【正文】
The trial run report should cover the processes from SMT to packing and shipment. We should raise action plan for all critical problems and potentials necessarily. After trial run, sample would be sent to customer based on request. ? After trial run, sample would be sent to customer based on request. In most cases, the whole NPI can be lengthened or shortened due to many factors, and it is also naturally have direct correlation to customer demand. ? functionality ? plexity ? requirement ? predicted volume There are 4 basic factors: ? ? Rampup Phase The trial run sample was approved by customer and “gosignal” was released, it means we can move to “rampup phase” successfully. This is the final phase for NPI. We must check what is lost or need further improvement for factory production. In fact, customer would give updated forecast and MRP plan can make production schedule based on that. ? ? Transfer Phase When customer approved the Rampup plan, NPI PM has to call a meeting with factory steering to transfer the project and report to customer about the transfer. prepare a pleted NPI report to factory members to make the transfer successful. KPI (Key Performance Indicators) KPIs are measures to a NPI project: PM has to review the actual vs target. ? ? PM need review the actual vs target. Project time schedule Project budget (from CapEx and Process performance, . Yield, scrap rate, etc) Line capacity ? ? Documents for KPIs: ? CapEx and Investment plan Project Management Document ? Quotation report ?Project anization and meeting, necessary presentation ?BOM ECO ?Product log, including all product change ? Drawing Specification Product Information ? Quotation report ?Layout and facility request ?Standard time calculation ?Rampup plan ? ? Control plan, flow chart and PFMEA PQP Documents: ? Quotation report ?Capability GRR report ?Work instructions ? SMT documents Process Requirement: ? Assembly documents ? Testing document ?Traceability requirement ?Packing and shipping requirement ?Others ? THE END ?