【正文】
requirements, etc. 8) Design review Reviews to assess that design results at appropriate design stages such as DR 1,2,3 formal reviews, etc. 9) Design output Output produced by design activities such as drawings, BOM, standard, or design S/W, etc. 10) Design verification Actions for verifying and confirming in accordance with the specified procedure that design output meets the design input requirements. 11) Design validation Actions for ensuring in accordance with the specified procedure that product meets user needs and requirements. 12) subcontractor A supplier of adequate materials or parts that is qualified and registered by appropriate assessment. VACUUM CLEANER division Revised : LG(71) COMMON 005 A4 MO (950301) LG ELECTRONICS PAGE : 6 LG(71)A1502 Environmental Management/Quality Assurance Manual 13) Special process Process which could not be fully verified the deficiency by inspection and testing and could be verified it only after using for a ling time. 14) Nonconforming product Parts and products that deviate from specified requirements such as measure on drawings, standards and specifications, etc. 15) Customer supplied product The materials or parts to be used for the products that are supplied directly by the purchaser(Customer). 16) Quality document The document, affecting quality, which is possible to review, approve, revise, distribute, reissue, etc,as necessary 17) Quality record The document, furnishing objective evidence of activities performed or results achieved, which is impossible to change or modify. 18) Management review The activities to review and supplement the current quality system by division director(or his representative) through periodical internal quality audit, quality conference, customer claim analysis, etc) VACUUM CLEANER division Revised : PAGE :7 LG(71)A1502 Environmental Management/Quality Assurance Manual LG(71) COMMON 005 A4 MO (950301) LG ELECTRONICS Ⅱ . Quality Management system 1. Quality Management System Purpose and Scope Vacuum Cleaner division shall establish, maintain and control a documented Quality system as a means of ensuring that product conform to specified requirements. Establishment and revision of Quality Manual This manual shall be Established : and Established : the basic of international standard ISO 9000 and customer requirements. This manual shall be prepared by the personnel appointed by the manager of Quality Assurance Group, reviewed by manager of each department, and Established : after approval of the division Director Manual revision shall be prepared, reviewed and approved in accordance with the same procedures as the establishment. When the related standard?s improvement is required or the related laws and international standard (ISO 9000) are changed, the Manager of Quality Assurance Group shall review and revises the manual properly. Distribution and control of Quality Assurance Manual Quality Assurance Manual should be able to access and inquiry in LGE System, the original copy should be reserved at quality assurance Group No part of this manual shall be copied, distributed, mailed, or without the approval of the manager of Quality Assurance Group. VACUUM CLEANER division Revised : PAGE :8 LG(71)A1502 Environmental Management/Quality Assurance Manual LG(71) COMMON 005 A4 MO (950301) LG ELECTRONICS Upon manual distribution, all copies shall be classified into controlled copy and uncontrolled copy, and the meaning of which is as follows: 1) Controlled copy : The copy that distributed to related Dept., and revised contents should be surely distributed afterwards. 2) Uncontrolled copy : The copy that is distributed outside for reference only after approval of the Manager of Quality Assurance Group. The revised contents need not be distributed. The controlled copy shall be controlled so as to maintain the status at distribution time and each Dept. shall not modify the contents or add their descriptions Document structure of quality assurance system A documented quality system of Vacuum Cleaner division consists of as follows: Level Ⅰ Quality Assurance Manual Level Ⅱ Procedures (Regulations, Standards) Level Ⅲ Instructions and Guides Organizational structured Responsibility and Authority Basic stipulations Sequence of workflow of each Dept. Detailed guidance Related standards Document control procedures : LG(71)A2502 Standard control procedures : LG(71)A2503 VACUUM CLEANER division Revised : PAGE : 9 LG(71)A1502 Environmental Management/Quality Assurance Manual LG(71) COMMON 005 A4 MO (950301) LG ELECTRONICS Process approach metho