freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

tisco二期擴(kuò)建工程項(xiàng)目總承包(epc)合同中英文(留存版)

2025-01-28 17:06上一頁面

下一頁面
  

【正文】 design review. 技術(shù)設(shè)計(jì)評(píng)論決定總平面圖 Main pipelines are arranged at the both sides of road, and the pipelines for gas, steam and oxygen are laid overhead. Trench for water pipe and cable is laid underground along with the both sides of the road. 主管線布置在道路兩側(cè),煤氣,蒸汽和氧氣管道架空,水管和電纜溝布置在道路兩側(cè)的地下 General layout features in pact arrangement, smooth process flow and convenience for transportation. 總圖布置緊湊,工藝流程順,鐵路運(yùn)輸條件較好。 In the plant there are railways and station yard of railway, and total railway length in the whole plant is about 60 km (including railway of mines). The railway transportation is the main transport means in the plant, plementary with roads, so the transportation in the plant is very convenience. 廠內(nèi)設(shè)有鐵路及鐵路站場,全廠共有鐵路約60公里(包括礦山鐵路),廠內(nèi)運(yùn)輸主要以鐵路運(yùn)輸為主,并設(shè)有廠內(nèi)道路,交通運(yùn)輸極為便利。 COKE MAKING ENGINEERING煉焦工程 One set of 45battery coke oven with the capacity of 300,000 t/a metallurgical coke and byproducts recovery system as well as matched utilities will be newly built.新建一臺(tái)年生產(chǎn)干焦炭300,000t/a的45-battery焦?fàn)t及其副產(chǎn)品回收系統(tǒng)、配套的公輔系統(tǒng)。 PROJECT CONSTRUCTION SHCEDULE項(xiàng)目實(shí)施進(jìn)度表 The EPC’s contractor shall plete their work within 30 months. The project construction schedule is arranged based on the actual situations of all the main production lines of second stage revamping and expansion project to meet the requirements of whole project starting production. 承包商應(yīng)在30個(gè)月內(nèi)完成EPC合同中規(guī)定的工作。 CONTENTS INDEX FOR TECHNICAL APPENDIX技術(shù)附件目錄 The package of TISCO second revamping and expansion project is divided into 8 sub packages corresponding with 8 technical appendixes. TISCO二期擴(kuò)建工程根據(jù)各主要生產(chǎn)線劃分為8個(gè)分包標(biāo)段,其技術(shù)附件也相應(yīng)是8個(gè)技術(shù)附件。 OXYGEN GENERATING PROJECT制氧車間 One set of 6500m3/h oxygen generator will be newly built, plus the existing 3200m3/h oxygen generator oxygen generator, the available oxygen amount can meet the requirements for oxygen, nitrogen and some part of argon of TISCO second stage revamping and expansion project , with extra 1600m3/h oxygen. 新建一臺(tái)6500m3/h的制氧機(jī),再加上原有3200m3/h還富余1600m3/h氧氣,能滿足二期擴(kuò)建項(xiàng)目的氧氣、氮?dú)夂筒糠謿鍤獾囊?。詳見附圖。鐵水從高爐出鐵場經(jīng)鐵路運(yùn)往轉(zhuǎn)爐煉鋼或鑄鐵機(jī)。 規(guī)格 1000mmset臺(tái)3073841/10 Single track switch單開道岔Rail type: 50kg/m,Gauge: 1435mm軌型:50kg/m,規(guī)格: 1435mmGroup組51/10 cross over交叉渡線Rail type: 50kg/m,Gauge: 1435mm軌型:50kg/m,規(guī)格: 1435mmGroup組620t semitrailer with carrier length 13m, 3 shafts and 12 wheels20t半拖掛車,拖掛長13米,三軸12輪HY951LSet臺(tái)5716t dumping truck16t自卸卡車Set臺(tái)291464487t camion 7t載重汽車EQ144Set臺(tái)1NY15197t dumping truck7t自卸卡車HN352Set臺(tái)8DQ352105t camion5t載重汽車CA141Set臺(tái)2EQ1401編號(hào):時(shí)間:2021年x月x日書山有路勤為徑,學(xué)海無涯苦作舟頁碼:第25頁 共25頁6. TRAINING人員培訓(xùn)The total man months for training are not more than 200 man/months. Within the 200 man/months, the expenditures of trainee’s salary, insurance and international flight ticket will be borne by the Employer while the expenditures of trainee’s boarding, lodging, transportation and training fee in China will be borne by the Contractor.每月培訓(xùn)人數(shù)不得多于200人/月。 TRANSPORTATION 運(yùn)輸 Railway 鐵路 Total transportation amount of newly constructed raw material yard is million tons yearly, among which, 50% of concentrated fine ore, lump ore will be transported by railway and the remained 50% of which will be transported through road. Coal and coke will be transported 100% by railway from outside to the raw materials yard. Newly built railroad system shall be P50. Material yard will be provided with new railway (two lines) to enable turnaround of empty wagons. 新建原料場堆的總運(yùn)輸量為每年164萬噸, 50%的精礦粉和礦石用鐵路運(yùn)輸,其余50%由公路運(yùn)輸。原料場內(nèi)設(shè)有混勻料場,礦、煤堆場,火車等地下受料倉,詳見附圖。年產(chǎn)鐵水580,000t/a。 EPC project construction schedule.EPC實(shí)施進(jìn)度計(jì)劃表 CONTRACTOR’S SERVICE CONTENTS AND SCHEDULE承包商提供的技術(shù)服務(wù)的內(nèi)容及時(shí)間 The Contractor shall provide the site geological survey report, technical design, shop drawing design, equipment purchasing, equipment supply, construction for plant building, equipment foundation as well as piping network, equipment installation, staff training, test run and trial production for main production lines, start up of the production, acceptance test and hand over. 承包商根據(jù)各分標(biāo)段的項(xiàng)目實(shí)施進(jìn)度表,分別提供場地的地質(zhì)勘探;工程的基本設(shè)計(jì)、設(shè)備采購、供貨;廠房、設(shè)備基礎(chǔ)、管網(wǎng)的施工;設(shè)備的安裝、調(diào)試;人員培訓(xùn);各主生產(chǎn)線的試車、試生產(chǎn);投產(chǎn);驗(yàn)收交付。 The Contractor will employ Vietnam Subcontractor to undertake the works of detailed geological survey and carry out the foundation treatment (Unit price and norm according to Vietnam construction standard). If the total Subcontract price plus the contractor’s management fee do not exceed the amount of 3,265,200 USD which is specified and assigned to such works under Contract, the Contractor will bear the responsibility。 STEEL MAKING amp。 Newly constructed coke oven and its utilities are located at the northeast of original coke oven, details refer to attached drawings. 新建焦?fàn)t及輔助設(shè)施布置在原有焦?fàn)t的東北面。煤炭和焦炭將100%由鐵路從廠外運(yùn)至原料場。在200人/月范圍內(nèi),培訓(xùn)人員的工資,保險(xiǎn)和飛機(jī)票由雇主負(fù)責(zé),而培訓(xùn)人員國內(nèi)的住宿,交通和培訓(xùn)費(fèi)由承包商負(fù)責(zé)。 The transportation amount for newly built 550 m3 blast furnace is 549,700 tons yearly, among which, hot metal is 543,200 tons yearly, gas dust is 6,500 tons yearly. Hot metal is transported from cas
點(diǎn)擊復(fù)制文檔內(nèi)容
合同協(xié)議相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1