【正文】
cuments have been submitted for verification. ? 12) 分包單位資格審查文件已報(bào)審; ? 13) Experiment (test) units’ qualification documents have been submitted for verification. 試驗(yàn)(檢測(cè))單位資質(zhì)審查文件已報(bào)審; ? 上道工序已完工并驗(yàn)收合格。 承包單位(章): 項(xiàng)目經(jīng)理: 日 期: 項(xiàng)目監(jiān)理 機(jī)構(gòu) 審查意見: Supervision anization’s review : 項(xiàng)目監(jiān)理 機(jī)構(gòu) (章): Supervision anization(stamp): 總監(jiān)理工程師: cheif supervision engineer: 日 期: Date: 建設(shè)單位審批意見: employer’s verification: 建設(shè)單位(章): Employer(stamp): 項(xiàng)目 代表 : Project representative: 日 期: Date: Filling notes: 1. This table is of sets, which shall be filled by Contractor. Employer、 supervision anization one set each, set for contractor. 2. The items with mark of “ □” need to be enclosed as supporting documents when submitting the form,the items will be marked with “ √” after supervision anization’s verification and approve. 3. The key verification points of Supervision anization: whether the preparation of starting the work is sufficient。 whether the relevant verification applings have been finished。 whether it is well prepared for mencement. 填 報(bào) 說明 : 本表一式 份,由承包單位填報(bào),建設(shè)單位、項(xiàng)目監(jiān)理 機(jī)構(gòu) 各一份,承包單位 份 。 報(bào)審中的“ □”作為附件附在報(bào)審表后,項(xiàng)目監(jiān)理機(jī)構(gòu)審查確認(rèn)后在框內(nèi)打“ √”。 項(xiàng)目 監(jiān)理 機(jī)構(gòu) 審查要點(diǎn):工程各項(xiàng)開工準(zhǔn)備是否充分;相關(guān)的報(bào)審是否已全部完成;是否具備開工條件。 表 工程復(fù)工申請(qǐng)表 Table Resumption of work applying form 工程名稱: 編號(hào): Project name: No.: 致 : 項(xiàng)目監(jiān)理 機(jī)構(gòu) To: supervision anization 第 號(hào)工程暫停令指出的 工程停工因素現(xiàn)已全部消除,具備復(fù)工條件。特報(bào)請(qǐng)審查,請(qǐng)予批準(zhǔn)復(fù)工。 All suspension elements mentioned in project suspension order with number of have been eliminated for Project. Please kindly arrange for verification and give the permit for work resumption. 附: 整改自查報(bào)告 Encl.: rectification and selfexamination report 承包單位(章): Contractor(stamp): 項(xiàng)目經(jīng)理: Project manager: 日 期: Date: 項(xiàng)目監(jiān)理 機(jī)構(gòu) 審查意見: Supervision anization’s verification: 項(xiàng)目監(jiān)理 機(jī)構(gòu) (章): Supervision anization(stamp) 總監(jiān)理工程師: Chief supervision engineer: 日 期: Date: 建設(shè)單位審批意見: Employer’s verification: 建設(shè)單位(章): Employer(stamp): 項(xiàng)目 代表 : Project representative: 日 期: Date: 填 報(bào) 說明 : 本表一式 份,由承包單位填報(bào),建設(shè)單位、項(xiàng)目監(jiān)理機(jī)構(gòu)、承包單位各一份。 Filling note: This table is of sets, the table shall be filled by Contractor. The employer、 supervision anization and contractor each one set. 表 施工組織設(shè)計(jì) 報(bào)審表 Table Construction management plan verificati