freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

tisco二期擴建工程項目總承包(epc)合同 中英文(文件)

2025-01-10 17:06 上一頁面

下一頁面
 

【正文】 teel making area, boiler house and fresh water boosting pump station are arranged at the north side of coke oven. 新建公用設施:空壓站布置在高爐與轉爐煉鋼車間之間。 General layout plan is to be decided during technical design review. 技術設計評論決定總平面圖 Main pipelines are arranged at the both sides of road, and the pipelines for gas, steam and oxygen are laid overhead. Trench for water pipe and cable is laid underground along with the both sides of the road. 主管線布置在道路兩側,煤氣,蒸汽和氧氣管道架空,水管和電纜溝布置在道路兩側的地下 General layout features in pact arrangement, smooth process flow and convenience for transportation. 總圖布置緊湊,工藝流程順,鐵路運輸條件較好。煤炭和焦炭將100%由鐵路從廠外運至原料場。瓦斯灰從重力除塵器經(jīng)鐵路運往燒結。 Roads for small cars and inaccessible for loadcarrying vehicles within workshops will be constructed by the Contractor. Roads for loadcarrying vehicles connecting plant workshops shall be constructed by the Employer. Roadway will be used for transportation of converter slag from Steel Making Shop. 供小型車和廠內(nèi)禁止重車通行的道路由承包商負責修建,通往廠區(qū)供重車通行的道路由承包商負責修建。本次設計不新增消防車及車庫,由TISCO統(tǒng)一考慮。在200人/月范圍內(nèi),培訓人員的工資,保險和飛機票由雇主負責,而培訓人員國內(nèi)的住宿,交通和培訓費由承包商負責。 MAIN TECHNICAL AND ECONOMIC INDEXES AND ENGINEERING VOLUME 主要技術經(jīng)濟指標及工程量 See table 41.表41 Main Technical and Economic Indexes and Engineering Volume主要技術經(jīng)濟指標及工程量Table 41No項目名稱單位數(shù)量備注1Occupied land area占地面積m2359,000Excluding: coke making plant, sintering plant未包括焦化、燒結2Railway鐵路mSpecified in technical design.技術設計指定3Internal – plant roads廠內(nèi)道路m2Specified in technical design技術設計指定4Railway transport volume鐵路運輸量t/a1,718,100Among which: Transport in其中:運入t/a1,711,600 Transport out 運出t/a6,5005Road transport volume道路運輸量t/a1,578,848Among which: Transport in其中:運進t/a725,948 Transport out 運出t/a852,9006Road transport equipment道路運輸工具20t Semihook truck20t半掛車Set臺516t dump truck 16t自卸汽車Set臺297t camion7t載重汽車Set臺17t automatic dump truck7t自卸汽車Set臺85t camion 5t載重汽車Set臺27Railway transport equipment鐵路運輸設備Diesel lootive內(nèi)燃機Set臺560t wagon with bottom opening60t敞車Set臺308150t track scale150t軌道衡Set臺19Level crossing平交路口Place地310Bumper post for railway鐵路緩沖柱Pcs件.5111/10 single track switch1/10單開道岔Group組Specified in technical design技術設計指定121/10 cross over1/10 交叉渡線Group組113Volume of earthwork土方量m3498,35014Retaining wall護岸m1,50015Drainage ditch排水溝m4,40016Manning人員配備Man人182 5. EQUIPMENT LIST AND LIST OF CATEGORY OF CLASSA, B AND C EQUIPMENTS 設備清單和A,B,C,等級設備目錄 EQUIPMENT LIST設備清單24MCCEQUIPMENT LIST設備清單Single project: Transportation Equipment單一項目:運輸設備No.Name of equipment設備名稱Technical specifications技術說明Unit單位Qty.數(shù)量Weight (t)重量Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(人民幣)Unit weight單位重量Total weight總重1Electronic dynamic rail weighbridge準軌電子動態(tài)軌道衡GCS150, Max. capacity: 150t,Mix. Graduation: 20 or 50kg,Accuracy class: class IIIDimension of weighing platform:200013000mmGCS150 最大稱量150t,最小分度20或50kg,準確度等級III級,秤臺尺寸20001300㎜Set臺12Diesel lootive內(nèi)燃機JMY500 (800HP)規(guī)格 1000mmSet臺2588CKO (800HP)規(guī)格1435mmSet臺3590360t wagon with bottom opening60t敞車K18。 鐵路運輸:5輛內(nèi)燃機車,30臺60t敞車。 Total transportation amount for 550m3 blast furnace and steelmaking with converter is 1107,248 tons yearly, among which, 254,348 tons transportin, 852,900 tons transportout. The other materials such as coal, granulated slag, mud for mud gun, river sand, scrap, ferroalloy material, bulk material, refractory material, blast furnace slag, garbage, etc, all of them are transported by road. 550m3 高爐和煉鋼轉爐總運輸能力為年1107,248噸,其中,運進254,348噸,運出量為852,900噸,其他原料如:煤,水渣,炮泥,河沙,鐵合金,散料,耐火材料,爐渣。 The transportation amount for newly built 550 m3 blast furnace is 549,700 tons yearly, among which, hot metal is 543,200 tons yearly, gas dust is 6,500 tons yearly. Hot metal is transported from casthouse to converter for steelmaking or pig cast machine by railway. Gas dust is transported to sintering workshop from gravitation dust catcher by railway. ,其中:。 VERTICAL ARRANGEMENT AND REGIONAL WATER DRAINAGE SYSTEM 豎向布置及區(qū)域排水 According to the present terrain documents in electronic from submitted by TISCO, the volume of earthwork of current bid document is estimated about 498,350 m3 due to inplete information about current terrain. 根據(jù)TISCO提供電子版現(xiàn)狀地形資料,經(jīng)不完全統(tǒng)計,本次標書土方量估算約498353m3 The drainage system for rain water on the site will use the existing drainage system in the plant. The final plant drainage plan provided by TISCO will govern. 使用現(xiàn)有雨排,雨排系統(tǒng)最終由tisco 負責。鍋爐房和淡水增壓水泵站布置在焦爐的西北側。 Hot blast stove is located at the southwest of blast furnace, gravitation dust catcher, gas cleaning facility, blower station, dedusting system of casthouse, circulating water pump station and suction well, all of them are located at the southwest of blast furnace. Stock house and main control room are located at the northwest of the blast furnace. Dedusting of the stock house, water granulated slag piling yard, pig iron storage hou
點擊復制文檔內(nèi)容
合同協(xié)議相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1