freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯---建筑中的結(jié)構(gòu)設(shè)計及建筑材料-建筑結(jié)構(gòu)-文庫吧資料

2025-05-22 09:49本頁面
  

【正文】 d it became much simpler to build fireresistant floors. Both these changes served to reduce the cost of construction. It also became possible to erect buildings with greater heights and longer spans. Since the weight of modern structures is carried by the steel or concrete frame, the walls do not support the building. They have bee curtain walls, which keep out the weather and let in light. In the earlier steel or concrete frame building, the curtain walls were generally made of masonry。河南理工大學(xué)本科畢業(yè)設(shè)計(論文) 1 Structure in Design of Architecture And Structural Material We have and the architects must deal with the spatial aspect of activity, physical, and symbolic needs in such a way that overall performance integrity is assured. Hence, he or she well wants to think of evolving a building environment as a total system of interacting and space forming subsystems. Is represents a plex challenge, and to meet it the architect will need a hierarchic design process that provides at least three levels of feedback thinking: schematic, preliminary, and final. Such a hierarchy is necessary if he or she is to avoid being confused , at conceptual stages of design thinking ,by the myriad detail issues that can distract attention from more basic considerations .In fact , we can say that an architect’s ability to distinguish the more basic form the more detailed issues is essential to his success as a designer . The object of the schematic feed back level is to generate and evaluate overall siteplan, activityinteraction, and buildingconfiguration options .To do so the architect must be able to focus on the interaction of the basic attributes of the site context, the spatial organization, and the symbolism as determinants of physical form. This means that ,in schematic terms ,the architect may first conceive and model a building design as an organizational abstraction of essential performancespace in he or she may explore the overall spaceform implications of the abstraction. As an actual building configuration option begins to emerge, it will be modified to include consideration for basic site conditions. At the schematic stage, it would also be helpful if the designer could visualize his or her options for achieving overall structural integrity and consider the constructive feasibility and economic of his or her scheme .But this will require that the architect and/or a consultant be able to conceptualize totalsystem structural options in terms of elemental detail .Such overall thinking can be easily fed back to improve the spaceform scheme. At the p
點擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1