rained and skilled.Other details see attachment A: Field Butt amp。Method Statement Underground GRPPiping Installation WorksTitle:Underground GRP Piping Installation ProcedureTCC Prepared ByName : Position :Signature :Date :DAELIM ApprovalName :Position :Signature :Date :Approved By ClientName :Position :Signature :Date :Rev. 0This Document is the property of TCC. Issued to, and used by others needs the written approval of the TCC Quality Manager.CONTENTS Purpose Scope Reference Responsibilities Equipments and Tools Lamination Process Sequence Bonding Materials Receiving Handling and Storing of Pipe Arrange Pipe in Trench Joint Laminate Procedure Quality Requirements Safety Precaution Attachments1. PurposeThis method statement is to guide butt joint wrap lamination work of U/G GRP piping system in the Arabian Chlor Vinyl Project.2. ScopeThis Method Statement covers the field lamination joints installation method of underground GRP piping. This procedure is applicable to all U/G GRP pipe diameters.Related data of U/G piping GRP part is as following:System descriptionMaterial classDiameter rangeConnection MethodW WDGAANA4”,6”,8”,10”,12”,20Butt amp。 Wrap Joint Procedure Page 12 and attachment B: Installation and Handling Instructions For Rigid Joint Pipe Page 7.11. Quality Requirements1. The joint specification should be verified as per the AMIANTIT process.2. Visual inspection of the laminated joints for external layup.3. Checking the lamination thickness using the measuring tapes also the lamination width.4. Barcol hardness to check the lamination hardness should not be less than 30HBa.5. Full water test is used for gravity flow pipe when it’s pleted. During test for filling with water, the piping shall be full of water, it will be accepted if the water level not lowering.6. Before buried, the coordinates and elevation of the pipe should be checked as per posite drawing.7. All quality inspection work should be according to ITP from DEALIM.12. Safety PrecautionForbidden under loading/hoisting the pipe by passing a rope through the section end to end.Don’t use unsafety machine when cutting and grinding, antidust coveralls clothes, full face shield and dust mask should be used for grinding.Chemical splash goggles is remended for chemicals operating。3 After the filling of the gap, the putty shall polymerize, without moving and bumping the pieces. 4 Once pleted the hardening of the putty, grind the outside of the pipe joint and clean with air blow and clean duster cloth.Note : The gap should not exceed the 5 mm or as per remended by Pipe manufacturer at any case. Field Joint Kits PrepareDetails see attachment A: Field Butt amp。 wrap joint lamination3. Reference1 The drawing of 080036AADA100201~400207 U/G Composite DWG2 Specification:080036AASG007 Specification for Underground Piping amp。 Wrap Joint Procedure Page 12 to 14.13. AttachmentsAttachmentA Field Butt amp。 Wrap Joint Procedure Page 8 FIELD JOINT KITS.Each joint kit should be stored in a close room to avoid dust, damp amp。 wrap joint laminationPCSDGAANA4”Butt amp。 WOVEN ROVING:SILICAN: Low hazard for usual handling. Repeated exposure may cause skin dryness or crack