freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

外文翻譯---捕獲土建工程質量事故的成本(存儲版)

2025-07-01 09:40上一頁面

下一頁面
  

【正文】 d Technology) INTRODUCTION One reason which relates quality (conformance to requirements) to a firm39。 (4) remend that quality cost information be used in managing civil engineering works. FAILURE EVENTS IN CONSTRUCTION The Building Research Establishment (BRE) found that errors in buildings had 50 per cent of their origin in the design stage and 40 per cent in the construction stage. In a National Economic Development Office (NEDO) survey, aimed at improving methods of quality control for building works, some 501 quality related events were noted. The qualityrelated events were divided into three main areas: design, poor workmanship and other. Design and poor workmanship bined to form more than 90 per cent of the total events listed in Table I. Under poor workmanship lack of care and lack of knowledge were the main causes, whilst in design unclear/missing information and design will not work were identified as the major causes of problems, including the most serious cases. NEDO showed that causes of defects in housing were mainly in design (50 percent) and construction (30 per cent). The remaining 20 per cent were attributed to materials and other causes. WHY QUALITY PERFORMANCE SHOULD BE MEASURED IN CONSTRUCTION Although the above findings reveal failures in building projects, failures among civil engineering projects may be even more serious owing to the greater variety of risk factors. The findings above can be considered as either cause for concern or as inevitable events that are part and parcel of the construction process. It is wellknown that, while the frequency of some failure items is low, they can tremendously affect project time and cost. For a firm to survive, it must strive not only to produce the final product to specification but also to produce it at the lowest cost possible. There is no doubt that most firms, whether in design or construction, are able to produce work to the specification within an acceptable tolerance with respect to time and costs. The magnitude of the tolerance has to be reduced for a firm to remain petitive. Management and production teams must reduce failures that are qualityrelated to the minimum such that there is a reduction in the tolerance gap. In order to do this, the failures must be identified and their seriousness assessed. In con
點擊復制文檔內容
畢業(yè)設計相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1