freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯-如何搞好建設(shè)項(xiàng)目的工程造價(jià)控制(已修改)

2024-08-25 06:45 本頁面
 

【正文】 附錄1How to improve construction project cost control A construction project the importance of cost control of construction project cost control of projects through the entire process, that is, decisionmaking phase of the project, the project design stage, project implementation and pletion stages of phase related to the construction project cost control. Statistics show that the decisionmaking stage in the project and design stage, the impact of the possibility of project cost 30% 75%, and in the implementation phase of the impact of the possibility of project cost is only 5% 25%. It is obvious that the key to cost control is the implementation of the project prior to decisionmaking and the design phase of the project, the project is the deciding factor in decisionmaking, and is a key factor in design. Control project cost not only to prevent breakthrough investment limit, meaning a more active is to promote the construction, engineering, and design units to strengthen the management of human, material and financial resources with limited resources can be fully utilized to obtain the best economic and social benefits . So do a good job in project cost control, to ensure and accelerate the economic development thinking has a certain significance. Second, construction project cost control measures for construction project cost control is effective decisionmaking in the investment phase, design phase, construction phase contract, the contract implementation phase of the construction project cost control in the amount of the approved project cost limit, occur at any time to correct deviations, and ensure the realization of investment objectives of the project to various construction projects in a reasonable manner to the use of human, material and financial resources to obtain better investment returns, and ultimately to enable the pletion of audited accounts to control the amount of the budget to avoid the three super phenomenon, in order to effectively control the project cost should be doing the work of the following aspects: (a) decisionmaking phase of the project cost to determine the cost of control engineering and control projects through the entire process, but the technical and economic decisionmaking stages of policymaking, project cost of the project very much affected by something, especially to determine the level of construction standards, building site selection, technology selection, equipment selection, etc., is directly related to the level of project cost. According to the data in various stages of construction projects, investment decisionmaking phase of the impact of the highest degree of project cost, for a total of 8090%. Therefore, the decisionmaking phase of the project is to determine the content of the decision
點(diǎn)擊復(fù)制文檔內(nèi)容
法律信息相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號(hào)-1