freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

鎧裝式金屬封閉開關(guān)設(shè)備安裝使用維護(hù)手冊-閱讀頁

2025-07-03 02:01本頁面
  

【正文】 anel or outgoingline panel are diagram of basic switchgear panel,there are other derivative diagram,for example ,contact panel or metering panel .in addition,There are so many diagram of the switchgear panel with stationary type load switch、(SF6)VCB truck、VC truck、Disconnect truck. The panel has two maintenance modes. That is singleface maintenance and doubleface maintenance. The detail of structure and main ponents, can reference order document. Enclosure and clapboard開關(guān)柜的外殼和隔板由優(yōu)質(zhì)鋼板制成,具有很強(qiáng)的抗氧化、耐腐蝕功能,且剛度和機(jī)械強(qiáng)度比普通低碳鋼板高。出現(xiàn)內(nèi)部故障時(shí),高壓室內(nèi)氣壓升高,由于柜門已可靠密封,高壓氣體將沖開壓力釋放板釋放出來。低壓室D裝配成獨(dú)立隔室,與高壓區(qū)域分隔開。卸下緊固螺栓就可移開水平隔板,便于電纜密封終端的安裝。當(dāng)手車從運(yùn)行位置向試驗(yàn)/隔離位置移動(dòng)時(shí),活門會(huì)自動(dòng)蓋住靜觸頭,反向運(yùn)行則打開。VCB truck is installed in VCB vault B with track, may move in the middle of the position to service and test/disconnected. While the truck move from service position to test/disconnected position, the valve can cover unmove contact in selfmotion, open when moving reverse. The truck can be operated when the truck vault door is closed, while you can watch the position of the truck, on (VCB tripping)/off(VCB closing) push knob in the truck, close and open indicator and charging/releasing indicator by inspection window. 斷路器手車 VCB truck手車可采用手動(dòng)進(jìn)行移動(dòng)。具有彈簧觸頭系統(tǒng)的觸臂裝在斷路器的極柱上,當(dāng)手車插入到運(yùn)行位置時(shí)起電氣聯(lián)接作用。手車剛插入開關(guān)柜就固定在試驗(yàn)/隔離位置,同時(shí)也可靠地聯(lián)接到開關(guān)柜的接地系統(tǒng)。除真空斷路器外,手車可配真空接觸器、隔離裝置和計(jì)量設(shè)備等。矩形的分支母線直接用螺栓聯(lián)接到主母線上,不需任何聯(lián)接夾。套管板和套管將柜與柜之間的母線隔離起來,并有支撐作用。The bus bar from one switchgear to the other switchgear is fixed with the bushing and the ramus bus .The ramus bus is connection to the main bus with the bolt, it needn’t any clip. All bus and the ramus bus are covered with pyrocondensation bushing. The panel of bushing and bushing are isolated between the switchgear and the switchgear. And it has the effect on supporting.電纜室(圖3/1)Cable partment(drawing 3/1)電流互感器和接地開關(guān)裝在電纜室后部。當(dāng)電纜室門打開后,有足夠的空間供施工人員進(jìn)入柜內(nèi)安裝電纜(最多可并接6根)。底板中穿越一、二次電纜的變徑密封圈開孔應(yīng)與所裝電纜相適應(yīng),以防小動(dòng)物進(jìn)入。CT and earth switch are installed on the back of the Cable Compartment. The Surge arrester is also installed on the Cable Compartment. When the truck and the horizontal panel are moved .There is enough room so that the worker install the cables (the most is 6).The bottom of panel that lie on the ining of cable in made of the stainless steel panel,It is uncork, disassembly so that working on the local. The airplane of panel where is together secondary cable make sure as same as the installed cable prevent the small animal being into it.For the cable trench in humidity,It is suggested that the switchgear is airproofed with fireproofing mud and epoxide resin.低壓室(圖3/3/2) Lowvoltage partment (figure 3/3/2)開關(guān)柜的二次元件裝在低壓室內(nèi)及門上。低壓室側(cè)板上有控制線穿越孔,以便控制電源的聯(lián)接。聯(lián)鎖裝置地功能如下:A series of interlocks are provided to prevent mishandling, thus protecting both personnel and switchgear itself. The function of interlocks is following: 216。在這種分 閘狀態(tài)下,反向移動(dòng)也行(機(jī)械聯(lián)鎖)。 手車已完全處于試驗(yàn)或運(yùn)行位置時(shí),斷路器才能合閘(機(jī)械和電氣聯(lián)鎖)。 手車在試驗(yàn)或運(yùn)行位置而沒有控制電壓時(shí),斷路器不能合閘,僅能手動(dòng)分閘(電氣聯(lián)鎖)。 手車在運(yùn)行位置時(shí),控制線插頭被鎖定,不能拔出。 手車在試驗(yàn)/隔離位置或移開時(shí),接地開關(guān)才能合閘(機(jī)械聯(lián)鎖)。 接地開關(guān)關(guān)合時(shí),手車不能從試驗(yàn)/隔離位置移向運(yùn)行位置(機(jī)械聯(lián)鎖)。 