【正文】
id. NOTE: Cracking open a valve involves opening the valve as slowly and as little as practicable until an indication of slow is detected. There will be a hissing noise as the gas starts to exit the valve orifice. This will stop once the line pressure is stabilized. o Source of ignition include, but are not limited to naked flames, embers, hot surface (150oc or 25oc lower than the autoignition temperature, whichever is lower) and nonintrinsically safe electrical connections. o Depending on the position of the fluid in the pipe work prior to putting it into operation, the vent or bleed valve may be operated to allow the displaced initial fluid to escape. During this venting/bleeding/purging process, PersonInCharge is to make sure that everyone within the 30m radius is made known. NO SOURCE OF IGNITION mentioned should be present within 15m radius during this purging. III. When the piping system have been filled and stabilized: o The main line isolation valve shall be operated to the intended operating position. o The vent or bleed valve shall be returned to SHUT position. o Valve Lock Out and Tag Out (LOTO) procedures shall be applied, if applicable. IV. Monitoring After Commencing Operation o PersonInCharge is required to periodically inspect the portion of pipe work that had been put into operation to verify its integrity. Instructions Scope And safetyrelated responsibilities for LPG station Access and movement of LPG container carrier trucks within the industrial pound 1. Container carrier trucks must have a entry card issued by the CVM Magnesium security force in order to access the factory area 2. The vehicle will be subjected to a search and full inspection in case of any leakage or damage on containers before access to the factory. 3. The driver of the container carrier truck must maintain the vehicle speed require when moving within the factory area. 4. The security must ensure that the vehicle plies with all of the stipulations in the abovementioned instructions, vehicle condition and movement instructions. Safety instructions for handling operations in stations 1. Before any filling or transferring of LPG operation begin the container carrying vehicle, must ensure that: ? The trucks is immobilised using brakes. ? Container condition does not show any visible anomaly or defect. ? All valves and accessories are closed and do not show any leaks. ? Grounding is correctly carried out. ? Safety instructions for loading or transferring are displayed, understood and most importantly applied. ? All mobile or electronic equipments must been switching off before filling operation begin. ? All emergency/escape door inside the LPG station been open before filling operation. 2. Before filling or transferring operation begin, facilities technician must ensure no flames or source of fire be found close to the LPG station area. 3. Filling or transferring operations must be performed with the help or guide by facilities technician until pleted of work. Responsibility Filling and transfer responsibilities 1. Safety while filling tank containers at the LPG station for loading operation is the responsibility of the operators involved. 2. Security during the transfer of LPG tank at filling station is the responsibility of the security and operators involved. 3. Before any tank container filling or transfer operation, always ensure that tank containers are grounded. Worker’s responsibilities (1) A worker who is required to use personal protective equipment (PPE) must : ? Use the equipment in accordance with training and instruction. ? Safety headgear/helmet must be worn by a worker in around work area where there is a danger of head injury from falling, flying or thrown objects, or other harmful contacts. ? Damaged headgear / helmet or headgear with missing, mismatched, or modified ponents must be removed from service. ? Safety headgear / helmet must meet the requirements of CSA Standard CAN/, Industrial Protective Headwear. ? Inspect the equipment before use, ? Refrain from wearing protective equipment outside of the work area where it is required. ? Report any equipment malfunction or damages to the supervisor or facilities engineer. ? A worker must wear properly fitting safety eyewear appropriate to the conditions of the workplace if handling or exposed to materials which are likely to injure or irritate the eyes. ? If there is a risk of face injury, suitable face protection must be worn. ? A worker39。 20xx4000Pa,還原爐溫 1220℃177。 ,違犯一次扣 2 分,無故曠工扣 30 分。 、不許玩電腦游戲,發(fā)現(xiàn)一次扣 1 分。 5. 天然氣 管理制度 ,防止事故隱患,所以電腦操作和煤氣壓力操作工同時(shí)肩負(fù)著兩項(xiàng)工作 。 ,原則上,不合格產(chǎn)品不予入庫。 ,未經(jīng)許可其他人員一律嚴(yán)禁進(jìn)出。 4. 成品庫管理制度 ,因此成品管理員必須對進(jìn)出產(chǎn)品清點(diǎn)數(shù)量,檢查質(zhì)量,建立帳冊,確保帳物相符。 標(biāo)準(zhǔn)件在執(zhí)行交舊領(lǐng)新時(shí),必須按原有數(shù)量交回 80%以上的舊部件,否則考核領(lǐng)用單位 210 分 。 除一次性消耗材料外,其它材料領(lǐng)用均執(zhí)行交舊領(lǐng)新制度,有使用價(jià)值的部件在交舊領(lǐng)新時(shí)單獨(dú)存放。 : 除廠部供銷科所轄的范圍 外,其余的備品備件由各車間統(tǒng)一負(fù)責(zé)保管、使用管理等工作。個(gè)人工器具在使用期內(nèi)不予辦理新工器具的領(lǐng)用手續(xù),一年后更換損壞的工具。 Car insurances tools approved by Car insurances special safety security any lost, stolen and spoil payable following the actual car insurances and security 2 point. 個(gè)人工器具,由車間指定專人在遵循上述第一條的情況下統(tǒng)一領(lǐng)取,做好發(fā)放登記卡一式三份,一份交核算,一份交設(shè)備科,一份交車間保存。 Agreement tools car insurances fee, account, new and old procrdures approved by director, except new activities. Sepcial tool uses procedures 各車間如需臨時(shí)使用特殊工器具,由車間工器具管理員到保管庫辦理借用手續(xù)后方可領(lǐng)取,使用完畢后 24 小時(shí)內(nèi)返回倉庫,同時(shí)保證工器具干凈、完好 (正常磨損除外 ),否則考核借用人 2 分,車間 1 分。如防護(hù)面罩等。 Workers due to job changes, labor supplies are adjusted accordingly, the adjusted labor paid by the workshop director, in charge of director approval before sequential exchange. 每月正常使用的勞保,由車間開票,經(jīng)車間主任簽 字后,主管廠長審批。 5 days per month reported to the pany for the factory labor planning time, 1015 issued to factory labor time. PPE issued by the Office o