freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

英文_布勒機(jī)械施工組織設(shè)計(jì)五冶金建-全文預(yù)覽

2025-07-06 21:11 上一頁面

下一頁面
  

【正文】 for construction is separately laid in the plan, thus independent power transmission system is respectively formed in office area, living quarter and producing area for construction. 1. Electricity layout in construction area According to the power equipment layout on construction site, in order to realize the equal utilization of electricity, this project will lay the cable by three lines, one line is switched from the power supply to temporary facilities, another line is for water supply and road, and the last line is for living. 2. All cables are laid along the site road and buried underneath the ground 40cm, filling up sand covered with one layer fireclay brick. The specification of cable is 325㎡ ,equipped with at least five general distribution boxes. all nodes of electricity for construction are switched from general distribution boxes, which are fixed with support abutment. IV. Temporary water supply and drainage system layout for construction 1. Temporary water supply layout for construction (1) Water inlet manifold is supplied to the construction site by owner. Considering the large occupying area and dispersed water consumption point of this project, plan to set up one sag sink at the main inlet, adopt one booster pump for water supply. Onsite internal manifold adopts water pipe of φ100, all branch pipes are of φ50. (2) Except the taps set in water consumption points for construction and living, all other points are planned to set up the taps ofφ20 around. 2. Layout of drainage system The drainage system of whole site is through the main drain, after several settlement, then discharge into the urban sewer. V. Mark: On the entrance and exit road going to the office area, hang four plates one drawing for construction, and safety alarm plate in the safety alarm position。 mixing 9 backhoe 1 20xx 1m3 Excavate earth 10 Frog rammer HM60 2 Wuxi 20xx Backfill 11 Submerge pump QY35 1 Shanghai 現(xiàn)購(gòu) Water pumping 12 13 14 15 16 Chapter III Construction deployment and general layout I. Construction deployment (1) Principle of construction deployment Facing tough petition of building market, all work in the engineering construction should adequately reflect the enterprise guideline and spirit of our pany, emphasizing on ―construction control, quality control and creation control‖ to anize and instruct the construction according to the specific characteristics of this project, which concretely implementing the following tasks: providing the most excellent project manager sector, assigning the construction team that works hard and is apt at overing various difficulties, adopting advanced technical management and wellequipped construction tools, sound and scientific construction schedule and construction scheme. All subsection and items of this project will not be subcontracted without exception. (2) Project development process In terms of our pany’s construction capability and the similar project constructed as before, we are determined and confident to plete the project with high quality on schedule, provide good service for the early application of client. The concrete construction deployment are as follows: 1. Construction process schedule (1) Plane construction section division: Owing to the so many specialties of this project, in order to control the construction quality, plan to divide into twoconstruction section as per the auxiliary building, indoor amp。 l o c a t i o n As per general layout and construction drawings 7 R o a d As per shipment requirements on site 5 W a t e r s u p p l y amp。 Construction, Organization amp。 Design Institute 5. Project term: temporarily defined 30days since August 28th 20xx till September 26th 20xx, 6. Quality standard: Guarantee 100% qualification within once acceptance 8. Works NO Building Structure form Remark 01 Temporary guardroom Steel structure, onefloor 02 Temporary offices Steel structure, onefloor 03 Outdoor/ indoor water and electricity supply Strong/ weak current, drainage and etc. 04 Temporary roads Concrete, gravel and etc. Excluded finish 05 Walls Colored steel sheet Site conditions: Construction site is large, facilitates transportation of Construction materials and equipments, and matches with Construction conditions for auxiliary works and outdoor works. II. Construction features: 1. Quality The project construction covers several disciplines and raises higher quality. Therefore good quality shall be kept in mind through the construction process. Pool efforts to improve project management system, optimize construction technical proposal, strengthen technical handover, strictly control material quality and process check, intensify protection for semiproducts and finished products so that quality of each section, item and step is guaranteed optimum to establish one model project. 2. Schedule Main bottleneck of the project is urgent schedule. To meet the schedule requirement and finish all auxiliary buildings, outdoor water and electricity supply, road pavement, and ground within the main schedule, we will pool sufficient labor, machines and equipments and turnover materials on the one hand. And on the other hand we will prepare one detailed Construction schedule, reasonably allocate Construction, conduct multiprocesses simultaneously as possible and strictly control essential processes to guarantee required schedule or for advance pletion. 3. Safety Safety management is the important part of project management. Large quantity of labor and mechanical equipments, broad construction area and much safety protection workload raise higher requirement for safety management, one dynamic management. 5. Civilized construction Project locates in
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1