【正文】
t construction, to organize the formulation of the HSE plan, the implementation of the HSE management, pays special attention to the HSE management ,組織編制HSE計劃,落實HSE管理人員,抓好HSE各項管理工作。 169。 Construction manager施工經(jīng)理 Under the leadership of project manager在項目經(jīng)理領(lǐng)導(dǎo)下:169。169。169。169。169。169。169。169。Project engineer項目工程師在項目經(jīng)理的領(lǐng)導(dǎo)下:169。169。169。169。169。169。 169。169。build project quality assurance system, make its normal ,使其正常運(yùn)轉(zhuǎn)。 responsible for organize the formulation of quality planning, and to carry out the ,并落實實施。 responsible for interface management and supervision 。 above shall have the right to report to quality assurance, quality inspection, maintenance and ensure the normal operation of quality control, and seriously endanger the quality problem有權(quán)越級報告質(zhì)保、質(zhì)檢工作,維護(hù)和保證質(zhì)控工作的正常運(yùn)轉(zhuǎn),制止嚴(yán)重危及質(zhì)量的問題。 collect, sort out band data, quality evaluation 、整理交工資料,完成質(zhì)量評定工作。 for pleted project quality review and followup service 。 familiar with and master safety production dynamic, collection and the dyke construction site HSE information, timely report to the HSE ,收集和反潰施工現(xiàn)場HSE信息,及時向HSE經(jīng)理匯報。 check construction personnel at the scene at any time is properly carried out safety operation procedures and to observe the safety rules and regulations, to prevent illegal behavior隨時在現(xiàn)場檢查施工人員是否正確執(zhí)行了安全操作規(guī)程和遵守安全規(guī)章制度的情況,制止違章行為。 check and maintain the good scene safety facilities, to ensure the reliability of the site safety ,確?,F(xiàn)場安全設(shè)施的可靠性。 shall have the right to stop does not ply with the safety rules of construction personnel and mechanical 。 organization staff post production safety education and shift safety 。Chapter3 Construction deployment 第三章 施工部署一、Preparation施工前的準(zhǔn)備工作 All procedures to be done per requirements按施工要求辦理各種施工手續(xù) Positively related to construction, the total package units to deal with the construction procedures, such as construction personnel safety education, ensure the legitimacy of the construction, make the project 、總包單位辦理有關(guān)的施工手續(xù),如施工人員安全教育等,保證施工的合法性,使工程順利開工。(2) according to the requirements of construction actively equipped with all kinds of management information, technical data, construction specifications, acceptance criteria, under the organization of the project manager for the relevant construction technical clarificaiton work按施工要求積極配備各類管理資料、技術(shù)資料、施工規(guī)范、驗收標(biāo)準(zhǔn),在項目經(jīng)理的組織下進(jìn)行各有關(guān)施工技術(shù)交底工作。 Equipments amp。根據(jù)工程進(jìn)度要求,項目部做好構(gòu)件產(chǎn)品和材料的進(jìn)場計劃,由材料部門按計劃進(jìn)行備料采購,本工程根據(jù)建設(shè)單位要求選用考察合格的管樁廠產(chǎn)品,保質(zhì)保量按時提供合格產(chǎn)品。 Construction electricity preparation認(rèn)真做好施工用電準(zhǔn)備工作 The project plans to input 1 YZY 300 type pile machine, total power consumption of not less than 120 ,總用電量不少于120kw。 Site construction electricity lines and distribution box set adopts threephase five wire system, construction of electricity power box location ,施工用電的電源箱位置見平面布置圖。