【文章內(nèi)容簡介】
ill be when those berries are pleted The calculation of this is 19000 bbs total x ratio of wet berries = 13300 wet berries total 13300bbs wet total / 600 bbs wet per hour = hours after start Start time is 7AM on peak days so the end time is 5:10 AM the next day 6. The truck wait time begins when the wet bin fills up and ends when the wet bin empties at a rate faster than the trucks entering. Bottleneck overtime is 3200 bbs total capacity / bbs per minute bottleneck = minutes Starting at 7AM the bottleneck begins at about 1:14 in the afternoon (assuming the workers work through lunch) The last truck arrives at 7PM (assuming 12 hour arrival period starting at 7AM). At this point the bins are full and have been