【正文】
求固定在腰梁鋼筋上,錨具軸線與錨孔方向一致,再一起現(xiàn)場澆注、振搗,保證質(zhì)量。(2) Strand meshing shall be done on the work platform, the cutting length is: design length + anchor beam thickness + tension jack length + anchor thickness + tension operation reserve.(3) 、沿錨桿長度方向每隔2000mm設(shè)置一個(gè)φ48*35mm隔離支架(詳附圖四、五),相鄰兩隔離架之間安設(shè)束線環(huán)(綁扎絲)對錨桿進(jìn)行綁扎固定。同時(shí)要求復(fù)查錨孔孔位、傾角和方位,全部錨孔施工分項(xiàng)工作合格后,即可認(rèn)為錨孔鉆造檢驗(yàn)合格。當(dāng)錨孔深度已滿足要求,則以高壓風(fēng)吹凈,直至吹出清水。松散土層及破碎巖石中采用低轉(zhuǎn)數(shù),完整基巖中鉆孔中適當(dāng)提高轉(zhuǎn)數(shù)。錨具(M173,3孔)≥設(shè)計(jì)值380KN,與鋼絞線3162。Diesel1套1 set備用Standby發(fā)電機(jī)Generator250KW2套2 sets備用Standby泥漿泵Mud pumpBW1501套1 set雙作用空心千斤頂Double acting hollow jackRRH6065套5 sets混凝土施工設(shè)備Concrete construction equipment3套3 sets材料運(yùn)輸車Transport vehicle for material 5T2輛2 nos.其他設(shè)備Other equipment據(jù)需要配置Prepared as per needs錨桿輔助施工Aided anchor construction木工圓盤鋸Woodworking circular saw380V、1臺1 set模板制作Formwork fabrication鋼筋斷鋼機(jī)Steel bar cutting machine380V、1臺1 set鋼筋加工Steel bar process鋼筋切割機(jī)Steel bar cutter380V、1臺1 set鋼筋加工Steel bar process鋼筋彎箍機(jī)Steel bar bender380V、1臺1 set鋼筋加工Steel bar process電焊機(jī)Electric welding machine380V、1臺1 set鋼筋加工Steel bar process木工手提圓盤鋸Woodworking portable circular saw8臺8nos.模板加工Formwork process主要儀器設(shè)備4. Main Instruments and Equipment預(yù)應(yīng)力錨桿施工配備的主要儀器如表2所示Instruments List for anchor construction are shown in figure2 below表2 主要測量、試驗(yàn)、質(zhì)檢、監(jiān)測儀器設(shè)備表Main Instruments for Measurement, Test, Quality Inspection and Monitoring List序號NO.設(shè)備名稱Instrument Name廠牌及規(guī)格型號Brand, Specification and Model數(shù)量Qty備注Note1全站儀Total StationSET230RK、NTS302R+1錨孔定位Anchor hole positioning2水準(zhǔn)儀Water LevelC32II、DSZ21350m鋼尺Steel Tape(50m)34磨光機(jī)Polishing Machine25試樣切割機(jī)Sample Cutting Machine16砂漿稠度儀Mortar Consistometer17電動重型擊實(shí)儀Electric Heavy Compaction Apparatus電 動electric type18其它儀器Other Instrument根據(jù)需要配置Prepared as per needs第三節(jié) 錨桿主要施工方法 III. Main Construction Method of Anchor (1) 、總體方案 Scheme錨桿施工與邊坡開挖施工同步進(jìn)行,上層邊坡支護(hù)施工完成,開挖至預(yù)應(yīng)力錨桿施工位置后,及時(shí)組織進(jìn)行腰梁及預(yù)應(yīng)力錨桿施工,完成邊坡防護(hù),減少邊坡暴露時(shí)間。3. Report of Geological Engineering Exploration for proposed Water Treatment Plant and onthespot investigation for the surrounding environment of said construction site.中國現(xiàn)行國家標(biāo)準(zhǔn)、施工技術(shù)規(guī)范、規(guī)程、質(zhì)量檢驗(yàn)評定標(biāo)準(zhǔn)及驗(yàn)收方法、安全檢測標(biāo)準(zhǔn)及技術(shù)規(guī)程、文明施工要求等。 shall be selected in line with the operative norm of GB/T specification of anchor has two types including 3162。 Adopt airdriven downhole hammer for anchor hole construction to effectively avoid the erosion of the slope. Fasten the construction speed. Adopt type 868 Youbolin anchorage drilling rig for anchor hole construction. The diameter of the anchor hole is about φ150mm, the designed depth of the anchor hole is 58m, 25 degree boreforming with horizontal angle.、錨孔鉆孔技術(shù)參數(shù)根據(jù)所鉆部位孔內(nèi)地層情況確定。鉆孔過程中對每個(gè)孔的地層變化,鉆孔狀態(tài)(鉆壓、鉆速)、地下水及一些特殊情況作好現(xiàn)場施工記錄。