freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

20xx年海綿城市實(shí)施方案-資料下載頁

2024-11-05 05:36本頁面
  

【正文】 of groundwater, surface water, river regulation, dangerous old pipeline network reconstruction 43 renovation project, such as, after the pletion of the prehensive sewage concentrated rate, reclaimed water utilization rate reached 98% and 25% respectively, the water supply pipeline leak rate lower than 10%, the rainwater runoff discharge pollutant load reduction rate of not less than 60%, urban construction experience for the fullscale next step, 62 square kilometers of jade FuHe west wetland area will be used as promotion, further implement the requirements of the construction of the city, sponge further speed up the sponge promotion and construction of 四大系統(tǒng)生態(tài)建設(shè)Four system ecological construction to adjust measures to local conditions 建設(shè)海綿城市,需要科學(xué)規(guī)劃和統(tǒng)籌實(shí)施城市水系統(tǒng)、園林綠地系統(tǒng)、道路交通系統(tǒng)、建筑小區(qū)系統(tǒng)建設(shè),方能有效緩解城市洪澇災(zāi)害、泉水利用不足、雨污水混流三大問題,實(shí)現(xiàn)雨水資源化、泉水資源化、污水資源化,提高城市防洪排澇減災(zāi)能力,改善城市生態(tài)環(huán)境,建設(shè)生態(tài)美麗泉城。Construction sponge, need scientific planning and overall implementation of urban water system, the botanical garden green space system, the system of road traffic system, building area, can effectively relieve urban floods, water use, rain sewage mixed flow three big problems, realize the rainwater utilization, water reuse, wastewater reuse, improve the urban flood control and drainage disaster reduction ability, improve the urban ecological environment, the construction of ecological beauty in ,濟(jì)南市加大河道整治力度,實(shí)施興濟(jì)河、歷陽河、玉繡河、西圩子壕、玉符河、臘山河及歷陽湖綜合治理工程,建設(shè)蓄水壩、谷坊、涵閘、生態(tài)緩坡、濕地公園等,增加山谷、小溪、河道的“滲、滯、蓄、凈”能力;實(shí)施河道清淤工程,增加河道排放能力;加強(qiáng)污水處理設(shè)施建設(shè),按照分系統(tǒng)規(guī)劃建設(shè)與上游優(yōu)先、集中與分散處理并重的原則,建設(shè)英雄山邊溝、赤霞廣場等污水分散處理設(shè)施和大金污水處理廠,同步配套建設(shè)再生水回用管網(wǎng),擴(kuò)大再生水使用范圍,改善河道水質(zhì),提升河道水體景觀。實(shí)施地表水轉(zhuǎn)換地下水工程,加快歷陽湖、興濟(jì)河泉水調(diào)水工程建設(shè),實(shí)現(xiàn)泉水再觀再用;推進(jìn)臥虎山、錦繡川、興隆、漿水泉、鳳凰湖“五庫聯(lián)通”工程建設(shè),建立城市河道補(bǔ)水長效機(jī)制。實(shí)施小流域水土保持綜合治理及市區(qū)南部滲漏帶修復(fù)保護(hù)工程,改造臥虎山水庫輸水線路,提升蓄水能力。加快改造既有危舊供水管網(wǎng),降低供水漏失率,提高供水保障能力。In the aspect of city water system construction, jinan intensify river regulation, implementation of xingji river, through the elements, jade, jade embroidered river, west WeiZi trenches FuHe, la was and through Yang lake prehensive treatment engineering, construction, check dam and reservoir dam watergate, gentle slope ecology and wetland park, increase, river valleys, stream “permeability, hysteresis, storage, net” ability。Implementation of river channel dredging project, increase the river discharge capacity。To strengthen the construction of sewage treatment facilities, according to the system planning and construction with the upstream priority, the principle of centralized and decentralized processing, construction YingXiongShan ditches, disperse red chardonnay square such as sewage treatment facilities and daikin sewage treatment plant, synchronous reclaimed water recycling network supporting construction, expanding the scope of the reclaimed water use, improve river water quality, improve river water surface transformation engineering of ground water, speed up through the lake, xingji river water diversion project construction, and achieve springs to view with。