(b) Subclause: Additional terms and conditions: Management meeting The Engineer or the Contractor39。s Representative may require the other to attend a management meeting in order to review the arrangements for future work. The Engineer shall record the business of management meetings and supply copies of the record to those attending the meeting 6 except: example text between lines may be copied and to the Employer. In the record, responsibilities for any actions to be taken shall be in accordance with the Contract. 4. The Contractor Contractor39。s General Obligations Temporary works or those are designed by the employer are not all borne by the contractor responsibility. Performance Security Delete the fourth sentence of clause (),and replace with: If the performance security uses the form of bank guarantee , then, (a) Performance bond should be issued by construction bank within the territory of the country, or (b)Employer could accept the performance security issued directly by the foreign banks. If the performance security is not in the form of a bank guarantee, the performance security should be issued by the financial institution which is registered or obtained license in the host country. FIDIC 施工合同條款 專用條件 陳志華 國工 2 202122209 9 Contractor39。s Representative Add conditions: (a)The contractor39。s representative and all such persons should be able to use mandarin fluently. (b)If the contractor39。s representative and all such persons cannot use mandarin fluently, The contractor shall appoint one qualified interpreters is present in all the working time. Subcontractors Add conditions: (a)If the subcontract value less % than accepted contract amount, without prior consent. (b)As to some materials such as Prefabricated Member or machined part ,the supplier shall obtain the engineer39。s prior consent. (c)As long as possible, the contractor should provide a fair and reasonable opportunity for any qualified supplier form the host country. Unforeseeable Physical Conditions Delete the paragraph (b) of the clause ,and replace with : Payment of any relate costs , Its 80% will be added to the Contract Price.(The rest of cost should be borne by contractor) Contractor39。s Equipment The Contractor shall be responsible for all Contractor39。s Equipment. When brought on to the Site, Contractor39。s Equipment shall be deemed to be exclusively intended for the execution of the Works. The Contractor shall not remove from the Site any major items of Contractor39。s Equipment without the consent of the Engineer. However, consent shall not be required for vehicles transporting Goods or Contractor39。s Personnel off Site. The contractor’s equipment owned by contractor (directly or indirectly) ,should be considered as the employer39。s property since access to the site. Ownership of such property shall not: FIDIC 施工合同條款 專用條件 陳志華 國工 2 202122209 10 (a)Affect the employer39。s responsibility or obligation。 (b)Damage the rights of contractors’ using such equipment for the purpose of the project, or (c)Affect the contractor39。s responsibility for operation and maintenance of the equipment. Since the equipment are withdraw or the TakingOver Certificate is issued , all should be thought that the ownership of each piece of equipment owned by the contractor over again. Electricity, Water and Gas The Contractor shall be entitled to use for the purposes of the Works such supplies of electricity, water, gas and other services as may be available on the Site and of which details and prices are follows: Electricity bill: 110 KV ¥ /KWh 35110KV ¥ /KWh 110220KV ¥ /KWh Above 220KV ¥ /KWh Water bills: ¥ /T Coal gas bills: ¥ /m3 Employer39。s Equipment and FreeIssue Material The project implement portions of the material purchased under Employer’s supervision: Detail materials are at Annex. The materials’ procurement : Employer Supervisor purchase materials suppliers and purchase price, by the Employer and the Contractor in FIDIC 施工合同條款 專用條件 陳志華 國工 2 202122209 11 accordance with the design requirements, coanized public inquiry to determine. Contractor must follow the results of the inquiry confirmed by both parties signed a procurement contract with the contractor and assume the same since the purchase of materials procurement, storage, construction, warranty and other responsibilities. If the contractor does not make purchases according to the above requirements, then the bear 10% of the total contract value of the liquidated damages. Additional terms and conditions: ( 1) To a contract to provide construction site office and living facilities housing and time requirements: Contractor does not provide office and living houses, but in surveying instruments used for the Employer, to facilitate supervisors. ( 2) The Contractor shall do other work and requirements: 1) To protect underground pipelines, require the Contractor to the excavation before the exploration of detection, recognition did not encounter any underground pipeline before allowing the excavation, or for any loss resulting from the contractor responsible. Digging test pits costs have been taken into account in the offer, without any additional charges. Has clearly underground pipeline, the contractor has the responsibility to protect its security, such as damage due to construction, the contractor is responsible to bear the relevant responsibilities and financial pensation. The Contractor shall dig pits to identify the specific location of the pipeline and to take protective measures before construction, or for any loss resulting from the contractor responsible . 2) Contractor Employer provided only within the scope of the construction site layout, arrangement and anization o