freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

循環(huán)泵房施工組織設計-資料下載頁

2025-07-28 19:30本頁面
  

【正文】 部分轉(zhuǎn)運有困難或使用周期較短又無法及時返程利用的機械設備,將根據(jù)馬來西亞設備市場情況,臨時租賃,盡量提高設備的使用率,降低工程施工成本。Due to far distance from mainland, the required large machines and equipment is considered to be transported to site by water, for some mechanical equipment which are hard to transfer or will be necessary only for a short time otherwise are not possible to return in time for reuse, they will be leased temporarily according to Malaysia’s equipment market to improve use rate as much as possible to reduce construction cost.、施工人員準備 Preparation of constructing persons根據(jù)本工程的特點,確定本工程項目管理班子以及項目施工隊伍,人員配備時要有的放矢地進行選擇,優(yōu)先考慮從事過同類型工程施工的員工進入工程一線操作施工。Determination of project management team and construction group will be based on the characteristics of this project, personnel selection and arrangement should be on the specific requirement, the persons who have similar working experience will be priority considered to send to the site for work. 、生產(chǎn)現(xiàn)場準備 Preparation of construction siteA、清除施工現(xiàn)場范圍內(nèi)的所有障礙物,如樹木、塊石、垃圾等;Remove all the obstacles such as trees, stones and rubbish etc. 18 / 90from construction site.B、修筑現(xiàn)場臨時道路;Build up temporary road on siteC、修建生產(chǎn)性臨設及臨時堆場,安裝水電線路并試水試電;Build up temporary facilities and stacking yard, install water and electrical lines and test.D、修建臨時排水溝、截水溝、污水處理池;Build up temporary gutter, catch water and waste water treatment pitE、修建蓄水池、泥水沉淀池。Build up water storage pit, slurry depositing pit、施工臨時設施及現(xiàn)場布置Temporary facilities for construction and site layout 、辦公、生活設施Facilities for office work and life臨時辦公點設置于泵房施工場地附近,為單層輕型鋼結(jié)構(gòu)活動房,辦公區(qū)建筑面積約 **8 間;生活區(qū)主要以租用當?shù)孛穹繛橹?,離施工現(xiàn)場有一定的距離,工人上下班用大客車接送。施工現(xiàn)場設男女廁所,場內(nèi)地面硬化,雨水、生活污水經(jīng)處理后通過排水溝排入附近集水溝。Temporary office will be located near pumps room, lightweight singlelayer steel structural movable rooms, the construction area of offices is about **8 rooms。 rooms for life in life zone will be mainly leased from local resident which are somewhat far from construction site, the workers will be carried by bus for on/off construction site, women/men toilets will be set up, roads on site will be hardened, rainwater and life sewage will be drained into vicinal water collector after treatment.、施工用水Water for construction work19 / 90沉井、泵房和頂管的生活和施工用水從施工現(xiàn)場附近業(yè)主或甲方提供的接口計量處,分別用 Φ48PVC 管引接至各用水點控制閥。海上施工、生活用水采用管道輸送或船運供給。The water for construction and life at sunk well, pumps room and jacking pipes will be supplied by leading to the regulators at all water users after connecting with Φ48PVC pipes to the interface and measuring point nearby construction site provided by the owner or Party A.、施工用電Power for construction work采用電纜將電源從業(yè)主或甲方提供的接口處接至各用電點。取水泵房、 區(qū)用電負荷約為 550KVA,考慮到施工用電的不飽和與不均衡性,總用電量按照 500KVA 接駁。水上施工用電以自發(fā)電為主,臨時靠港停泊期間,采取陸上接電供給。Cables will be used to connect power supply at the interface that the owner or Party A provided to all power using points. power load at intake pumps room, jacking pipes zone is about 550KVA, considering unsaturation and unevenness, the total power requirement will be supplied base on 500KVA. The power on water will be supplied mainly depending on selfgenerating, during temporary porting, connection and supply from land will be used, 、施工道路Construction roads從水廠右側(cè)的臨時進場道路的出入口進入,通過引接部分臨時道路到達取水泵房、頂管施工場地,路寬 ,塊石、道渣路基,泥結(jié)碎石路面。Enter from entrance of temporary siteaccessing road, then arrive intake pumps room, jacking pipe construction site by connecting partial temporary roads, the road with is , stones and clinker road base, claybound macadam road face. 20 / 90、棄土場 waste earth yard基坑開挖、沉井下沉、頂管時的棄土通過管道排放于附近的泥漿池進行沉淀,干化后短運出施工場地,用車輛運至棄土區(qū)堆放。泥漿池設于廠區(qū)的臨海側(cè),距現(xiàn)場約 300 米,用草袋作圍堰,堰體隨棄土增加而加高,泥水經(jīng)沉淀后排入海中。During foundation pit excavation, sunk well sinking, pipe jacking, the wasted earth will be moved to the vicinal slurry pit for depositing, after drying, it will be transport in short distance out of construction site and stacked in waste earth zone by transporting by vehicle. Slurry pit is located on the sea side which is 300m from site, grass bags will be used for cofferdam, weir body will bee higher as waste earth increases, slurry after depositing will be remove into sea. 施工方法及工藝流程Method and process of construction work、施工方法概述 General of construction method 循環(huán)水泵房主要工作內(nèi)容為:基坑開挖、填砂墊層、沉井制作、沉井下沉、沉井封底、上部結(jié)構(gòu)施工。The main work items of circulating water pumps room: foundation pit excavation, sand filling and lining, sunk well building, sunk well sinking, sunk well bottom sealing, upper structure construction. 取水泵房下部構(gòu)筑物擬采用沉井的方法進行施工,為縮短沉井下沉周期,減輕地下水對沉井施工的影響,施工隊伍進場后,首先在設計的泵房位置進行放樣和布置降水深井,降低地下水位,然后進行基坑開挖和砂墊層施工,澆筑素混凝土墊層、砌筑磚胎膜,同期進行鋼筋加工和模板加工。沉井總高度為,分成三次制作,每次制作高度分別為:、6m、7m,三次澆筑結(jié)束并在第一、二次沉井混凝土強度達到設計強度的 100%、第三節(jié)混凝土強度達到21 / 90設計強度的 70%時開始下沉。視現(xiàn)場降水效果,沉井下沉優(yōu)先采用排水法(干式)下沉的工法進行,或采用排水法與不排水法相結(jié)合的方法進行下沉,以減少下沉過程中因地質(zhì)原因所帶來的沙層液化和塌方,加快沉井下沉速度。沉井下沉到位后,如截水、截砂效果良好,采用干封底并澆筑鋼筋混凝土底板。如不具備干封底的條件,采用水下混凝土封底,待封底混凝土強度滿足排水要求后,抽干井內(nèi)積水并澆筑鋼筋混凝土底板,保養(yǎng) 20 小時后開始后續(xù)的頂管設備安裝。Lower structure of intake water pump is planed to be constructed in the way of sunk well, in order to shorten the time of sunk well sinking and reduce effect to sunk well construction, after construction workers enter site, they firstly set out nearby designed location for pumps room and arrange water level lowering well to lower underwater level, then excavate foundation pit and sand lining layer construction, cast plain concrete lining layer and make brick diebleck, meantime fabrication of steel bars and framework will be carried out, the total height of sunk well is , it will be made by three stages respectively at heights of 、6m、7m, when the three pourings are finished and the concrete firstly and secondly poured reaches 100% designed strength, and the third section concrete reaches 70% designed strength, sinking begins, according to effect of water level lowering, water discharging method (dry)will be priority for sunk well sinkin
點擊復制文檔內(nèi)容
畢業(yè)設計相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1