After drilling to designed depth, drilling work cannot be stopped immediately and keep drilling 12mimutes to avoid insufficient size of hole and not up to the designed hole diameter. Any dregs and water cannot be attached on hole wall and must be cleaned out of hole. After drilling, blow the rock powder and water out from hole with highpressure air (~). Except for anchorage of integrity and hard rock , the rest anchor holes cannot be washed by highpressure water. If the confined water flew from anchor hole, anchorage and grouting could be carried out after water pressure and volume reduced, and set up drainage hole in suitable place if necessary. If it is required to deal with impounded water in anchor hole, grouting closure and secondary drilling will be adopted. ⑤、錨孔檢驗(yàn)⑤ Anchor Hole Test錨孔鉆孔結(jié)束后,須經(jīng)CMEC工程師檢驗(yàn)合格后,方可進(jìn)行下道工序。to ensure the protective layer thickness of anchor body is not less than 2cm. Manpower shall be adopted for anchor body installation. It shall be checked seriously for anchor hole serial number before use highpressure air to blow the hole after confirmed. Slowly put the anchor body into hole,use steel tape to measure the steel strand length outside the hole and calculate the inside hole anchor length(deviation controlled within 50mm) to ensure the anchorage length. 首先按照設(shè)計(jì)要求長度切割鋼絞線,用冷彎機(jī)將無粘結(jié)鋼絞線彎曲成U型并固定在承載體上,然后按設(shè)計(jì)荷載體間距組裝完成整個(gè)錨桿體。 Normally, the actual consumption of grouting is more than theoretical volume. The grouting is pleted as the exhaust vent stops vent and the excessive grout is over flow from the exhaust vent mouth. If insufficient grouting or sedimentation after grouting, supplementary grouting shall be needed till the totally full of the grouting. To clean the grouting pipes, grouting guns, sleeves and make accurate, plete, clear grouting records after pleting grouting.、錨桿腰梁的施工 Construction of Intermediate Beam of Anchor腰梁采用C30混凝土現(xiàn)場整體澆注,OVM15錨具與其同時(shí)安裝澆筑固定。 Before tension, inspection must be done to ensure the bearing face of the anchor angle bracket pedestal must be smooth and even, vertical to the axial line of anchoring rods. If not, relevant rectifying works shall be done.、張拉施工前必須對張拉機(jī)具和儀器儀表進(jìn)行標(biāo)定和調(diào)試校準(zhǔn)。第二次注漿再次向錨固區(qū)高壓注漿,~,注漿壓力為2~,. M25 grout of cement is used as anchor grouting material. Firstly grout from the hole bottom outwards to the anchorage section with the cementsand ratio of 1:, watercement ratio of , grouting pressure of . Secondly grout with high pressure to the anchorage section with neat cement grout of watercement ratio of , grouting pressure of , and the termination grouting pressure shall not less than .、當(dāng)孔口出現(xiàn)溢漿且持續(xù)時(shí)間不低于5min后(或排氣管停止排氣),方可停止注漿,注漿完畢后待砂漿凝固收縮后,空口進(jìn)行補(bǔ)漿。Control drilling speed according to geological condition. Drilling work shall be stopped in time when the obstacles or abnormal conditions occurred and take corresponding measures as soon as possible after checking. Drilling depth is 200mm greater than the designed anchor length.、錨桿采購及安裝 Anchor Purchase and Installation 預(yù)應(yīng)力錨桿體由腰梁、自由段、錨固段和安全段四部分組成。為確保錨孔