【正文】
Unload之次數(shù)/頻率?搬運(yùn)設(shè)備之效能(九)縮短換線換模時(shí)間之要領(lǐng)簡介Improvement Approach 改善的手法☆ Four ( 4 ) Steps 四個(gè)步驟☆ Two ( 2 ) Categories 兩種類別☆ Four ( 4 ) Stages 四個(gè)階段4 Steps(四個(gè)步驟)☆ Preparation(準(zhǔn)備)☆ (Re)placement (更換、裝置)☆ Adjustment (調(diào)整)☆ Completion (完成、善后)Step 1 Preparation(準(zhǔn)備)* Drawing Up Changeover Instructions. Operations. Tools needed (jigs, dies, moulds, etc.). Fasteners needed (bolts, screws, washers, nuts, clamps, clips, etc.).* Storage, Maintenance and Inspection of Tools and Fasteners.* Gathering and Preparation of New Tools and Fasteners.Transport of Tools and Fasteners to the Process.Step 2 (Re)placement(更換、裝置)* Unfastening and Removal of Old Tools.* Placing the New Tools.* Centering the New Tools.Step 3 Adjustment(調(diào)整)* Fastening New Tools.* Securing the New Tools.* Adjustment of the New Tools.Step 4 Completion(完成、善后)* Transport of Old Tools.* Cleaning, Greasing and Oiling The Old Tools.* Storage of Old Tools.2 Categories(兩種類別)☆ Online Changeover(線內(nèi)更換)Changeover activities Interrupting the process.☆ Offline Changeover(線外更換)Changeover activities alongside the process.1234Online change overProducing product AProducing product B23Online Producing product AProducing product BOffline1Offline44 Stages(四個(gè)階段)Advanced Stage改進(jìn)階段Transferred Stage移轉(zhuǎn)階段Separated Stage分離階段Intermingled Stage混合階段◎ Intermingled Stage(混合階段)* No separation between.* Online and offline operations.* Process is stopped during total change.* New tools are brought in after the process has been stopped.* Neither tools nor fasteners are properly maintained, checked or prepared.* Tools and fasteners are not tidy stored.◎ Separated Stage(分離階段)* Online and offline operations are kept separated.* Process is stopped for online operations only.* All necessary preparations are pleted while the process is going on.* A checklist is available for carrying out offline work.* Maintenance, inspection and preparation of tools and fasteners are carried out offline.* A check is made whether tools and fasteners work properly.◎ Transferred Stage(移轉(zhuǎn)階段)* Online operations are transferred to offline as much as possible.* Height of dies, rams and press blocks are standardized.* All fasteners and spanners are standardized.* Standardized intermediate attachments are introduced.* Adjustment of machines strokes is avoided.◎ Advanced Stage(改進(jìn)階段)* Both online and offline operations are minimized.* Dimensions of all tools are standardized.* Handling of moulds, jigs, dies and forms is standardized.* Hydraulic, pneumatic or magnetic fastening is introduced.* Fastening and adjustment work is simplified or eliminated wherever possible.* Cassettes are introduced.◎ From Intermingled to Separated Stage* Make a clear description of all changeover operations to be executed today (see worksheet).* Prepare a summary list of : all tools needed (jigs, dies, moulds, etc.). all fasteners needed (bolts, screws, clips, etc.).