【正文】
been developed to ensure quality in information and design. Some of the elements related to design include: ? design requirements。一種可以用于在重復(fù)制造工序和“控制環(huán)境”的制造工業(yè)中進(jìn)行在生產(chǎn)的成本,稱之為質(zhì)量成本。 (3) 通過(guò)案例研究研究如何在土木工程建設(shè)中捕獲使用質(zhì)量成本 (4) 推薦在工程建設(shè)管理中使用質(zhì)量成本概念。上述的這些發(fā)現(xiàn)足以引起人們的重視或者在建設(shè)進(jìn)程中作為一部分不可避免的事件。設(shè)計(jì)師、 顧問(wèn)公司、 承建商和分包商都知道如果他們不能向他們的客戶提供最低限度的保證所帶來(lái)的后果。盡管估算質(zhì)量體系的成本,預(yù)防和評(píng)比相關(guān)活動(dòng)的檢查費(fèi)用和其他費(fèi)用,但是在建設(shè)過(guò)程中出現(xiàn)事故所花費(fèi)的成本卻很難估算,如果發(fā)現(xiàn)并減少事故和其相關(guān)費(fèi)用的原因,那么資源就可以得到有效的利用,成本和時(shí)間也會(huì)隨之降低。 ? 繪圖和規(guī)范控制 。 NEDO 報(bào)道指出,建設(shè)中處理事故所花費(fèi)的成本占到了 40%,這是無(wú)需懷疑的 [6],因?yàn)樵诮ㄔO(shè)期間發(fā)生的大量不同的事故大部分是有人引起的。人力資源需要進(jìn)行特殊關(guān)照是非常有必要的,因?yàn)樗麄兛梢援a(chǎn)生事故亦可以避免事故的發(fā)生,質(zhì)量管理項(xiàng)目能夠成功通常是因?yàn)榻o了一種特殊的關(guān)照。 ? 控制不符合的變化 。 在評(píng)估階段,調(diào)查并確定項(xiàng)目的功能需求 .為了將這些需求準(zhǔn)確地轉(zhuǎn)化為決策信息,負(fù)責(zé)人還須考慮有關(guān)項(xiàng)目要求的所有變量。傳統(tǒng)思想認(rèn)為質(zhì)量和成本彼此背道而馳 ,但是文檔質(zhì)量管理成果揭示了一個(gè)與傳統(tǒng)相反的觀點(diǎn)。對(duì)于一個(gè)公司來(lái)說(shuō),不僅僅要生產(chǎn)出合格的產(chǎn)品,還要以盡可能低的費(fèi)用來(lái)生產(chǎn)這些產(chǎn)品,這對(duì)公司的生存來(lái)說(shuō)是必須的。一個(gè)國(guó)家經(jīng)濟(jì)發(fā)展處的調(diào)查 —— 旨在提高建設(shè)過(guò)程中質(zhì)量的方法 —— 記載著將近 501個(gè)關(guān)乎質(zhì)量問(wèn)題的事故。因?yàn)樵谶@兩個(gè)行業(yè)中存在著制造特征和生產(chǎn)環(huán)境的區(qū)別,因此在建設(shè)行業(yè)中很難確定是否可以使用類似的質(zhì)量成本概念。 ? design verification through design analysis reviews。 (3) illustrate by a case study how failure costs can be captured and used in a civil engineering contract。s survival, is increased customer expectations — an organization must provide the products/services to fulfill the requirements of the client[l]. Another is the costs incurred due to operation and product failures。 ? design: inplete information, changes in design, design mistakes, client39。 ? management responsibilities and mitment. Giving more attention to these preventive items helps improve design quality assurance, or design assurance, such that a firm gains a stronger footage and a more petitive edge. Every time a change is made in a design, it has to be reworked by the design team. Thus costs incurred in reworking have to be accounted for in quality costing. Changes initiated by the client are sometimes termed deviations instead of failure cost. The construction stage of a civil engineering project is labor and plant intensive. The cost of labor and plant can range between about 40 per cent and 70 per cent of the total construction cost. It is not surprising that39。 這篇文章試圖解決質(zhì)量成本的概念,特別是其作為一種輔助工具來(lái)識(shí)別并降低在土建工程項(xiàng)目施工過(guò)程中的損失。在“偷工減料”的領(lǐng)域里,“缺少管理”和“缺少專業(yè)知識(shí)”是其主要原因,而在設(shè)計(jì)領(lǐng)域里,“不清楚規(guī)范”和“無(wú)法使用的設(shè)計(jì)”被視為主要原因,其中就發(fā)生過(guò)最嚴(yán)重的事故案例。管理和生產(chǎn)隊(duì)伍必須減少事故的發(fā)生并使其降低到最低值以至于可以縮小容忍的程度。質(zhì)量管理業(yè)績(jī)的測(cè)量 ,可以采用多種方式。在施工階段問(wèn)題則更多,因?yàn)樗麄兏静皇煜げ⒄莆招畔⒌耐暾裕虼吮貙⒒ㄙM(fèi)大量的金錢來(lái)彌補(bǔ)這種情況。每次想在設(shè)計(jì)中發(fā)生改變,設(shè)計(jì)團(tuán)隊(duì)必須要返工,這種返工 的成本應(yīng)該歸為