freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

福特汽車-fpds系統(tǒng)介紹(ppt16)-汽車-文庫吧在線文庫

2025-09-29 19:10上一頁面

下一頁面
  

【正文】 ckage frozen 10 PAProgram Approval (All Targets Bee Objectives) Adequacy of post PA resources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure to reflect patible objectives amp。 process verification pleted including aids amp。 CP prototype vehicle builds pleted Program Parts List (PPL), including service parts, pleted ?All targets(. function, cost, etc.)bee objectives and are patible 11 (ST) Surface Transfer (Interior/Exterior Surface Provided) Adequacy of post (ST) resources verified and staffing issues resolved Design Manufacturing and Assembly Readiness (DMAR) patibility pleted: —Interior/Exterior Class IA surfaces transferred to eng./manuf.(+/ mm) —All hardpoints frozen Campaign prevention”Deep Dive” Review (of engineering disciplines)pleted ?Powertrain design (including P/T control system strategy) pleted 12 PRProduct Readiness (Designs Ready for CP Builds) Adequacy of post PRresources verified and staffing issues resolved Package patibility (interference, service, assembly, occupant/cargo) issues resolved Analytical signoff of vehicle performance versus requirements and specifications ?Management drive amp。 Target Customers Defined) Adequacy of preSI resources verified and program staffing plan updated ?Initial mission, vision, program scope (markets) and primary brands defined ?Program Attribute Leadership Strategy (PALS) defined ?Preliminary manufacturing, assembly, reusability, and modularity strategies defined ?Prelim. brand profiler, mkt. research plan, and customer experience research pleted ?Customer, corporate, and regulatory requirements defined ?Benchmark and Ford parator vehicles identified 6 PreSI 2 (Target Ranges Assessed) Adequacy of postSIresources verified and program staffing plan updated ?Initial strategies developed and preliminary target ranges for vehicle attributes assessed ?Potential vehicle alternatives and assumptions defined ?Vehicle assembly plant location confirmed and VOSI cost analysis pleted ?Sourcing workplan pleted amp。 Cust. Drive Management Drive Supplier Sourcing Process Target Agreements PAuthority Release Functional Targets Development Preliminary Eng. Signoff Final Eng. Signoff
點擊復制文檔內容
試題試卷相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1