freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

電力工程監(jiān)理規(guī)范工程用表附錄a工程用表(英漢對照)-展示頁

2024-11-16 04:08本頁面
  

【正文】 , please verify and approve. ? 1). Construction management plan has been verified and approved. ? 1). 施工組織設(shè)計 ( 項目管理實施規(guī)劃 )已審批; ? 2). All construction management system and corresponding construction scheme has been established and approved. ? 2). 各項施工管理制度和相應(yīng)的 施工方案 已制定并審查合格 ; ? 3). Construction drawing has been jointinspected. ? 3). 施工圖已會檢 ; ? 4). Technical disclosure has been done. ? 4). 技術(shù)交底已進行 ; ? 5). Quality acceptance and item segregation form have been submitted for verification ? 5). 質(zhì)量驗收及評定項目劃分表已報審 ; ? 6) Project control work survey/routing resurvey documents have been submitted for verification. ? 6) 工程控制網(wǎng)測量 /線路復(fù)測資料已審核 ; ? 7) Quality manage system、 safety enviriment manage system are found satisfactory to meet the requirement. ? 7) 質(zhì)量管理體系、安 全環(huán)境管理體系滿足要求 ; ? 8) Special profession /special work personnel can meet the site requirement ? 8) 特殊工種 /特種作業(yè)人員滿足工程需要 ; ? 9) Construction manpower and machinery has been mobilized to site. ? 9) 本工程的施工人力和機械已進場; ? 10) Materials and resources can satify continous construction. ? 10) 物資、材料準(zhǔn)備能滿足連續(xù)施工的需要; ? 11) Measuring instrument、 gauges have been verified by legal units. ? 11) 計量器具、儀表經(jīng)法定單位檢驗合格; ? 12) subcontractors’ qualification documents have been submitted for verification. ? 12) 分包單位資格審查文件已報審; ? 13) Experiment (test) units’ qualification documents have been submitted for verification. 試驗(檢測)單位資質(zhì)審查文件已報審; ? 上道工序已完工并驗收合格。 whether the relevant verification applings have been finished。 報審中的“ □”作為附件附在報審表后,項目監(jiān)理機構(gòu)審查確認(rèn)后在框內(nèi)打“ √”。 表 工程復(fù)工申請表 Table Resumption of work applying form 工程名稱: 編號: Project name: No.: 致 : 項目監(jiān)理 機構(gòu) To: supervision anization 第 號工程暫停令指出的 工程停工因素現(xiàn)已全部消除,具備復(fù)工條件。 All suspension elements mentioned in project suspension order with number of have been eliminated for Project. Please kindly arrange for verification and give the permit for work resumption. 附: 整改自查報告 Encl.: rectification and selfexamination report 承包單位(章): Contractor(stamp): 項目經(jīng)理: Project manager: 日 期: Date: 項目監(jiān)理 機構(gòu) 審查意見: Supervision anization’s verification: 項目監(jiān)理 機構(gòu) (章): Supervision anization(stamp) 總監(jiān)理工程師: Chief supervision engineer: 日 期: Date: 建設(shè)單位審批意見: Employer’s verification: 建設(shè)單位(章): Employer(stamp): 項目 代表 : Project representative: 日 期: Date: 填 報 說明 : 本表一式 份,由承包單位填報,建設(shè)單位、項目監(jiān)理機構(gòu)、承包單位各一份。 附 件 : 施工組織設(shè)計 ( 項目管理實施規(guī)劃 ) We have finished the construction management plan pilation of
點擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1