freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

斜板澄清池作業(yè)指導(dǎo)書(中英最終上報(bào))(編輯修改稿)

2025-08-17 19:42 本頁(yè)面
 

【文章內(nèi)容簡(jiǎn)介】 meet the requirement of current article.(4)相鄰兩層壁板的縱向接頭應(yīng)相互錯(cuò)開且不得小于500mm(4) Longitudinal joint between adjacent two layer shell should be separated distance should not be less than 500mm.(5)箱壁縱向接頭采用全熔透的對(duì)接形式,箱壁橫向接頭采用全熔透的對(duì)接形式(5)Longitudinal joints of tank wall should adopt full penetration’s connection form. Transverse joints at tank wall should adopt full penetration’s connection form.(6)壁板剪裁在長(zhǎng)度方向上不得小于1500mm,在寬度方向上不得小于500mm。(6)Clipping of wall board on the length direction is not less than1500mm, and that on width direction is not less than 500mm(7)焊縫高度K等于被焊件的最小厚度。(7)The“K”of weld bead height shall be equal to be minimum thickness of the welding unit. Full water test(1)試驗(yàn)前應(yīng)將焊接接頭的外表面清除干凈,并使之干燥。試驗(yàn)中焊接接頭應(yīng)無(wú)滲漏。如有滲漏修補(bǔ)后應(yīng)重新試驗(yàn)。試驗(yàn)完畢應(yīng)立即將水排凈,并使之干燥。 Welding joint surface should be cleaned and dried before test is conducted. The welding joint should have no leakage during the test. If leakage occurs, test should be conducted again after the repair is pleted. Water should be discharged pletely and the joint should be dried after the test is over.(2)箱底的嚴(yán)密性,應(yīng)以充水試驗(yàn)過(guò)程中池底無(wú)滲漏為合格(2)The bottom of tank’s rigidity is qualified according that the bottom doesn’t leak during water filling test(3)池壁的強(qiáng)度及嚴(yán)密性試驗(yàn),應(yīng)以充水在設(shè)計(jì)最高液位并保持24小時(shí)后,箱壁無(wú)滲透漏,無(wú)異常變形為合格(3)Intensity and rigidity of tank wall should be tested after the water is on highest level and keeps 24 hours. The tank wall is qualified which doesn’t leak and abnormal deform.(4)設(shè)備嚴(yán)密性水壓試驗(yàn),即將設(shè)備充滿水,用1~(距焊縫30~50mm處)輕輕敲打,盛水時(shí)間不少于24小時(shí),檢驗(yàn)焊縫不應(yīng)漏水(4) The equipment carry rigidity test, that is the equipment fills water and beats all welds(distance the welds 30~50mm)slightly using hammer (), the filling time is less than 24 hours, and the testing welds don’t leak Paint anticorrosion(1)斜板澄清器內(nèi)壁油漆: (1)Inner wall paint of water treatment plant 類別Category名稱Name層數(shù)Number of layer干膜厚度Dry film thickness底漆Primer環(huán)氧富鋅底漆Epoxy zinc rich primer260um中間漆Middle paint環(huán)氧樹脂云母氧化鐵漆Epoxy resin mica oxidation iron paint280um面漆Finish 環(huán)氧樹脂漆Epoxy paint3100um(2)斜板澄清器外壁油漆 Outer wall paint of water treatment plant類別Category名稱Name層數(shù)Number of layer干膜厚度Dry film thickness底漆Primer環(huán)氧富鋅底漆Epoxy zinc rich primer260um中間漆Middle paint環(huán)氧樹脂云母氧化鐵漆 Epoxy resin mica oxidation iron paint280um面漆Finish 丙烯聚氨脂面漆Propylene polyur
點(diǎn)擊復(fù)制文檔內(nèi)容
醫(yī)療健康相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1