freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

巴斯夫上海中間體四氫呋喃/聚四氫呋喃項(xiàng)目土建、地下管道和建筑工程施工方案英文版(存儲(chǔ)版)

  

【正文】 gement。 Building Works Method Statement 4/66 detailed design drawing。 4) HSE Officer a) Be fully in charge of the Project HSE production and civilization construction。 Building Works Method Statement 5/66 b) Assist the Owner and Contractor to anize the materials and equipment to supply, transport to the site according to the progress requirement。 e) Fully in charge of the logistics, security guard, fireproof and protect against theft。 Building Works Method Statement 6/66 e) Assist the Owner/Contractor in inspection of the materials and equipment, and perform the submittalapproval system。 d) Assist the Owner/Contractor in executing the construction quality control, and approval periodical quality inspection reports。 handle the transfer out/in personnel, assess the personnel regularly, establish the personnel management file。 5) Material and Equipment Department Manager a) Participate in the inquiry for the equipment and material, negotiation and sign contract。 f) Organize and attend the test of the pleted or undertaking works。 b) Check the construction techniques and methods on the premises of safety and reliability。 c) Working out QA/QC schemes。 Civil Works, Underground Piping amp。 e) To be responsible for the maintenance and care of mechanical equipment。 b) To keep in contact with the designer to deal with technical issues。 Building Works Method Statement 9/66 documents. 2) Meeting System a). A meeting must have a subject and an object of discussion. b). Prior notification of time, place and discussion subject shall be made to all members who shall take part in the meeting for preparation. c). Schedule the time limit of the meeting. Arrange the approximated time for the various topics. d). Definitude the caller and the presider of the meeting and assure every topic have enough time to discuss. e). Definitude the recorder and the draftsman of the meeting minute. f). The presider shall sum up every topic and decisions when the meeting finished for easy making of the minute. g). If any topics need further discussion after meeting, the presider shall schedule the date of the next meeting. h). The meeting minute shall be sent to all the participants and the peoples who will execute some decisions made in the meeting. 3) Daily Work System a). A weekly regular meeting shall be presided by the project manager to municate things, harmonize works and dispose assignments. All the members of the project management board shall participant. b). A daily harmony meeting shall be presided by the construction manager. The header of work teams and the subcontractors shall participant. c). The record for the meetings must be made good and clean up to form a meeting minute. d). The special engineers shall execute the decisions made in the meetings and report the results to the construction manager in a period of time. e). The report forms such as Monthly Report of Construction, Monthly Report of Work Progress, Monthly Report of Work Quality, shall be reported to the project manager. Construction Organization Construction Organization Chart The construction anization chart of the work is as following: Civil Works, Underground Piping amp。它的地理位置是東經(jīng) 120o28’、北緯 30o46’。 Building Works Method Statement 3/66 SECTION1 GENERAL 第一章 概述 1. GENERAL INFORMATION 總說(shuō)明 Name of Project 項(xiàng)目名稱 BASF Intermediates THF / PolyTHF Project, Caojing, China, Civil Works, Underground Piping amp。這個(gè)裝置 包含工藝裝置、公用工程、裝置外的罐區(qū)及道路裝卸設(shè)施 和控制室、行政管理 樓 等其他服務(wù)建筑。 Building Works Method Statement 5/66 3. CONSTRUCTION ARRANGEMENT 施工安排 Preparation 準(zhǔn)備 Upon signing the contract with the Contractor, mobilization shall be proceeded with for the following items prior to the issuance the notice of proceed. a) Liaison with the relevant authority for granting temporary usage of land where the site facilities shall be installed as soon as possible, such as offices, shops, ware houses and so on. b) Rent and equip the living acmodations for the Construction Contractor staff and workforce with necessary furnishings. c) Organize and arrange the mobilization of the pioneer staff team, construction plant and facilities. d) Install temporary water and electrical power supply. e) Before construction temporary road works, obstructions on site shall be demolished and cleared away. f) Take over from the Engineer the survey datum points and establish and transfer survey control work with duly protection measures. g) Built up the site laboratory and provide it with the facilities as per the specified requirement. h) Submit the working schedule of the first construction portion for the Engineer’s review and 分的工作進(jìn)度表,以供審核批準(zhǔn)。 b) Cost analysis and control。 e) To receive and dispatch drawings and relevant technical documents。 b) To provide safety job discipline to workers。 b) To assist other functional departments to recruit new staff。 b) Prepare the monthly certification, submit to the Owner and Contractor for approval。 d) Set up a file room to register, store and forward all the technical documents and information。 b) Establish and implement HSE management system on site。 c) Organize the related pany to check the materials and equipment on site, make records of inspection and acceptance。 f) Set up the security system on site, fireproof, sanitation and road management on site, consolidate living facility, staff canteen, inspect regularly。 f) Be responsible for the project measurement management. SECTION2 CIVIL WORKS 1. Scope of Works The scope of work consists of the construction of civil
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1