freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

福特汽車-fpds系統(tǒng)介紹(ppt16)-汽車-免費閱讀

2025-09-14 19:10 上一頁面

下一頁面
  

【正文】 robustness for priority systems(including campaignable items) demonstrated Campaign prevention verification “Deep Dive” review (engineering disciplines) pleted CP confirmation tests analyzed Design FMEA documents, in support of preliminary engineering signoff, updated Preliminary Engineering Signoff pleted —Initial CP durability testing and initial set of road tests pleted —Known changes from CP containable for 1PP —Design is at Job1 levelno further design changes except”No Builds” —Engineering confidence that objectives will be met and assessed —Management drive pleted ? Graining/Final Colors approved ?Supplier mitment to support 1PPwith PSW parts ?Production level P/T calibration available ?CP post durability”Fresh Eyes” review pleted 15 LR Launch Readiness (Engineering SignOff Complete) Adequacy of post LR resources verified and staffing issues resolved Production build (1PP) readiness assessment pleted 100% PSW parts available for 1PP Final Engineering Signoff including: —Functional objectives satisfied and final road tests pleted —100% CP durability testing pleted —Design Certification based on CP lab/rig certification/ homologation test results —Readiness to proceed to assembly Tool TryOut(TTO), 1PP and Job 1 ?Hard Tooled Functional Build (HTFB) issues resolved ?All production assembly tools functioned at tool source or in homeline ?Color/textures/gloss signoff pleted 16 LS Launch Signoff (Ready to Launch) ?Vehicle assembly Tool TryOut(TTO) amp。 assumptions Vehicle Design Spec.(VDS),including patible vehicle point targets pleted Subsystem (level 1) target agreements signed Campaign prevention awareness sessions pleted ?Manufacturing and assembly location for each derivative confirmed ?Implementation Readiness (IR)for new powertrain technology signedoff ?Vehicle/system /subsystem(level 1) targets mitted ?Powertrain lineup selected and powertrain package envelope pleted ?All supplier’s sourced and part of team ?Initial Attribute Prototype (AP) plan is pleted and VPP[timing plan]signedoff 9 PH Proportions amp。 Design (Tools and Equipment) Development Production Launch Dev. Appearance Concepts Theme(s) Dev. Single Theme Surface Dev. amp
點擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1