【正文】
\u7CFB\u7EDF\u540D\u79F0\uFF1A)。 (34, 37, 75, 15)。 (lblNewLabel)。 }2.、其他—幫助功能介紹:基本的用戶使用方法介紹界面展示:圖412 其他幫助 核心代碼:(new ActionListener() { public void actionPerformed(ActionEvent e) { if(!helpFlag){ (true)。 String str=系統(tǒng)名稱:同學(xué)通信錄管理系統(tǒng)\r\\r\n 輸入合法的用戶和密碼,單確定按鈕,即可成功登錄本系統(tǒng)。否則將無法登錄。\r\\r\n 在登錄界面上單擊“注冊賬號”文字,即可打開注冊賬號操作界面,輸入注冊用戶名,密碼,確認(rèn)密碼,身份證號。填寫好注冊信息后單出確定按鈕即可注冊成功,如注冊不成功,系統(tǒng)將提示相應(yīng)的錯誤信息。\r\n。 (str)。 helpFlag=true。 }else{ (false)。 helpFlag=false。 } } })。should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. quality standard cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. pipe does not allow bending, bending the bend radius should be ≥ 4 times times the outer diameter of the tube in. ellipticity of a bent tube, pipe diameter ≤ 60mm, not 8%, diameter 760mm, not 6%. making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. service sleeve should have a good grounding. cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge ... piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. metal temperature of the insulating layer (hot) = shellwall temperature of environment temperature ≤ 40 176。 c. paint paint of equipment and pipelines should have at least a primer (red paint) and finish. paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. interlayer should be tight and without stratification. pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard structure placement process. 1 fairfaced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and23