freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

搞好設(shè)備管理使企業(yè)效益最大化(英文)-wenkub

2023-03-22 01:06:56 本頁面
 

【正文】 Maintenance) – Risk analysis – Cost benefit analysis ? Achievements – Potential risk and ranking maintenance significant levels – Performance of present maintenance programs – Optimized maintenance program 1/28/2023 17 Maintenance Process Maintenance objective 1/28/2023 18 Systemizing Maintenance Program ? Standardization of maintenance programs Maintenance Concepts (see next page) ? Output – Maintenance programs – Required resources ? Benefits – 75% reduction of maintenance planning time – 25% reduction of maintenance efforts – A systematic, well documented, and auditable process 1/28/2023 19 Requirement Analysis ? Requirements – Contractual regulation – Statutory regulation: Acts or laws – Consensus regulation: with provisions like “in accordance with recognized standards of good production practice” ? Link to: – Plant / System / equipment – Operation ? Crane lifting ? Using high temperature like welding, fire, ? …… 1/28/2023 20 1/28/2023 21 1/28/2023 22 Continuous Improvement ? Reporting and recording maintenance history – Failure findings – Maintenance works ? Analysis of history data – Failures, reasons, and costs – Performance of present maintenance programs – Update / improvement of maintenance programs ? Benefits – A systematic, well documented, and auditable process – Optimized maintenance costs – Increased reliability, availability and product quality 1/28/2023 23 1/28/2023 24 1/28/2023 25 1/28/2023 26 1/28/2023 27 Results of Risk Assessment Improved Program Existing Program
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1