【正文】
Development Preliminary Eng. Signoff Final Eng. Signoff FMEA/DVPamp。R Creation Verification Confirmation 100%PSW Manuf. Strategy Manufacturing Plan amp。AP1 Prototype Phase AP2 Prototype Phase AP3 Prototype Phase PreProd. Builds Confirm Pkg. P/T Commodity Design P/T Program Specific Design Powertrain (P/T) Calibration P/T Certification DEFINE DESIGN VERIFY LAUNCH Component Subsystem Level System Level Vehicle Level 3 Generic FPDS Timing amp。 sourcing council approval to conduct make/buy studies 7 SI Strategic Intent (Initial Program Direction Established) Adequacy of postSI resources verified and program staffing plan updated Vehicle Design Specifications (VDS), incl. patible vehicle target ranges, pleted Program technology application report pleted ?Final Product vision and program mission statements confirmed ?Preliminary Vehicle Program [timing] Plan (VPP) established ?Strategies such as product, market, manufacturing, assembly, supply, design, service, quality/reliability, craftsmanship and reusability confirmed ?Implementation readiness for vehiclearchitecture technologies achieved 8 SCStrategic Confirmation (Team Confirms Strategy/Viability) Adequacy of postSCresources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure updated to reflect patible SC targets amp。 assumptions updated Marketing strategy document (including mitted revenue/volume)delivered Manufacturing and assembly plan (includes facilities and tooling inv.) approved Single appearance theme for final development selected Reliability and robustness demonstration plan for priority systems pleted Component ( amp。 analytical evaluation of attribute performance vs. objectives pleted ?Last Class I surface for major formed parts verified/released ?All 3dimensional data is pleted ?Final launch plan is confirmed and issued 13 (CP)Confirmation Prototype (First CP Vehicle Available) Adequacy of post (CP) resources verified and staffing issues resolved Process FMEA for all or modified processes/tools pleted First CP vehicle (available for deliver) pleted Final Engineering Release (all end items/ ponents released at “P”(production)authority by 17 MBJ1 For S5 Prog