【正文】
5176。滑坡治理設(shè)計(jì)圖包括:(1)滑坡治理工程平面布置圖(2)斷面工程布置圖(3)抗滑樁立面圖(4)A型抗滑樁樁身結(jié)構(gòu)圖(5)B型抗滑樁樁身結(jié)構(gòu)圖(6)抗滑樁鎖口、護(hù)壁結(jié)構(gòu)圖(7)截水溝結(jié)構(gòu)圖(8)急流槽結(jié)構(gòu)圖(9)排水涵管結(jié)構(gòu)圖第2章 滑坡區(qū)自然地理及工程地質(zhì)條件 自然地理?xiàng)l件禮縣地處甘肅省東南部隴南山區(qū),長(zhǎng)江流域嘉陵江水系西漢水上游,東鄰天水,西接宕昌、岷縣,南連武都,北與武山、甘谷接壤。此次設(shè)計(jì)的成果包括滑坡治理設(shè)計(jì)報(bào)告一份。(2)根據(jù)穩(wěn)定性評(píng)價(jià),初步擬定滑坡的治理方案。 依據(jù)的現(xiàn)行國(guó)家和行業(yè)標(biāo)準(zhǔn)、規(guī)范等1.《中衛(wèi)—貴陽聯(lián)絡(luò)線工程第三標(biāo)段BE106滑坡工程地質(zhì)勘察報(bào)告》(中國(guó)石油天然氣管道工程有限公司勘察事業(yè)部 );2.《巖土工程勘察規(guī)范》(2009年版)GB 500212001;3.《滑坡防治工程設(shè)計(jì)與施工技術(shù)規(guī)范》DZ/T02192006; 4.《建筑邊坡工程技術(shù)規(guī)范》GB503302002;5.《建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范》GB500072011;6.《建筑抗震設(shè)計(jì)規(guī)范》GB500112010;7.《鐵路路基支擋結(jié)構(gòu)物設(shè)計(jì)規(guī)范》TBJ252002; 8.《巖土工程勘察制圖標(biāo)準(zhǔn)》SY/T00512003;9.《中國(guó)地震動(dòng)參數(shù)區(qū)劃圖》GB183062001;10.《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》GB500102010;結(jié)合滑坡地勘報(bào)告,本設(shè)計(jì)的設(shè)計(jì)思路如下:(1)根據(jù)滑坡勘察報(bào)告,分析滑坡的工程地質(zhì)條件和滑坡特征,在此基礎(chǔ)上研究了影響滑坡失穩(wěn)的因素,進(jìn)而分析了滑坡的成因機(jī)制。還可以采取繞避,巖土強(qiáng)度加固法,抗滑明洞,柔性防護(hù)工程等治理方法?;轮卫泶胧┲饕校嚎够瑩跬翉?qiáng),抗滑樁,錨固工程。二是改變坡體內(nèi)部力學(xué)特征,增大抗滑強(qiáng)度而使變形終止。近20年來,特別是“國(guó)際減災(zāi)十年活動(dòng)”開展以來,國(guó)際上研究和防治滑坡災(zāi)害空前活躍,各項(xiàng)研究進(jìn)一步擴(kuò)展和深入,防治工程措施也在完善已有措施的基礎(chǔ)上向輕型化、小型化方向發(fā)展,隨著機(jī)械、材料等領(lǐng)域的發(fā)展與科技進(jìn)步,對(duì)滑坡體的加固措施向復(fù)合型、輕型化、小型化和機(jī)械化施工方向發(fā)展,土錨釘、加筋土、格構(gòu)錨固等防治措施也相繼應(yīng)用于滑坡治理中,并取得了較好的效果。 受中國(guó)石油天然氣管道工程有限公司線路室委托,管道工程有限公司勘察事業(yè)部承擔(dān)了該滑坡治理工程的設(shè)計(jì)。若滑坡整體發(fā)生滑動(dòng),后果將不堪設(shè)想。管道在施工時(shí),由于降雨的影響,坡體上出現(xiàn)多條較為明顯張拉裂縫,裂縫寬210cm,局部大于10cm,前緣由于管道施工切坡,已出現(xiàn)滑塌。中衛(wèi)—貴陽聯(lián)絡(luò)線工程第三標(biāo)段BE106滑坡位于甘肅省隴南市禮縣鹽官鎮(zhèn)白家村與閆家村交界處。管道沿線地形條件復(fù)雜多變,線路整體施工難度較大。中衛(wèi)—貴陽聯(lián)絡(luò)線干線起自寧夏回族自治區(qū)中衛(wèi)市常樂鎮(zhèn)的中衛(wèi)首站,自北向南,途經(jīng)寧夏自治區(qū)、甘肅省、陜西省、四川省、重慶市、貴州省等6 ?。ㄊ小⒆灾螀^(qū)),止于貴州省貴陽市花溪區(qū)的貴陽末站。