【正文】
witchgear is already airtight coating, the pressure gas will clash out the release of pressure plat. Adjacent switchgears are isolated by its self side board, after putting the switchgears together, air buffer layer exist yet, it may prevent the switchgears from pronging and melted by electric arc. Lowvoltage vault D is separate room with highpressure area. Clapboard space isolate the VCB vault B with cable vault C, even if VCB. truck is moved(here the valve is closed selfmotion),can prevent the operator from touching the electrification parts of bus bar vault A and cable vault C. releasing the tighten bolt, the level clapboard is removed, convenient for installation of cable seal terminal. Compartments in switchgear斷路器室(見(jiàn)附圖3/1,3/3,3/5,3/6)VCB vault (figure 3/1,3/3,3/5,3/6 showing)斷路器手車裝在有導(dǎo)軌的斷路器室B內(nèi),可在運(yùn)行、試驗(yàn)/隔離兩個(gè)不同位置之間移動(dòng)。結(jié)構(gòu)細(xì)節(jié)和柜內(nèi)安裝設(shè)備,可見(jiàn)訂貨文件。If the humidity is higher on site, temperature fluctuations speed is rapidder and range is bigger, condensation phenomena will be appear for the switchgears running in this clime condition, so user should ensure that the heater running full time on spare and running condition! But running in highcurrent, the heater can stop. 2技術(shù)數(shù)據(jù) Technical data 開(kāi)關(guān)柜電氣參數(shù) Switchgear technical data額定電壓kV12額定絕緣水平1min工頻耐壓(有效值)kV42雷電沖擊耐壓(峰值)kV75額定頻率Hz50主母線額定電流A630,1250,1600,2000,2500,3150,4000分支母線額定電流A630,1250,1600,2000,2500,3150,4000*4秒熱穩(wěn)定電流(有效值)kA16,20,25,40**額定動(dòng)穩(wěn)定電流(峰值)***kA40,50,63,80,100Rated voltage kV12Rated powerfrequency withstand voltage(1min)kV42Rated lightening impulse withstand voltagekV75Rated frequencyHz50Rated main bus bar current A1600,1200,2500,3150,4000Rated branching bus bar currentA630,1250,1600,2000,2500,3150,4000*4s Shorttime withstand current(rms.)kA16,20,25,40Peak withstand current(peak.)kA40,50,63,80,100,125*需裝備通風(fēng)裝置 with forced ventilation.**40 kA為3秒 3 second for 40kA***儀用互感器的短路容量應(yīng)單獨(dú)考慮 The shortcircuit capability of transformer for measure should be considered by oneself. 耐內(nèi)部故障電弧性能 Performance bearing inside fault arcKYN2812開(kāi)關(guān)柜在設(shè)計(jì)上已考慮到開(kāi)關(guān)柜內(nèi)部故障電弧的問(wèn)題,根據(jù)GB3906和IEC298進(jìn)行了嚴(yán)格的試驗(yàn),能有效地保證設(shè)備及操作人員的安全。CMaximum 24 hour average最低溫度 15176。公司保留對(duì)提供的數(shù)據(jù)和圖解的更改權(quán)力,需更改時(shí),不另行通知。Ensure that installation,operation and maintenance are carried out by specialist electricians only.必須保證現(xiàn)場(chǎng)電氣設(shè)備的聯(lián)接條件和工作規(guī)程的適用和安全性。Pay special attention to the hazard notes in the instruction manual marked with this warning symbol.不要超出開(kāi)關(guān)設(shè)備在正常工作條件下的技術(shù)參數(shù)里規(guī)定的負(fù)載。KYN2812 metalclad enclosed switchgear is suitable for 3phase AC 50Hz/ single bus bar and single bus bar section electric power system.,with the function of “five preventions”. The removing partment of the switchgear may be assembled with vacuum circuit breaker and vacuum contactor etc. 標(biāo)準(zhǔn)和規(guī)范 Standards and specificationsKYN2812開(kāi)關(guān)柜滿足IEC298,GB3906,DL404等標(biāo)準(zhǔn)。制造廠與用戶應(yīng)就特殊工作條件取得一致意見(jiàn)。