freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯-如何搞好建設(shè)項目的工程造價控制-展示頁

2024-08-23 06:45本頁面
  

【正文】 ation, started from the estimates reflected the accuracy and pleteness of the construction investment project. Second, the investment must be designed to estimate a true reflection of the investment estimates should be realistic and reflect the design of content, which requires designers and project from the engineering content of the size of a true reflection of design intent. The main technology to be relatively more programs, programs to optimize the design of the program is not only technically feasible but also economically more reasonable. Therefore, the project economybuilding programs from the beginning of the optimization, it should penetrate into the whole process designed to, in accordance with the principles of project cost management, a reasonable estimate of projected changes in a variety of dynamic factors, as far as possible, do not play enough to stay investment gap This is the preparation of estimates of key investment is also an important basis for the next stage. (B) the design phase of project cost control project engineering design was to conduct a prehensive planning and specific intent to describe the process of implementation is the soul of the construction, dealing with technology and the critical link in economic relations, is to determine and control the focus of project cost stage. First, optimized design, the design of effective control of project cost if the quality and try to meet the national requirements, functions are used to meet requirements related to construction projects only a onetime investment to meet the application requirements, not only construction projects related to the number of onetime investment, but also in the pletion After delivery of the impact of the economic benefits of the project. Foreign experts pointed out that although the design of the project costs represent a small proportion of total investment, less than 1%, but the impact of its project cost to achieve the level of 75%. It is clear that the project design stage to do a good job of cost control is cost effective control of the key, reconstruction, light design concept must be overe to control the cost of the project design should start. Therefore, the construction units and design units in the review of the design, attention should be paid to design optimization, the use of various indicators of the overall plan of the factory, industrial building design analysis of space pared to the design of these two aspects of the project cost, not only have a significant impact, and after the construction and operation of the production, management has a significant impact. Second, the implementation of projects designed to control project cost limit, in the design process used in the design limit. The socalled limit is in accordance with the a
點擊復(fù)制文檔內(nèi)容
法律信息相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1