freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

電氣外文文獻(xiàn)及翻譯---高層建筑供配電系統(tǒng)設(shè)計(jì)-管理系統(tǒng)-在線瀏覽

2024-07-23 20:24本頁面
  

【正文】 3) There is no specification and technical measures in the different types of mercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations. Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good munication, to determine the form of layers of the forms and nature of floor area, which is calculated on the basis of electrical load basis。 and different levels of economic development between cities is not balanced, power indices are also different。 2 4 transformer substations located, plus 6 sets transformers, take the middle of the power supply, in addition to 5 Taiwan highpressure water chillers (total )。 2 substation transformers and 10Kv, 10Kv chillers sharing a power line, with a total capacity of . The design of the substation layout, in addition to meeting regulatory requirements, it also need to consider the highpressure cabis, transformers and low voltage power supply cabi by order of arrangement, especially in low voltage distribution cabi to feed the cable smooth and easy inspection duty problems are not seriously consider the construction of the cable crossing will cause more long detour, a waste of floor space, and convenient inspections and other issues. 4 small fire load power supply In the design of large mercial projects often encounter small fire load of electrical equipment and more dispersed distribution, if fed by a substation, a substation will be fed a lot of lowvoltage lowcurrent counter circuit breaking capacity circuit breaker and conductor of the dynamic and thermal stability in a certain extent. According to GB500451995 fire protection design of tall buildings, rule should be used in Fire Equipment dedicated power supply circuit, the power distribution equipment shall be provided with clear signs. Interpretation of the provisions of the power supply circuit means from the lowvoltage main distribution room (including the distribution of electrical room) to last a distribution box, and the general distribution lines should be strictly separated. In this design, the use of methods to increase the level of distribution, that is different from the substation bus segments, respectively, a fire fed a special circuit, set in place two distribution cabis, distribution cabis and then the resulting radial allocated to the end of the dual power to vote each box, so that not only meets the specification requirements for dedicated power supply circuit, but also to avoid feeding the substation level of many small current loop. 5, the choice of circuit breaker and conductor Commercial real estate projects use the room as the uncertainty in the choice of circuit breakers and conductors must be considered in a certain margin to meet the needs caused by adjustment of the load changes. According to this characteristic, increased use in the design of the plug buspowered, not only meet the requirements of large carrying capacity, and also allows the flexibility to increase supply and distribution, are reserved in each shaft in the plugbox
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1