Weight 800~1200kg,for table 1showing.*Suitable for VD4 being equipped.表1 安裝要求的尺寸及柜體重量柜內(nèi)設(shè)備型式移開(kāi)式移開(kāi)式移開(kāi)式柜深 c柜寬 b距墻距離mmmmmm150065080015008001000150010001200走廊寬度*mm100011001200安裝通道(室內(nèi)通道要求)寬度長(zhǎng)度(深)門(mén)框要求寬度高度mmmmmmmm10001500800220010001500100022001200150012002200重量(近似值)地坪承重kgkg/m28001000850100012001000List 1 Dimension and weight for switchgear installationMode of devicein switchgearRemovingtypeRemovingtypeRemovingtypedepth cWidth bDistance to wallmmmmmm1500650501500800501500100050The width of Passage *mm100011001200Assemble walkwayDemand of passage indoorWidthLength(Depth)Demands of door frameWidthHeight**mmmmmmmm10001500800200010001500100022001200150012002200Mass(approximation)Weight terrace bearedkgkg/m28001000850100012001000*取決于最大柜寬Depend on the most width of the switchgear.3 開(kāi)關(guān)柜結(jié)構(gòu)概述Structure general of switchgear(圖3/1)Basic structure(Figure3/1)開(kāi)關(guān)柜由固定的柜體和真空斷路器手車組成,這是它的基本結(jié)構(gòu)。出現(xiàn)內(nèi)部故障時(shí),高壓室內(nèi)氣壓升高,由于柜門(mén)已可靠密封,高壓氣體將沖開(kāi)壓力釋放板釋放出來(lái)。VCB truck is installed in VCB vault B with track, may move in the middle of the position to service and test/disconnected. While the truck move from service position to test/disconnected position, the valve can cover unmove contact in selfmotion, open when moving reverse. The truck can be operated when the truck vault door is closed, while you can watch the position of the truck, on (VCB tripping)/off(VCB closing) push knob in the truck, close and open indicator and charging/releasing indicator by inspection window. 斷路器手車 VCB truck手車可采用手動(dòng)進(jìn)行移動(dòng)。矩形的分支母線直接用螺栓聯(lián)接到主母線上,不需任何聯(lián)接夾。底板中穿越一、二次電纜的變徑密封圈開(kāi)孔應(yīng)與所裝電纜相適應(yīng),以防小動(dòng)物進(jìn)入。在這種分 閘狀態(tài)下,反向移動(dòng)也行(機(jī)械聯(lián)鎖)。 手車在試驗(yàn)/隔離位置或移開(kāi)時(shí),接地開(kāi)關(guān)才能合閘(機(jī)械聯(lián)鎖)。特別是海上運(yùn)輸,即使是裝在集裝箱內(nèi),也應(yīng)用塑料薄膜袋將開(kāi)關(guān)柜封裝起來(lái),放入合適的干燥劑以防受潮。Lifting rope should have enough carrying capacity. The unlock width of lifting hook should not less than 30mm.216。Inform CJEC service engineers to join the work of opening box, checking and accepting.216。Please notice: The delivery should be placed on location without any damage to switchgears and installation materials when intermediate storage.開(kāi)箱程序如下:The sequence of opening box is following:首先拆開(kāi)包裝箱的頂板,再拆開(kāi)四周的側(cè)板,最后卸掉開(kāi)關(guān)柜與底盤(pán)聯(lián)接的螺栓。 室內(nèi)溫度不低于25176。Switchgears can not be piled.216。 運(yùn)輸單元存放在干燥,防潮防損壞的地方。電纜溝應(yīng)按各地電纜工區(qū)的具體要求施工。當(dāng)敷設(shè)基礎(chǔ)時(shí),應(yīng)遵守GB規(guī)定,尤其是直線度和平面度的允許公差,這是開(kāi)關(guān)柜安裝完美的先決條件。For figure 5/5 showing, the inbuilt foundation frame of switchgear build require to take the way of the second grouting, after finishing the Civil work construction, carry through the foundation frame building. It is advised to able to do that electric installation unit are charged with the foundation frame facture and building. It is agree with blueprint drew accord to manufactory requests to process the concrete project’s foundation frame.土建施工時(shí)開(kāi)關(guān)柜基礎(chǔ)標(biāo)高應(yīng)考慮預(yù)留基礎(chǔ)框架槽鋼的高度,并略有余量,見(jiàn)圖5