freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

gmgp5供方質(zhì)量過程和測(cè)量程序(參考版)

2025-03-03 11:04本頁面
  

【正文】 Date Changes to FMEA will be Complete field to current system date. Root Cause drop list field to the value Other.Second offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the supplier (Quantity nonconforming and estimated quantity nonconforming = 1) The supplier will also be placed on Controlled Shipping Level 1.PPM?Sourcing MetricsSupplier evaluation system that ranks each supplier manufacturing location in terms of overall quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical modityperformance. (Example – Enhanced Metric Bid List)Changes to GP5Definitions added to GP5Page 6Supplier TrainingChanges to GP5Packaging PRRs (section )Packaging PRR s are now defined as packaging issues that cause part/specification nonconformity, or effect salability of the part. Examples: ? Damaged part or material that was inadequately secured in the container? Container was inadequately secured in the carrier vehicle and caused part/material damage? Container design and/or fabrication was inadequate and caused part/material damage? Container that has been damaged by improper handling and caused part/material damage? Mixed pallets built incorrectly and caused part/material damage? Parts not packaged to specification for servicePage 7Supplier TrainingChanges to GP5Line Accumulation PRRs (section ) ?The Line accumulation PRR should be entered in the system only after the full impact and the monthly quantity is available to the issuer. ?When it is appropriate for the plant, the PRR may be issued
點(diǎn)擊復(fù)制文檔內(nèi)容
外語相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1