為了減小滑坡給人類帶來的損失,需要對(duì)滑坡的治理工程進(jìn)行準(zhǔn)確分析,完做出合理的,有效的設(shè)計(jì)。 關(guān)鍵詞:滑坡,穩(wěn)定性,治理設(shè)計(jì),抗滑樁,排水工程Abstract Based on the geotechnical data of the BE106 landslide, the geological condition about the landslide was studied, then the factors which tampered with the slope’s stability were construed, the reasons which caused the landslide were analyzed and the landslide’s stability was estimated. According to the unbalance thrust transmission coefficient method’s principle and supposition,the landslide’s stability coefficient was calculated. Then the landslide’s stability was appraised. Based on the analysis, the treatment measure were advanced. According to the result of the slope stability calculation, the design principle was that the project cost was reasonable, time limit for the project was much less, the technique was possible and the project was simple and easy to construct. Finally, a revised designing program has been chosen, which included antislide pile and drainage works . At last,the slope’s designation of remedying engineering was made.Keywords: landslide, stability, antislide pile, drainage works 第 28 頁 共 29 頁目錄第1章 前 言 6 6 7 7 7 8 8第2章 滑坡區(qū)自然地理及工程地質(zhì)條件 8 自然地理?xiàng)l件 8 8 9 9 9 滑坡工程地質(zhì)條件 9 9 地層巖性 10 10 地質(zhì)構(gòu)造與地震效應(yīng) 11 地質(zhì)構(gòu)造 11 新構(gòu)造運(yùn)動(dòng)與地震 11 地下水 11第3章 滑坡基本特征 12 12 12 12第4章 滑坡穩(wěn)定性分析 13 13 計(jì)算參數(shù)的選取 13 穩(wěn)定性計(jì)算及評(píng)價(jià) 13 15 剖面選取 16 滑坡數(shù)據(jù)的計(jì)算 16 滑坡推力計(jì)算原理 16 剩余下滑力計(jì)算 16第5章 滑坡治理設(shè)計(jì) 18 18 治理工程設(shè)計(jì)方案 18 抗滑樁工程設(shè)計(jì) 19 設(shè)計(jì)工況 19 抗滑樁設(shè)計(jì) 19 抗滑樁內(nèi)力計(jì)算 20 抗滑樁內(nèi)力結(jié)果 23 抗滑樁的配筋設(shè)計(jì) 23 24結(jié) 論 26致 謝 27參考文獻(xiàn) 28附 圖 29第1章 前 言滑坡是一種地質(zhì)災(zāi)害,滑坡的發(fā)生可能會(huì)導(dǎo)致河流堵塞,交通阻斷,電力、通訊措施受損,房屋被毀,和其他的經(jīng)濟(jì)損失,甚至?xí)斐扇藛T傷亡。然后對(duì)滑坡的穩(wěn)定性進(jìn)行了定性評(píng)價(jià),并采用極限平衡原理和傳遞系數(shù)法,計(jì)算出滑坡的穩(wěn)定性系數(shù)和滑坡推力,對(duì)滑坡穩(wěn)定性進(jìn)行了定量評(píng)價(jià)。┊┊┊┊┊┊┊┊┊┊┊┊┊裝┊┊┊┊┊訂┊┊┊┊┊線┊┊┊┊┊┊┊┊┊┊┊┊┊畢業(yè)設(shè)計(jì)(論文)報(bào)