freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

地下grp管道施工方案-文庫吧

2025-04-13 01:44 本頁面


【正文】 esin measure and mixture.? Dispensing bottles(or similar tools) and chemical agent bottles for measuring and bringing catalyst to site.? Brass bristles, plastic brush, cleaning basin, duster cloth for tools cleaning.6. lamination Process SequenceMaterial receivingExcavation and bedding(by civil)TransportationAnd Arrange SpoolCutting(if required)GrindingInside cleanness Inspection and Fit uplaminating of JointVisual inspectionBarcol hardness testFull water testCoordinate and elevation measurement7. Bonding MaterialsUsed ponents RESIN: Epoxy vinyl ester resin supplied from Amiantit, and to be mixed it with catalyst.CATALYST: Methyl ethyl ketone peroxide .Mat amp。 WOVEN ROVING: glass reinforcement for joint structure.BONDING MATERIALS STORAGE and USAGE:Details see attachment A: Field Butt amp。 Wrap Joint Procedure Page 4 to 5.The location of resin, WFluid, catalyst amp。 glass reinforcement container as show in figure 71 Figure 71Storage outline of chemical container details see attachmentF: Interior layout for Amiantit Resin amp。 Catalyst8. Receiving, Handling and Storing of PipeDetails see attachment B: Installation and Handling Instructions For Rigid Joint Pipe Page 2 to 4.Inspecting Pipe● All pipes receiving at site shall be inspected according to Specification for Piping Material. ● Broken pipe bundles, crushed fittings boxes should be checked carefully, scratched and gouged and pipe with crushed or split ends are not allowed to use, damage claims procedures must be initiated prior to accepting the shipment.● Do not dispose of any damaged items. If any imperfection or damage is found, immediately segregate the affected pipes and contact Dealim. Do not use pipe that appears damaged or defective.Handling Pipe● Pipes, fittings and prefabricated parts (spools) have to be transported by suitable trucks. These trucks must have flat floors. Check and remove any projections or nails etc. before each load. Materials must be secured for example by using wedges and wooden supports. These supports must have a minimum width of 10 cm, avoiding sharp edges. The support distances must not exceed m.● Do not lift the pipe by passing a rope through the section end to end.● Any part of the truck has to be protected by wood or rubber wherever in contact with the products. If pipes are handled by a forklifter, the forks must be covered with rubber or plastic.● For work on the pipe, such as cutting, preparing ends, or cleaning, twopoint support is remended for 20foot lengths, and threepoint support for 40foot lengths. Support wood should be ensured no nails.● The best way for fittings to be transported is in crates or onto pallets. Direct contact between products during transport must be avoided.Pipe Storage● Do not lay the pipes directly on the ground, rails or concrete floors.● Ensure suitable supports are used for example wooden beams, measuring 10 x 5 cm. To avoid damage to machined pipe ends, stacking should be undertaken with care. The machined ends must be protected for example by polyethylene covered straw mats or polyethylene netting.● If the product is stacked too high for long storage periods (612 months). It is remended tha
點擊復制文檔內容
公司管理相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1