Promote WoHuShan, jinxiuchuan, xinglong, water fountain, phoenix lake “five library uni” engineering construction, establish longterm effective mechanism of urban river filling implementation of small watershed prehensive harness of soil and water conservation and urban leakage repair protection engineering, southern transformation WoHuShan reservoir water, improve water storage speed up the transformation both damaged water supply pipe network, reduce the water leak rate, improve the security of water supply ,濟(jì)南市實(shí)施千佛山、英雄山、泉城公園等公園景區(qū)改造提升工程,結(jié)合公園綠地建設(shè)和改造,適當(dāng)建設(shè)下沉式綠地和植草溝,實(shí)施透水生態(tài)鋪裝,在充分利用原有景觀水面匯水調(diào)蓄功能的基礎(chǔ)上,適當(dāng)設(shè)置雨水調(diào)蓄設(shè)施,提升綠地匯聚雨水、蓄洪排澇、補(bǔ)充地下水等功能。實(shí)施佛慧山、臥虎山、金雞嶺、興隆景區(qū)等生態(tài)涵養(yǎng)區(qū)建設(shè),大力開展植樹綠化,豐富山體植被,涵養(yǎng)水源,并依托山體地勢合理設(shè)置雨水收集、攔蓄及利用設(shè)施,增強(qiáng)山體公園雨水滲、蓄、用功能。實(shí)施街頭綠地、游園和道路等綠地改造提升工程,增加喬灌木栽植量,豐富植物配置,完善景觀設(shè)置,建設(shè)下沉式綠地和植草溝,提升透水鋪裝比率,合理設(shè)置雨水蓄水池等設(shè)施,提高綠地滲、蓄水等功能。In terms of landscape green space system construction, jinan implementation above, YingXiongShan, springs park scenic park upgrade project, bined with the park green space construction and retrofit, appropriate construction green and plant CaoGou subsided, implementation of water ecological pavement, in make full use of the original landscape water catchment storage function, on the basis of appropriate setting rainwater storage facilities, promote green space gather rain water, flood storage and drainage, replenish groundwater, of Buddha hui, WoHuShan, Jin Jiling, xinglong mountain scenic area ecology such as its construction, and vigorously promote treeplanting afforestation, rich mountain vegetation, water conservation, and relying on the mountain terrain reasonable setting rainwater collection, held and use of facilities, strengthens the function of mountain park rainwater infiltration, storage and of street green land, garden and the road to upgrade project, increase the amount of succession planting, rich plant configuration, improve the landscape Settings, the construction of green and plant CaoGou subsided, promote the permeable pavement ratio, reasonable setting rainwater tanks and other facilities, increase the green space permeability, water storage, and other ,濟(jì)南市將城市道路作為徑流及其污染物產(chǎn)生的主要場所之一,從道路規(guī)劃、設(shè)計到施工均要落實(shí)低影響開發(fā)理念及控制目標(biāo)。對市區(qū)所有在建工程按照海綿城市要求落實(shí)規(guī)劃、設(shè)計與施工。二環(huán)南路、二環(huán)西路南延快速路以及計劃實(shí)施的舜世路二期南段等市政道路工程,率先實(shí)施人行道、附屬停車場及廣場透水鋪裝,建設(shè)下沉式綠地、生態(tài)樹池及雨水調(diào)蓄池等,樹立樣板,全面推進(jìn),最大限度發(fā)揮道路集水功能,蓄積雨水用于道路澆灑及綠化等。In urban road system, construction of jinan city road as runoff and its one of the main places of pollutants from the road planning, design to construction to implement the low impact development philosophy and control all projects under construction in accordance with the requirements for sponge city to carry out the urban planning, design and south road, west road extending expressway, and implementation plan of shun the southern section of the road phase ii, such as municipal road engineering, takes the lead in implementing the pavement, accessory parking lot and square permeable pavement, construction falling tree green space and ecological pool and rainwater storage pool, sets up the model, prehensive advancement,
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報告相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1