【正文】
oubolin anchorage drilling rig for anchor hole construction. The diameter of the anchor hole is about φ150mm, the designed depth of the anchor hole is 58m, 25 degree boreforming with horizontal angle.、錨孔鉆孔技術(shù)參數(shù)根據(jù)所鉆部位孔內(nèi)地層情況確定。執(zhí)行規(guī)范GB500862015 Anchor plate: The size of anchor plate shall be 300*300*25(mm). The size of round hole located at the center of anchor plate shall be determined according to the round hole of anchorage(with 3 holes). The external diameter of round hole for inserted plate shall be equal to dimension of the margin of anchorage. The size of anchor plate shall be 300*300*25(mm). The size of round hole located at the center of anchor plate shall be determined according to the round hole of anchorage(with 2 holes). The external diameter of round hole for inserted plate shall be equal to dimension of the margin of anchorage. The standard of GB500862015 shall be selected in line with the operative norm of GB/T specification of anchor has two types including 3162。 Issuing technical information to staff for study。3. Report of Geological Engineering Exploration for proposed Water Treatment Plant and onthespot investigation for the surrounding environment of said construction site.中國(guó)現(xiàn)行國(guó)家標(biāo)準(zhǔn)、施工技術(shù)規(guī)范、規(guī)程、質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)及驗(yàn)收方法、安全檢測(cè)標(biāo)準(zhǔn)及技術(shù)規(guī)程、文明施工要求等。 Minuwangoda Integrated Water Supply Scheme 編制時(shí)間:2017年09月09日Preparation Date:September 9th , 2017目 錄 Contents第一節(jié)、編制依據(jù)01 I. Preparation Basis第2節(jié) 、施工步驟03 II. Construction Arrangement 一 )、施工步驟03 1. Construction Arrangement 二)、勞動(dòng)力組織安排03 2.Manpower Plan 三)、機(jī)械設(shè)備配置04 Equipment Preparation 四)、主要儀器設(shè)備05 4. Main Instrument and Equipment第三節(jié)、錨桿主要施工方法06 III Main Construction Method of Anchor 一)、總體方案06 1. Overall Scheme 二)、施工準(zhǔn)備08 2. Construction Preparation 三)、錨桿成孔工藝09 3. Boreforming Process of Anchor第四節(jié)、施工進(jìn)度計(jì)劃26 IV Construction Progress Schedule附圖一、質(zhì)量保證機(jī)構(gòu)框架圖32 Attached Figure1 Frame Chart of Quality Assurance Organization 附圖二、安全保證機(jī)構(gòu)框架圖33 Attached Figure2 Frame Chart of Safety Assurance Organization34 / 37第1節(jié) 、編制依據(jù) I. Preparation Basis 阿塔納水廠(chǎng)工程招標(biāo)文件中關(guān)于場(chǎng)地平整的相關(guān)內(nèi)容及相關(guān)技術(shù)條款。Diesel1套1 set備用Standby發(fā)電機(jī)Generator250KW2套2 sets備用Standby泥漿泵Mud pumpBW1501套1 set雙作用空心千斤頂Double acting hollow jackRRH6065套5 sets混凝土施工設(shè)備Concrete construction equipment3套3 sets材料運(yùn)輸車(chē)Transport vehicle for material 5T2輛2 nos.其他設(shè)備Other equipment據(jù)需要配置Prepared as per needs錨桿輔助施工Aided anchor construction木工圓盤(pán)鋸Woodworking circular saw380V、1臺(tái)1 set模板制作Formwork fabrication鋼筋斷鋼機(jī)Steel bar cutting machine380V、1臺(tái)1 set鋼筋加工Steel bar process鋼筋切割機(jī)Steel bar cutter380V、1臺(tái)1 set鋼筋加工Steel bar process鋼筋彎箍機(jī)Steel bar bender380V、1臺(tái)1 set鋼筋加工Steel bar process電焊機(jī)Electric welding machine380V、1臺(tái)1 set鋼筋加工Steel bar process木工手提圓盤(pán)鋸Woodworking portable circular saw8臺(tái)8nos.模板加工Formwork process主要儀器設(shè)備4. Main Instruments and Equipment預(yù)應(yīng)力錨桿施工配備的主要儀器如表2所示Instruments List for anchor construction are shown in figure2 below表2 主要測(cè)量、試驗(yàn)、質(zhì)檢、監(jiān)測(cè)儀器設(shè)備表Main Instruments for Measurement, Test, Quality Inspection and Monitoring List序號(hào)NO.設(shè)備名稱(chēng)Instrument Name廠(chǎng)牌及規(guī)格型號(hào)Brand, Specification and Model數(shù)量Qty備注Note1全站儀Total StationSET230RK、NTS302R+1錨孔定位Anchor hole positioning2水準(zhǔn)儀Water LevelC32II、DSZ21350m鋼尺Steel Tape(50m)34磨光機(jī)Polishing Machine25試樣切割機(jī)Sample Cutting Machine16砂漿稠度儀Mortar Consistometer17電動(dòng)重型擊實(shí)儀Electric Heavy Compaction Apparatus電 動(dòng)electric type18其它儀器Other Instrument根據(jù)需要配置Prepared as per needs第三節(jié) 錨桿主要施工方法 III. Main Construction Method of Anchor (1) 、總體方案 Scheme錨桿施工與邊坡開(kāi)挖施工同步進(jìn)行,上層邊坡支護(hù)施工完成,開(kāi)挖至預(yù)應(yīng)力錨桿施工位置后,及時(shí)組織進(jìn)行腰梁及預(yù)應(yīng)力錨桿施工,完成邊坡防護(hù),減少邊坡暴露時(shí)間。 2).Construction Sequence of Anchor: The anchor construction shall be conducted from the top to the bottom(some proper adjustment can be made according to the actual situation) under the principle of sequence and denseness. Grout leaking between anchor holes shall be avoided in order to prevent the serious impact on construction effect. See Attachment 1 for detailed Plan of Anchor Arrangement(take the construction order from the top to the bottom as example). The following various construction work shall be carried out timely.(2) 、施工準(zhǔn)備2. Construction Preparation、錨桿的簡(jiǎn)述 Brief Introduction of Anchor、錨桿長(zhǎng)度:~,錨桿錨固長(zhǎng)度5~8m,。錨具(M173,3孔)≥設(shè)計(jì)值380KN,與鋼絞線(xiàn)3162。Reserve anchor working area(500mm below anchoring point) while excavating or backfilling of earthwork. Airdriven downhole hammer construction technology shall be adopted for prestressed anchor whose length is 1520m and anchorage length is about 58m.、風(fēng)動(dòng)潛孔錘施工方法 . Airdriven Downhole Hammer Construction Method 、根據(jù)設(shè)計(jì)圖紙要求,測(cè)量人員測(cè)定錨桿孔的孔位,打入標(biāo)樁,注明錨孔編號(hào)(詳見(jiàn)附圖一、二、三)。松散土層及破碎巖石中采用低轉(zhuǎn)數(shù),完整基巖中鉆孔中適當(dāng)提高轉(zhuǎn)數(shù)。對(duì)測(cè)放并驗(yàn)收合格的錨孔位置進(jìn)行編號(hào),并用油漆標(biāo)示在現(xiàn)場(chǎng)坡面上,該編號(hào)作為錨桿制作編號(hào)的依據(jù)。當(dāng)錨孔深度已滿(mǎn)足要求,則以高壓風(fēng)吹凈,直至吹出清水。Drilling diameter and depth shall not less than designed valu