【正文】
。 Release Package Concepts Develop Vehicle Package amp。 Hardpoints (Vehicle Proportions Frozen) Adequacy of post PH resources verified and staffing issues resolved Subsystem (level 2) target agreements signed ?Subsystem (level 2) targets mitted ?Market research for people/cargo package, vehicle proportions, and styling development pleted ?Proportions and selected hardpoint elements frozen 。 1PP vehicle build pleted ?Assembly plant tools amp。 analytical evaluation of attribute performance vs. objectives pleted ?Last Class I surface for major formed parts verified/released ?All 3dimensional data is pleted ?Final launch plan is confirmed and issued 13 (CP)Confirmation Prototype (First CP Vehicle Available) Adequacy of post (CP) resources verified and staffing issues resolved Process FMEA for all or modified processes/tools pleted First CP vehicle (available for deliver) pleted Final Engineering Release (all end items/ ponents released at “P”(production)authority by 17 MBJ1 For S5 Program ?Campaign prevention “fresh Eyes” pleted ( MBJ1 for S5 program) 14 CC Change Cutoff (Commitment to Job1 Timing) Adequacy of post CCresources verified and staffing issues resolved Reliability amp。 sourcing council approval to conduct make/buy studies 7 SI Strategic Intent (Initial Program Direction Established) Adequacy of postSI resources verified and program staffing plan updated Vehicle Design Specifications (VDS), incl. patible vehicle target ranges, pleted Program technology application report pleted ?Final Product vision and program mission statements confirmed ?Preliminary Vehicle Program [timing] Plan (VPP) established ?Strategies such as product, market, manufacturing, assembly, supply, design, service, quality/reliability, craftsmanship and reusability confirmed ?Implementation readiness for vehiclearchitecture technologies achieved 8 SCStrategic Confirmation (Team Confirms Strategy/Viability) Adequacy of postSCresources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure updated to reflect patible SC targets amp。R Creation Verification Confirmation 100%PSW Manuf. Strategy Manufacturing Plan amp。 3D Designs CP Prototype Phase AP0 amp。people and cargo pa