【文章內容簡介】
ange and the head, a short section of welding: (a) welding the qualified head ,a short section and the corresponding flange, the stagger volume is controlled between 0 ~ 2mm.,無損檢測。(b).The girth welding, nondestructive testing.,安裝管嘴和吊耳,焊接 (c). Drawing and opening, install the nozzle and lug ,welding.、管箱、浮頭蓋,一并整體熱處理。(d).The shell, tube box, floating cover, together with the overall heat treatment. 浮頭蓋Floating bonnet:材質確認 劃線下料,標記移植、切割,外協模壓、回廠檢驗。Ledge: material confirmation Drawing and cutting, mark transplantation, cutting, outsourcing molding, back to the factory inspection.:在材料檢驗員指定下領取貼有合格標簽的法蘭。 Floating head flange: receive designated qualified label of the flange under the guidiance of the materials inspector .,裝配尺寸如圖。Assemble ledge and floating head flange, the assembly size shown in Figure。,再按拱蓋的實形放樣、隔板、切割、組裝、焊接,確保隔板裝配尺寸與浮動管板槽尺寸一致。After welding, the then loft base on the real shape, bulkhead,cutting, assembling, welding, ensure size of the bulkhead, assembly size and floating tube notch groove consistent.、外頭蓋及管箱一并進爐熱處理。Having a heat treatment furnace to the front shell, the outside bonnet and the tube box .管束tube bundle換熱管1.材質確認:φ( )( ) 規(guī)格( )。Material confirmation: φ( )( ) Specification().2.單管試壓,試驗壓力為設計壓力的2倍,即( )MPa。Singletube testing pressure,the pressure is 2 times the design pressure,that is () MPa.管板本鍛件應按JB4726制造與驗收,進行PT檢測,依圖數控放樣、鉆孔、隔板槽銑加工、倒坡口、拉絲孔攻絲。The forgings shall be JB4726 manufacture and acceptance ,PT detection, according to Figure NC loft, drilling, the milling, chamfer the groove, wire drawing hole tapping.折流板,Q235B,δ16,數控放樣切割,去渣,整形,打垛點固焊。Material confirmation,Q235, δ16, CNC cutting loft