【正文】
art Submission Status ? Full Production Approval ? Interim Approval – Authorize shipment to Delphi without Full Production Approval – Corrective Action Plan is required ? Rejected – Corrected submission required before production quantities may be shipped Task 15: PPAP 16 20Sep99 Interim Part Class A parts from production tooling and meet specs, not all PPAP requirements have been met B parts from production tooling and require rework to meet specs C parts not from production tooling, parts meet specs D parts do not meet specs E parts do not meet specs and vehicles with class E parts require retrofit to make them saleable Task 15: PPAP 17 20Sep99 Summary ? AIAG PPAP manual defines requirements ? APQP Product and Process Validation ? Supplier submits PPAP to proper level ? PPAP package evaluated and status determined ? Supplier and Delphi manufacturing site notified of PPAP approval status Task 15: PPAP 18 20Sep99 Reference Documents ? AIAG PPAP, SPC, MSA,APQP and Control Plan manuals ? GM 1411 Interim Approval Worksheet ? AIAG QS9000 Manual ? Appendix 20: PPAP checklist ? Appendix 13: 演講完畢,謝謝觀看!