freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

鐵路箱梁架橋機關于建筑的外文文獻中英文對照畢業(yè)論文-文庫吧資料

2025-06-28 19:49本頁面
  

【正文】 plan incorporated with the advantages of both single span type bridge girdererecting machine and bridge girder erecting machine with lower guiding beam. It is the latest product of Italy’s Nicola Company, and fully applied in the Taiwan high speed railway project lot C260 and C270. And one set of this machine was introduced into Chinese mainland and will be used for the erecting of class 900t railway box girders. The most distinct feature of the bridge girdererecting machine with nose beam and lower guiding beam is the single straddle simply supported girder of the main unit and the lower guiding beam supporting straddle cross one span, and that the whole machine is under a definite and reasonable force with light self weight, and the temporary construction load is lower. The main unit is shifted from one span to another at a simply supported status with a excellent operating stability, and the lower guiding beam is set on higher positions, which realizes the erecting of the last span of bridge. Instead of that the old operating mode of the bridge girder erecting machine with lower guiding beam tows the lower guiding beam to shift spans, the current spanshifting mode of the bridge girdererecting machine with nose beam and lower guiding beam is worthy of being mentioned especially. It has the features of simple and definite operation, that is, the main unit can automatically be in place on the lower guiding beam and then the lower guiding beam can be hoisted and shifted from one span to another flexibly by using the upper nose girder, the winch trolley and the auxiliary winch trolley. Because the auxiliary leg of the main unit for the bridge girdererecting machine with nose beam and lower guiding beam is fixed in a stationary position with the main girder (determined by the position in the erecting of 35 m girders), and the auxiliary leg will locate out of the legs of the lower guiding beam and the self weight of the lower guiding beam is incapable of balancing the overturning moment generated by the auxiliary leg when the spanshifting operation of the main unit for the erecting of 30m and 25m girders is performed. Therefore the lower guiding beam must be anchored reliably on bridge piers, which is the disadvantage of this machine. Class 900 t railway boxgirder bridge girdererecting machine is used to erect bridges, and girder transporting truck is used to transport bridges. Bridge erecting and transporting are performed respectively, and operated at the same time, thus a higher operating efficiency is produced. The front leg is equipped with securing segment, folding segment, making the bridge girdererecting machine fully adapt to slopes and spanshifting operations, at the same time, making the operations convenient. The bridge girder
點擊復制文檔內容
規(guī)章制度相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1