【正文】
ckage frozen 10 PAProgram Approval (All Targets Bee Objectives) Adequacy of post PA resources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure to reflect patible objectives amp。 process verification pleted including aids amp。 CP prototype vehicle builds pleted Program Parts List (PPL), including service parts, pleted ?All targets(. function, cost, etc.)bee objectives and are patible 11 (ST) Surface Transfer (Interior/Exterior Surface Provided) Adequacy of post (ST) resources verified and staffing issues resolved Design Manufacturing and Assembly Readiness (DMAR) patibility pleted: —Interior/Exterior Class IA surfaces transferred to eng./manuf.(+/ mm) —All hardpoints frozen Campaign prevention”Deep Dive” Review (of engineering disciplines)pleted ?Powertrain design (including P/T control system strategy) pleted 12 PRProduct Readiness (Designs Ready for CP Builds) Adequacy of post PRresources verified and staffing issues resolved Package patibility (interference, service, assembly, occupant/cargo) issues resolved Analytical signoff of vehicle performance versus requirements and specifications ?Management drive amp。 Target Customers Defined) Adequacy of preSI resources verified and program staffing plan updated ?Initial mission, vision, program scope (markets) and primary brands defined ?Program Attribute Leadership Strategy (PALS) defined ?Preliminary manufacturing, assembly, reusability, and modularity strategies defined ?Prelim. brand profiler, mkt. research plan, and customer experience research pleted ?Customer, corporate, and regulatory requirements defined ?Benchmark and Ford parator vehicles identified 6 PreSI 2 (Target Ranges Assessed) Adequacy of postSIresources verified and program staffing plan updated ?Initial strategies developed and preliminary target ranges for vehicle attributes assessed ?Potential vehicle alternatives and assumptions defined ?Vehicle assembly plant location confirmed and VOSI cost analysis pleted ?Sourcing workplan pleted amp。 Cust. Drive Management Drive Supplier Sourcing Process Target Agreements PAuthority Release Functional Targets Development Preliminary Eng. Signoff Final Eng. Signoff