Axis to the axis of the piles with solid protection, then every axis of each axis arranged according to the axis of the pile pile, with J2 theodolite measuring out the pile engineering samples, requirements have to be lofting Φ 6 round steel, the error shall not be greater than 1 ,再根據(jù)軸線樁布設(shè)各條軸線的各分軸線樁,用J2經(jīng)緯儀測放出各工程樣樁,要求要Φ6圓鋼進(jìn)行放樣,其誤差不得大于1cm。 Site preparation場地準(zhǔn)備(1)Construction site must be flat topography, venue is not flatness should be 1%, construction areas around open drain, field with blind ditch, asking for a flat, the rain stopped not water施工現(xiàn)場地勢必須平坦,場地不平整度應(yīng)<1% ,施工區(qū)域四周開設(shè)排水溝,場內(nèi)設(shè)盲溝,要求達(dá)到雨停場平,不積水。 considering of the need to transport goods pile, the construction site to north and south road, the goods can transport to the whole construction turning radius shall meet the operation of the ,在施工現(xiàn)場道路要南北向貫通,使商品樁能運(yùn)輸?shù)秸麄€施工區(qū)域。Chapter 4 Construction schedule amp。 unload piling machine裝、卸樁機(jī)3Welding machine焊機(jī)NBC400臺2Pile following接樁4Theodolite經(jīng)緯儀J2臺2Setting out放樣、校正垂直度5Level水準(zhǔn)儀S3臺1Control elevation控制標(biāo)高6Tool box工具箱個1Store tools儲放樁機(jī)配件工具7Tape50m卷尺把1Measuring丈量8Distribution box配電箱只1Matched cable電纜配套9Pile follower送樁桿φ500根11 spare usage送樁備用1根(1)Piling machine arrangement樁機(jī)安排:a 300T static pressure machine will be adopted for construction, equipped with pile follower本工程安排一臺300噸靜壓樁機(jī)進(jìn)行施工,配置相應(yīng)的送樁桿。二、Manpower plan勞動力安排計劃 Seq序號Type of work工 種Qty人 數(shù)Seq序號Type of work工 種Qty人 數(shù)1PM項目經(jīng)理17HSE specialist安 全 員12Tech. director技術(shù)負(fù)責(zé)18Documenter資料員(統(tǒng)計)13Forman機(jī) 長19Electrician電工、機(jī)修14Construction engineer施 工 員110Instructor指 揮 員15Quality specialist質(zhì) 量 員111Welder電 焊 工26Measureman測 量 員112Operator機(jī) 操 工1三、Construction progress schedule施工總進(jìn)度計劃表Construction progress schedule施 工 進(jìn) 度 計 劃 表序Seq號Content項目內(nèi)容Qty數(shù)量(根) 天數(shù)Day工作內(nèi)容ContentDuration 施工天數(shù)21011Mobilization and assembly樁機(jī)進(jìn)場組裝Preparation準(zhǔn)備工作2天day2PHCAB500(100)89Piling工程樁施打 10天day3Disassembly樁機(jī)拆卸Demobilization樁機(jī)撤場 1天dayNote說明:一:This plan is according to the needs of the bidding documents and design documents, piling progress to meet the pile machine production and overall progress as a premise for pilation本計劃根據(jù)招標(biāo)文件及設(shè)計文件要求進(jìn)行編排,打樁進(jìn)度以滿足樁機(jī)日產(chǎn)及總體進(jìn)度為前提進(jìn)行編制。三:Pile no. and spec shall be in accordance with construction drawing, planed duration is 10 calendar days樁數(shù)量、規(guī)格以設(shè)計施工圖為準(zhǔn),進(jìn)度計劃僅作示意,計劃工期為10日歷天。三、Transportation, hoisting, storage of PHC pile PHC PHC管樁的運(yùn)輸及吊裝、堆放This foundation piling engineering of the main ponent is: choose jiashan county new suitable prefabricated pany production of PHC pipe piles, models for PHC 500 (100), AB, as shown in the pile construction drawing, the number for :選用嘉善縣新順預(yù)制構(gòu)件公司制作的PHC管樁,型號為PHC500(100)AB,詳見樁位施工圖,數(shù)量為89根。因PHC管樁為工廠預(yù)制,廠方在供應(yīng)運(yùn)輸方面與打樁公司的施工進(jìn)度及供應(yīng)計劃相吻合,必須密切配合,保證管樁的供應(yīng)數(shù)量及質(zhì)量。施工人員要對進(jìn)場的樁質(zhì)量進(jìn)行認(rèn)真的外觀檢查及質(zhì)量資料的檢查,不合格品應(yīng)堅決退回