定。 表 11 圍 護(hù)結(jié)構(gòu)傳熱系數(shù) 圍護(hù)結(jié)構(gòu) 外墻 外門 外玻璃門 外窗 屋面 傳熱系數(shù) 傳熱衰減 傳熱延遲 外墻 : 按淺色計(jì)算 外 窗 : 窗戶日射得熱參數(shù):內(nèi)設(shè)淺色窗簾 Cs=; Ci=; Ca=; : S302; E599; N114; W599, 水平 842 參數(shù)確定 : 接待大廳 : 各類包間: 員工休息室: : 所有計(jì)算送新風(fēng)的房間均按照 30m3/人 .小時(shí) 的保準(zhǔn)計(jì)算送風(fēng)量 走廊,門廳 :不送新風(fēng) : 員工休息室、衛(wèi)生間、儲(chǔ)藏室、傳菜間、接 待大廳 按 /m2 按 /m2 河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 4 各房間的人員負(fù)荷、照明負(fù)荷、及新風(fēng)負(fù)荷各小時(shí)的分配按《公共建筑節(jié)能設(shè)計(jì)標(biāo)準(zhǔn)》選取。 原始資料 工程概況 鳳凰園火鍋店位于唐山市,是一家中型餐館,主要包括接待大廳,儲(chǔ)藏室,傳菜間 , 員工休息室,各種消費(fèi)包間 等。 考慮到空調(diào)使用過程中的巨大能耗,其冷熱源及水泵的合理選用、設(shè)計(jì)就顯得格外重要。在建筑物空調(diào)系統(tǒng)運(yùn)行能耗中,冷源系統(tǒng)的能耗是最大的。 風(fēng)冷熱泵機(jī)組是一種節(jié)能 、節(jié)水和環(huán)保的設(shè)備 ,一機(jī)冬夏兩用 ,具有設(shè)備利用率高的特點(diǎn) ,但也存在冬季低溫工況下供熱不足、高濕區(qū)域結(jié)霜嚴(yán)重等問題 ,這些問題阻礙了風(fēng)冷熱泵機(jī)組北擴(kuò)的使用趨勢。 設(shè)計(jì)內(nèi)容包括 :方案的比較、負(fù)荷計(jì)算、空氣處理過程的選擇、 設(shè)備選型,水管路和風(fēng)管路系統(tǒng)的設(shè)計(jì)及附屬設(shè)備的選型,并進(jìn)行設(shè)計(jì)說明書的編制和施工圖的繪制。 關(guān)鍵詞: 空調(diào), 熱泵, 通風(fēng), 火鍋店 ,設(shè)計(jì) 河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 II Abstract The air conditioning and ventilation system for the chafing dish restaurant of feng huagn yuan in Tangshan was designed, incluiding scheme parision, load calculation, air process selection, equipment selection, water system and air system design, and appurtenances selection. The design specifications and the construction drawing was worked out. The summer cold load is kW, and the winter heat load kW in this project. Two water cooling screw rod type cold water units whose refrigeration quantity is 620kW were selected for refrigeration. The city heat source was used for heating. The hot water 95℃ /70℃ was changed to 60℃ /50℃ with disc heat interchanger, and then supplying the air conditioning . The Air cooled heat pump is choosed for the main engine in this project. Air cooled heat pump is energysaving,watersaving and environmentalfriendly can be fully used both in summer and it also get some disadvantages like providing less heating capacity at low ambient temperature,heavy frost in high humidity regions,etc,which hinders it from application in north of this paper the author analyzed to increase ASHP COP for energy saving,improving defrost control logic to reduce power consumption due to the unnecessary defrost,add functions like heat recovery to reduce power consumption,use two stage pression to broaden its application,which is very beneficent to the perfection of ASHP. The FCU+PAU system was selected for the project. The direct return system, the primary pump system and the variable current quantity system was selected for the water system after the analysis and parison. 河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 III Key words: air conditioning, ventilation, library, design河 北 聯(lián) 合 大 學(xué) 畢 業(yè) 設(shè) 計(jì) 說 明 書 IV 目 錄 第一章 緒 論 ................................................................................................................. 1 背景介紹 .................................................................................................................... 1 設(shè)計(jì)內(nèi)容 ..................................................................................................................... 2 原始資料 ..................................................................................................................... 2 工程概況 ................................................................................................................. 2 氣象參數(shù) .................................................................................................................. 2 土建資料 .................................................................................................................. 2 圍 護(hù)結(jié)構(gòu)傳熱系數(shù) .................................................................................................. 3 參數(shù)確定 .................................................................................................................... 3 設(shè)計(jì)目的 ..................................................................................................................... 4 第二章 方案初定 ........................................................................................................... 5 方案設(shè)計(jì)內(nèi)容 ............................................................................................................. 5 空調(diào)設(shè)計(jì)負(fù)荷概算 ..................................................................................................... 5 室內(nèi)設(shè)計(jì)參數(shù) ............................................................................................................. 5 空調(diào)冷、熱源系統(tǒng)與設(shè)備選擇 ......................................