【正文】
《石油化工設(shè)備和管道隔熱技術(shù)規(guī)范 SH3010—2000》“Technical criteria on petrochemical processing equipment and pipeline insulation SH3010—2000”l 《石油化工設(shè)備和管道涂料防腐蝕技術(shù)規(guī)程 SH3022—1999》“Technical regulations on anticorrosion of petrochemical processing equipment and pipeline coating SH3022—1999”l 《石油化工工程建設(shè)交工技術(shù)文件規(guī)定 SH3503—2001》Regulation of Technical Turnover Document for Construction of Petrochemical Industry Project, SH3503—2001l 《工程測量規(guī)范 GB50026—1993》“Construction Survey and Measure Standards GB50026—1993” l 《鍋爐壓力容器焊工考試規(guī)則》“Regulation on welder examination and management for boiler, pressure vesselsamp。 pressure piping”l 《壓力容器焊接工藝評定 JB3964》 “Craft evaluation on pressure vessels welding JB3964—”l 《石油化工設(shè)備安裝工程質(zhì)量檢驗評定標準 SH3514—2001》 Standards of Quality Inspection /Evaluation for Installation/Erection of Petrochemical Equipment, SH3514—2001l 《石油化工絕熱工程施工工藝標準 SH/T3522—1991》 Standard for Construction of Petrochemical Industrial Thermal Insulation Work, SH/T3522—1991l 《工業(yè)設(shè)備及管道絕熱工程施工及驗收規(guī)范 GBJ1261989》 Code on Construction and Acceptance Inspection of Thermal Insulation of Industrial Equipment and Pipeline, GBJ1261989l 《設(shè)備及管道保冷技術(shù)通則 GB/T117901996》 General Regulation for Cold Insulation of Equipment and Pipeline, GB/T117901996l 《設(shè)備及管道保暖技術(shù)通則 GB42721996》 General Regulation for Thermal Insulation of Equipment and Pipeline, GB42721996l 《工業(yè)設(shè)備及管道絕熱工程質(zhì)量檢驗評定標準 GB501851993》 Standar for Construction Quality Inspection and Evaluation of Thermal Insulation Work of Industrial Equipment and Pipeline, GB50185199施工技術(shù)措施Construction schemes of various specialties and technical measures for construction eneral introduction,位于xx。根據(jù)合同規(guī)定,該項目由CC設(shè)計、供貨、現(xiàn)場制造及安裝罐區(qū)xx個儲罐。This project is the tank farms of Petrochemical Project jointly constructed by xx. The tank farms is located at Dayawan Bay of Huizhou City in Guangdong Province. According to contract terms, this project is designed and supplied by CC, and CC is responsible for field manufacturing and installation of xx storage tanks in the tank farms. : Characteristics of Project、HSE要求高、管理程序多,質(zhì)量要求嚴格。 The construction farms is big, with high quantity, high and strict quality demand. The requirements of HSE is strict, the management procedure of HSE is various.:按合同,有效施工工期只有 11個月。去掉陰雨,臺風的影響,實際有效施工工期還要減少,任務(wù)非常艱巨。Pressing project time limit: According to the contract, the effective construction time is only 11 months. If considering the influence of drizzle and typhoon, the actual time is even shorter. The task is hard.,施工區(qū)域分散,儲罐規(guī)格數(shù)量多。Construction fields are distributed dispersedly, the specifications of storage tanks vary and the number of tanks is high. ,風多風大,屬臺風多發(fā)地,空氣相對濕度大。The site is close to the coast, featuring frequent and big winds and frequent typhoon and high relative humidity. Quality target%%The check out percent of steelwelded is 95 once. %The check out percent of construction acceptance is 100 once.% The choiceness percent of unit construction is 85 . and management system of construction quality在進入施工現(xiàn)場前,成立項目質(zhì)量管理小組,并開展工作,為進場施工做好充分準備。質(zhì)量管理工作貫穿整個施工過程,接受XX/PMC/監(jiān)理的監(jiān)督和審核。Before moving into the construction site, we shall establish our quality management group for the project, and put it into service so as to get ready for construction. Quality management operations shall be carried out during the entire construction process under supervision and audit by XX/PMC/監(jiān)理.施工質(zhì)量管理小組由項目經(jīng)理、施工經(jīng)理、現(xiàn)場QA/QC經(jīng)理、各專業(yè)QA/QC責任人和各專業(yè)施工部門主要負責人、施工班組骨干共同組成,形成全員質(zhì)量管理網(wǎng)。它的主要職責是制訂和通過現(xiàn)場各項質(zhì)量檢查制度,組織現(xiàn)場質(zhì)量檢查,召開現(xiàn)場質(zhì)量會議,對現(xiàn)場的質(zhì)量問題做出有效的處理意見。Construction Quality management group is posed of project manager, construction manager, field QA/QC manager, persons responsible for specialty QA/QC , major principals and cadreman of all professional construction units, that will e into being quality management net of all person. Its main functions: to establish all field quality inspection systems, to organize field quality inspection, to hold field quality meetings, and to put foreward effective treatment proposals on field quality problems.項目施工質(zhì)量管理小組成員:Members of construction quality management group:lue ?。篛rganizational structure of construction quality management group:Lue:Instructions to organizational structure of construction quality management group:項目經(jīng)理是工程質(zhì)量的總負責人,對項目質(zhì)量控制負責,貫徹落實各級質(zhì)量負責人的崗位責任;QA/QC工程師負責本項目的質(zhì)量策劃和控制;各專業(yè)質(zhì)量負責人是日常質(zhì)量管理工作的主要負責人,負責現(xiàn)場的工程質(zhì)量管理;各部門的施工生產(chǎn)主要負責人是施工質(zhì)量負責人,在布置崗位、調(diào)整分工的同時還要下達工作質(zhì)量要求,明確質(zhì)量責任,做到質(zhì)保體系和工作機構(gòu)一體化,保證質(zhì)保體系與施工活動有效的同步運轉(zhuǎn)。Project manager is the chief principal responsible for engineering quality. QA/QC engineer shall be in charge of planning and control of the construction quality. Quality principals of various work teams shall be the chief principals responsible for routine quality management and field management of engineering quality. The chief principals responsible for construction operation of the sections shall be the construction principal, who shall designate jobs, regulate task divisions, make known to lower levels the requirements for work quality, define quality responsibilities, integrate quality assurance system and operating mechanism, and ensure effective an synchronous operation of quality assurance system and construction activities.各專業(yè)質(zhì)量負責人作為整個工程質(zhì)量的管理核心,負責對所在專業(yè)的施工質(zhì)量進行全面管理,指導并監(jiān)督各施工階段工藝卡的下發(fā)、運轉(zhuǎn)和回收,保證質(zhì)量管理工作上下協(xié)調(diào)一致。Quality principals of the work teams, as the core of overall engineering quality management, shall take charge of the overall management of construction quality of relevant specialty, directing and monitoring the issuance, operation and callback of technique cards at each construction stage, and ensuring the consistency of quality management at all levels.項目施工質(zhì)量管理小組的工作應(yīng)達到以下目的:使質(zhì)量體系滿足標準和合同要求;及時發(fā)現(xiàn)質(zhì)量管理中的問題,加以糾正和預防;不斷改進和完善質(zhì)量體系,使質(zhì)量體系持續(xù)地保持其有效性。Construction quality management group must meet the following request:Makes quality system accord with standard and contract request。Finds the prob