freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

福特汽車-fpds系統(tǒng)介紹(ppt16)-汽車(專業(yè)版)

2025-10-14 19:10上一頁面

下一頁面
  

【正文】 enditem) Design Specifications (CDS) patible with program objectives Enditem / ponent target agreements signed Program technology application report pleted Program specific FMEA’s pleted Subsystem Level 2 amp。1 FPDS What is FPDS? The vision of the Ford Product Development System is to document the process tasks and deliverables necessary to develop and launch a vehicle. Team events and milestones are defined to municate progress at various points throughout the product development process. Each process task is related to at least one deliverable and a process description sheet. Currently,there are a total of 1058 tasks and 1249 deliverables in FPDS. The process tasks and deliverables are logically linked to create generic MS Project work plan templates for large (S3S6) and small scale (S1S2)programs. FPDS is utilized by the following brands: Ford,Lincoln,Mercury,Jaguar, and Land and Volvo each utilize a unique development process. 2 Generalized Process Flow (for reference only) KO PS1/2 SI SC PH PA PR CC LR LS J1 ST CP Vehicle Program [timing] Plan Market Research (Qual.) Market Research (Quantitative) Mgmt. amp。 enditem /ponent Design Verification Plans (DVP’s) pleted Final Prototype Plan for AP2, AP3, amp。 assumptions updated Marketing strategy document (including mitted revenue/volume)delivered Manufacturing and assembly plan (includes facilities and tooling inv.) approved Single appearance theme for final development selected Reliability and robustness demonstration plan for priority systems pleted Component ( amp。 Cust. Drive Management Drive Supplier Sourcing Process Target Agreements PAuthority Release Functional Targets Development Preliminary Eng. Signoff Final Eng. Signoff FMEA/DVPamp。 CP prototype vehicle builds pleted Program Parts List (PPL), including service parts, pleted ?All targets(. function, cost, etc.)bee objectives and are patible 11 (ST) Surface Transfer (Interior/Exterior Surface Provided) Adequacy of post (ST) resources verified and staffing issues resolved Design Manufacturing and Assembly Readiness (DMAR) patibility pleted: —Interior/Exterior Class IA surfaces transferred to eng./manuf.(+/ mm) —All hardpoints frozen Campaign prevention”Deep Div
點擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1