freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

空調(diào)公司1002實(shí)驗(yàn)室質(zhì)量手冊-全文預(yù)覽

2025-08-10 18:56 上一頁面

下一頁面
  

【正文】 calibration site, calibration cycle, calibration method, and acceptance principles, as well as the actions in case of problems. The numbering and auditing of calibration specifications shall follow the “Document amp。 Technical Department is responsible to entrust an inspection anization accredited per ISO/IEC guideline 25, or recognized by the customer, or authorized by national technical supervising authority, to periodically calibrate the test equipment at site. The equipment may be entrusted to the original manufacturer if it has not been calibrated by the authorized inspection anization yet. 對于尚無國際 /國家基準(zhǔn)可追溯的非標(biāo)測試設(shè)備,可由工程技術(shù)部負(fù)責(zé)制訂相應(yīng)校準(zhǔn)規(guī)程,校準(zhǔn)規(guī)程須包括適用范圍、使用設(shè)備、追溯標(biāo)準(zhǔn)、校準(zhǔn)地點(diǎn)、校準(zhǔn)周期、校準(zhǔn)方法、驗(yàn)收準(zhǔn)則以及發(fā)現(xiàn)問題采取措施等,校準(zhǔn)規(guī)程編號、審批按 171。 Technical Department is responsible to calibrate the test equipment according to the “Inspection, Measuring and Test Equipment Control Procedure”. 根據(jù)測試設(shè)備的使用頻次、制造商建議和運(yùn)行狀況和國家檢定規(guī)程由工程技術(shù)部制定測試設(shè)備的校準(zhǔn)周期,并按校準(zhǔn)周期實(shí)施校準(zhǔn)。 Engineering Department is responsible for the routine management of the laboratory, and the maintenance, repair, calibration and test control of the lab equipment. 人力資源部負(fù)責(zé)組織實(shí)驗(yàn)室人員的培訓(xùn)。程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 實(shí)驗(yàn)室質(zhì)量手 冊 Laboratory Quality Manual 版次 Ver 頁次 Page 發(fā)行日期 Release Date 文件編號 (Doc No): AICQ/QP1002 B/0 1 8 20xx0110 1 目的 Objective 為保證檢驗(yàn)和試驗(yàn)數(shù)據(jù)的準(zhǔn)確性,對測試全過程實(shí)行嚴(yán)格控制。 The Technical amp。 The Engineering amp。 For the test equipment beyond the pany calibration ability, the Engineering amp。 For the nonstandard test equipment that has no applicable international/national standards, the Engineering amp。 Follow the “Inspection, Measuring and Test Equipment Control Procedure” and set up the historic records for each test equipment, including calibration record, verification certificate, calibration specifications, etc. 校準(zhǔn)設(shè)備和測試設(shè)備需按 《 檢驗(yàn)、測量和試驗(yàn)設(shè)備控制程序 》 規(guī)定進(jìn)行預(yù)防、搬運(yùn)、儲存。 Technical Department shall pile various test procedures, including applicable scope, equipment for use, test process, and test performance standards, etc, while formulating operation regulations for each test equipment is made by the Engineering amp。 Conduct the test according to the requirements as stated in the “Test Request” and make original records properly. After pleting the test, it is required to write “Test Report”, in which the test part lot No. / delivery No. and delivery date/department shall be indicated, so as to use the Test Report to trace the original records and test part. Meanwhile, place the test part in the area for tested part. 測試試件在測試完畢后可由實(shí)
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1