* Classify all operations into: offline activities. online activities.◎ From Separated to Transferred Stage* Transfer operations from online to offline as much as possible.* The use of functional fasteners.* The previous installation of intermediate attachments, bolsters and fasteners.* Introduction of functional dial or pointer readings.Worksheet Nr. :Workstation Nr. :Changeover from toOperationTools amp。20. 操作桿位置之設(shè)計(jì)應(yīng)盡可能讓作業(yè)人員少變更姿勢(shì)。12. 利用重力墜送或自動(dòng)化設(shè)備退料。04. 盡可能利用最低等級(jí)之動(dòng)作。7. 運(yùn)送是否可以簡化?1) 因變更布置減短距離。5) 因雙手交換的動(dòng)作。4) 因工具或設(shè)備的改善。4) 變更工作場(chǎng)所的布置。3) 有利時(shí)合并各動(dòng)作。等待、延遲(Delay)等待、延遲就是因區(qū)缺料、停機(jī)、人機(jī)配合不當(dāng)或工作安排不順,造成人員或機(jī)器設(shè)備之閑置、等待。婦女們個(gè)人寬放時(shí)間比較男人為多,一般多給2 %。 (三)W F(Work Factor)工作因素法之動(dòng)作單元?jiǎng)? 作 單 元符號(hào)備注運(yùn)送(Transport) 伸手、運(yùn)空(Reach、Transport Empty) 移物(Move) 抓取(Grasp)放手(Release)預(yù)對(duì)(Preposition)裝配(Assemble) 機(jī)械裝配(Mechanical Assembly) 表面裝佩(Surface Assembly)拆卸(Disassemble)程序時(shí)間(Process Time)PT Use心智過程(Mental Process) 凝視(Focus) 檢查(Inspection) 反應(yīng)、回憶、計(jì)算 (Reaction、Recall、Compute)!頭轉(zhuǎn)動(dòng)(Head Turn)身體轉(zhuǎn)動(dòng)(Body Turn)走動(dòng)(Walk)HTBTWalk持住(Hold)休息、閑置(Rest、Idle)n影響動(dòng)作之工作因素(Work Factor)丟棄用過之棉花棒投擲鐵塊在輸送機(jī)上推動(dòng)重物箱基本動(dòng)作:無WF重量:W阻力:W伸手至香煙盒穿針動(dòng)作伸手至破玻璃杯口定點(diǎn)停頓:D定點(diǎn)停頓+引導(dǎo):D+S點(diǎn)停頓+謹(jǐn)慎:D+P將積木放置在頂端搬料箱至工作臺(tái)上繞過障礙物之移物定點(diǎn)停頓+引導(dǎo)+謹(jǐn)慎:D+S+P定點(diǎn)停頓+重量:D+W定點(diǎn)停頓+改變方向:D+C四、疲勞或休息寬放(Fatigue or Rest Allowance)之訂定(一)休息寬放時(shí)間定義休息寬放時(shí)間亦稱松弛寬放時(shí)間或疲勞寬放時(shí)間,通常以正常時(shí)間之百分?jǐn)?shù)表示之。10. 眼睛移動(dòng)及注視(Eye Travel amp。* 裝配對(duì)象之難易度。5. 抓?。℅rasp)* 物體擺放之形式。* 移動(dòng)之距離。 (目標(biāo)產(chǎn)量)單位工時(shí)HPU =(瓶頸站工時(shí)NST) 180。 minutes)。 cost Prevention?Organizational efficiency improvement?Value innovationAims?Maintaining efficiency?Improving efficiency?Improving effectiveness amp。 strengthening links with strategiesTools/Means?Analysis amp。 ? 受激勵(lì)速度75單位(Motivated speed/tempo 60 E) 系指一個(gè)作業(yè)人員依照下圖之方式執(zhí)行其工作也就是說在一小時(shí)(鐘表時(shí)間)內(nèi)其總工作內(nèi)容(Work Content)或工作量為75分鐘(包括操作時(shí)間和休息疲勞寬放時(shí)間), 此時(shí)其效率(Efficiency)為125%(亦即75M’s 247。 (作業(yè)人數(shù))單位工時(shí)HPU =(每日可用工時(shí)475分) 180。2. 移物(Move)* 影響「移物」時(shí)間的因素:* 移物至目的地所需要的控制程序。* 物體之尺寸大小。8. 拆卸(Disengage)* 對(duì)象之松緊程度。 Eye Focus)* 視線移動(dòng)之距離。換言之,休息寬放時(shí)間乃是以正常時(shí)間增加若干百分?jǐn)?shù),希望工人在某種情況之下,做某種操作所用之精力,能有恢復(fù)其生理及心理上所發(fā)生疲勞的效果。2. 變動(dòng)寬放時(shí)間變動(dòng)寬放時(shí)間視各個(gè)單元情況不問而變化五、工業(yè)工程之常用工具(一)操作程序分析(Operation Process Chart Analysis)* 操作或作業(yè)程序表(Operation Process Chart)或稱為簡要程序表(Outline Process Chart)* 分析之項(xiàng)目與符號(hào)項(xiàng) 目符號(hào)說 明操作、作業(yè)(Operation)操作、作業(yè)就是將原料、材料、零件或半成品施予物理或化學(xué)之變化。3. 流動(dòng)程序表(Flow Process Chart)或稱為程序表(Process Chart)、流程表(Flow Chart)、程序分析(Process Analysis)或人員分析(Person Analysis)。4) 盡可能簡化各動(dòng)作。5) 合并所用工具。5) 因完成品的自動(dòng)墮送。6. 有無任何動(dòng)作可以簡化?1) 因用較好工具。2) 因變更方向。05. 盡可能利用物體之動(dòng)量。13. 適當(dāng)之照明、通風(fēng)、溫度、相對(duì)濕度