【正文】
aged to specification for servicePage 7Supplier TrainingChanges to GP5Line Accumulation PRRs (section ) ?The Line accumulation PRR should be entered in the system only after the full impact and the monthly quantity is available to the issuer. ?When it is appropriate for the plant, the PRR may be issued with the first occurrence of the discrepant part. Regular adjustments of the volume will then be made during the month. ?For awareness purposes, the issuer should indicate the possibility of adjustments when issuing the PRR.Page 8Supplier TrainingChanges to GP5Problem Location and Direct Run Indicator (section )? Issuer must indicate on the PRR where the problem was found. (Phase drop down box)? Issuer must indicate on the PRR if the issue affects Direct Run Rate. (Direct Run Rate check box)Page 9Supplier TrainingChanges to GP5Quantity Checked (section ) The “1% or 30 pieces” requirement replaced by the following wording:“The quantity checked MUST be of a statistically significant size to represent the percentage defective within the batch.”Page 10Supplier TrainingChanges to GP5Quantities for Label Issues (section ) For parts shipped in bulk such as fasteners, labels, etc. (that are received in large quantities at manufacturing locations) mislabel problems will be counted using the following escalation process.Page 1Supplier TrainingGP5December, 2023 EditionPage 2Supplier TrainingPurpose: Train Supplier personnel on changes to GP5/GQTSProcess: Explanation of GP5 enhancements and screen shots of GQTS enhancementsProduct: Understanding of process and system enhancementsPage 3Supplier Training?Overview