可在手車和/或接地開關(guān)操動(dòng)機(jī)構(gòu)上安裝附加聯(lián)鎖裝置,如閉鎖電磁鐵,用戶在訂貨時(shí)應(yīng)提出要求。母線、緊固件和附件是單獨(dú)包裝的。特別是海上運(yùn)輸,即使是裝在集裝箱內(nèi),也應(yīng)用塑料薄膜袋將開關(guān)柜封裝起來,放入合適的干燥劑以防受潮。每臺(tái)開關(guān)柜都裝有4個(gè)吊耳。 吊車,叉車或人工起吊架。 用吊車裝載Loading with crane216。Lifting rope should have enough carrying capacity. The unlock width of lifting hook should not less than 30mm.216。以上。.216。The lifting lugs are permitted to have relevant bend when the switchgears are lifted. Delivery and intermediate storage開關(guān)柜到達(dá)現(xiàn)場時(shí),收貨人有責(zé)任(但不限于)做如下工作:When the switchgears are in locale, the duties of the consignee include the following (not only):216。Inform CJEC service engineers to join the work of opening box, checking and accepting.216。開關(guān)柜的標(biāo)記及合格證是否正確齊全,有無說明書。如果需要中間存儲(chǔ)時(shí),還要放入干燥劑,重新密封。 詳細(xì)記錄任何短缺、缺陷和運(yùn)輸損傷,并及時(shí)通知有關(guān)機(jī)構(gòu)。Please notice: The delivery should be placed on location without any damage to switchgears and installation materials when intermediate storage.開箱程序如下:The sequence of opening box is following:首先拆開包裝箱的頂板,再拆開四周的側(cè)板,最后卸掉開關(guān)柜與底盤聯(lián)接的螺栓。利用柜頂?shù)乃闹坏醵?,將開關(guān)柜垂直吊起使其與底盤脫離。注意在移動(dòng)過程中,不得有較重的撞擊與振動(dòng)。 儲(chǔ)藏室應(yīng)干燥,通風(fēng)良好。 室內(nèi)溫度不低于25176。C216。No other dangerous environment infections.216。Storage switchgears erectly.216。Switchgears can not be piled.216。Do not be knockingout or damage packaging.216。必須保持空氣流通以防腐蝕。 有規(guī)律地按時(shí)進(jìn)行凝露檢查,直至安裝工作開始。 運(yùn)輸單元存放在干燥,防潮防損壞的地方。 檢查包裝有無破損。 從包裝之日算起,超過保管期限時(shí),包裝的保護(hù)功能可能會(huì)喪失,若還需存放,則要采 取適當(dāng)措施。Make sure of the correct installation sequence and highest installation quality, local installation should be carried out by fully trained personnel, or inform CJEC engineers to guide and ward in locale. General request of installation locale配電室的土建工程必須完工經(jīng)過驗(yàn)收后,并配備照明和安裝用電源,通風(fēng)裝置。電纜溝應(yīng)按各地電纜工區(qū)的具體要求施工。配電室的天花板高度不應(yīng)低于3000mm,必須保證滿足IEC規(guī)定的戶內(nèi)開關(guān)柜工作條件,包括戶內(nèi)溫度條件。KYN2812開關(guān)柜可以靠墻安裝,以節(jié)省占地面積,但如果條件許可,仍建議設(shè)計(jì)配電室平面布置時(shí),按雙面維護(hù)考慮,使開關(guān)柜后蓋板到隔墻之間以及開關(guān)柜兩側(cè)到隔墻之間均留出適當(dāng)?shù)陌惭b維修通道。若開關(guān)柜是雙排面對面布置,兩排開關(guān)柜之間距離建議不小于2500mm。當(dāng)敷設(shè)基礎(chǔ)時(shí),應(yīng)遵守GB規(guī)定,尤其是直線度和平面度的允許公差,這是開關(guān)柜安裝完美的先決條件。It is relative suitable to install the switchgear at the foundation frame builting in the floor of distribution house or elevated auxiliary level ground. Build the foundation according to GB regulation, especial the permission tolerance, it is precondition for full installation of the switchgears. The switchgears foundation construction must be accord with relative item to power construction and technical regulation for checking and accepting.. 1以配電室地板作為基礎(chǔ)Basing on the floor of distribution house開關(guān)柜數(shù)量少,重量較輕時(shí),可直接安裝在配電室地板上。如果需要,在安裝調(diào)整時(shí)可在開關(guān)柜下面插入合適的墊片。建議由電氣安裝單位承擔(dān)基礎(chǔ)框架的制作和埋設(shè)。For figure 5/5 showing, the inbuilt foundation frame of switchgear build require to take the way of the second grouting, after finishing the Civil work construction, carry through the foundation frame building. It is advised to able to do that electric installation unit are charged with the foundation frame facture and building. It is agree with blueprint drew accord to manufactory requests to process the concrete project’s foundation frame.土建施工時(shí)開關(guān)柜基礎(chǔ)標(biāo)高應(yīng)考慮預(yù)留基礎(chǔ)框架槽鋼的高度,并略有余量,見圖5/6?;A(chǔ)框架縱向槽鋼的外延距離應(yīng)與開關(guān)柜本體框架的尺寸一致。用鋼墊片調(diào)整。并要求基礎(chǔ)框架的頂面應(yīng)高于配電室最終地坪標(biāo)高約3至5
點(diǎn)擊復(fù)制文檔內(nèi)容
高考資料相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1