【正文】
e” Review (of engineering disciplines)pleted ?Powertrain design (including P/T control system strategy) pleted 12 PRProduct Readiness (Designs Ready for CP Builds) Adequacy of post PRresources verified and staffing issues resolved Package patibility (interference, service, assembly, occupant/cargo) issues resolved Analytical signoff of vehicle performance versus requirements and specifications ?Management drive amp。people and cargo package frozen 10 PAProgram Approval (All Targets Bee Objectives) Adequacy of post PA resources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure to reflect patible objectives amp。R Creation Verification Confirmation 100%PSW Manuf. Strategy Manufacturing Plan amp。 analytical evaluation of attribute performance vs. objectives pleted ?Last Class I surface for major formed parts verified/released ?All 3dimensional data is pleted ?Final launch plan is confirmed and issued 13 (CP)Confirmation Prototype (First CP Vehicle Available) Adequacy of post (CP) resources verified and staffing issues resolved Process FMEA for all or modified processes/tools pleted First CP vehicle (available for deliver) pleted Final Engineering Release (all end items/ ponents released at “P”(production)authority by 17 MBJ1 For S5 Program ?Campaign prevention “fresh Eyes” pleted ( MBJ1 for S5 program) 14 CC Change Cutoff (Commitment to Job1 Timing) Adequacy of post CCresources verified and staffing issues resolved Reliability amp。 Hardpoints (Vehicle Proportions Frozen) Adequacy of post PH resources verified and staffing issues resolved Subsystem (level 2) target agreements signed ?Subsystem (level 2) targets mitted ?Market research for people/cargo package, vehicle proportions, and styling development pleted ?Proportions and selected hardpoint elements frozen 。 Design (Tools and Equipment) Development Production Launch Dev. Appearance Concepts Theme(s) Dev. Single Theme Surface Dev. amp。 robustness for priority systems(including campaignable items) demonstrated Campaign prevention verification “Deep Dive” review (engineering disciplines) pleted CP confirmation tests analyzed Design FMEA documents, in support of preliminary engineering