freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

地下grp管道施工方案(存儲版)

2025-05-28 01:44上一頁面

下一頁面
  

【正文】 ent7. Bonding MaterialsUsed ponents RESIN: Epoxy vinyl ester resin supplied from Amiantit, and to be mixed it with catalyst.CATALYST: Methyl ethyl ketone peroxide .Mat amp。 Wrap Joint Procedure Page 8 FIELD JOINT KITS.Each joint kit should be stored in a close room to avoid dust, damp amp。 Catalyst AttachmentEU/G GRP PIPING ORGANIZATION CHARTMaterial ManagerSUN changgenStorage ManagerHU zhongkuiQC InspectorYANG zuoxuQC SupervisorHOU manyiLaminating teamIncharge:Peng .Supervisor:Zhang .QC: Xu .Workingcrew: 4Transportation team Incharge:Ge ZaiqiaoWorkingcrew: 1Fitting team Incharge:Peng .Supervisor:Zhang .QC:Xu .Workingcrew: 2GRP ManagerLI wanjinAll manage staff, foreman and leaders for lamination have been trained by pipe vendor before starting work at site. workers who are trained and qualified shall be over 40% of all workers involved in GRP piping construction. 2 Supervisor and 1 QC inspector shall be trained before working start, and 1 coordinator may be needed together with them. AttachmentF Interior layout for Amiantit Resin amp。 Wrap Joint Procedure Page 12 to 14.13. AttachmentsAttachmentA Field Butt amp。 Wrap Joint Procedure Page 7. Fitting up1 Check the alignment and fixing the pipe ends as close as possible, then prepare the putty.2 Apply the putty with a putty knife filling all the gap。 wrap joint lamination3. Reference1 The drawing of 080036AADA100201~400207 U/G Composite DWG2 Specification:080036AASG007 Specification for Underground Piping amp。 Surface Drainage080036XHSG003 Specification for piping construction080036XZSG001 Specification for Piping Design080036QZPL001 Project Quality Plan080036XHSG006 Specification for Identification of Piping Material080036XHSL005 Specification for Piping Material AMIANTIT document:Field Butt amp。3 After the filling of the gap, the putty shall polymerize, without moving and bumping the pieces. 4 Once pleted the hardening of the putty, grind the outside of the pipe joint and clean with air blow and clean duster cloth.Note : The gap should not exceed the 5 mm or as per remended by Pipe manufacturer at any case. Field Joint Kits PrepareDetails see attachment A: Field Butt amp。 Wrap Joint ProcedureAttachmentB Installation and Handling Instructions For Rigid Joint PipeAttachmentC Field Lamination Process SheetAttachmentD JHA for GRP Piping Installation In ACVC PlantAttachmentE U/G GRP Piping Organization ChartAttachmentF Interior layout for Amiantit Resin amp。 Wrap Joint Procedure Page 12 and attachment B: Installation and Handling Instructions For Rigid Joint Pipe Page 7.11. Quality Requirements1. The joint specification should be verified as per the AMIANTIT process.2. Visual inspection of the laminated joints for external layup.3. Checking the lamination thickness using the measuring tapes also the lamination width.4. Barcol hardness to check the lamination hardness should not be less than 30HBa.5. Full water test is used for gravity flow pipe when it’s pleted. During test for filling with water, the piping shall be full of water, it will be accepted if the water level not lowering.6. Before buried, the coordinate
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1