freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

巴斯夫上海中間體四氫呋喃/聚四氫呋喃項目土建、地下管道和建筑工程施工方案英文版-wenkub

2022-12-05 02:02:10 本頁面
 

【正文】 ent management shall provide the documents in case of need and register the state of the transferring. f). All the members of the project shall cooperate the documents management works and provide all original relevant documents. g). The coding system of the pany shall be used when registering the Civil Works, Underground Piping amp。 Building Works Method Statement 5/66 3. CONSTRUCTION ARRANGEMENT 施工安排 Preparation 準(zhǔn)備 Upon signing the contract with the Contractor, mobilization shall be proceeded with for the following items prior to the issuance the notice of proceed. a) Liaison with the relevant authority for granting temporary usage of land where the site facilities shall be installed as soon as possible, such as offices, shops, ware houses and so on. b) Rent and equip the living acmodations for the Construction Contractor staff and workforce with necessary furnishings. c) Organize and arrange the mobilization of the pioneer staff team, construction plant and facilities. d) Install temporary water and electrical power supply. e) Before construction temporary road works, obstructions on site shall be demolished and cleared away. f) Take over from the Engineer the survey datum points and establish and transfer survey control work with duly protection measures. g) Built up the site laboratory and provide it with the facilities as per the specified requirement. h) Submit the working schedule of the first construction portion for the Engineer’s review and 分的工作進(jìn)度表,以供審核批準(zhǔn)。 離上海石化公司大約 15 公里。這個裝置 包含工藝裝置、公用工程、裝置外的罐區(qū)及道路裝卸設(shè)施 和控制室、行政管理 樓 等其他服務(wù)建筑。 Building Works Method Statement 2/66 CONTENTS 目錄 SECTION1: GENERAL 第一章:概述 1. General Information 總說明 2. Scope of works 3. Construction Arrangement 4. Control the Construction Schedule 5. Construction Organization SECTION2: CIVIL WORKS 1. Scope of Works 2. Earthwork 3. Concrete Work 4. Grouting Work 5. Road and Paving Works SECTION3: UNDERGROUND PIPING 1. General 2. Installation of Carbon Steel Pipe 3. Installation of Galvanized Steel Pipe 4. Installation of Concrete Pipe 5. Installation of PVC Pipe SECTION4: BUILDING WORKS 1. General 2. Installation of HVAC System 3. Steel Work SECTION5: ATTACHMENT DRAWINGS Civil Works, Underground Piping amp。 Building Works Method Statement 3/66 SECTION1 GENERAL 第一章 概述 1. GENERAL INFORMATION 總說明 Name of Project 項目名稱 BASF Intermediates THF / PolyTHF Project, Caojing, China, Civil Works, Underground Piping amp。該地方已建成了擁有 600 噸裝卸能力的碼頭。它的地理位置是東經(jīng) 120o28’、北緯 30o46’。 Site Layout 現(xiàn)場布置 Living Facilities 生活設(shè)施 Housing and camp shall be set up close to the work site with living necessities. It shall be about 1700m2 for caring and catering of work force and staff. Site Facilities 現(xiàn)場設(shè)施 Proposed working area around 4500m2 in the site will be remained to construct necessary working facilities according to the drawing of temporary construction facilities lay out offered by the Contractor. Site facilities shall include the site office, stores, site laboratory, etc. Civil Works, Underground Piping amp。 Building Works Method Statement 9/66 documents. 2) Meeting System a). A meeting must have a subject and an object of discussion. b). Prior notification of time, place and discussion subject shall be made to all members who shall take part in the meeting for preparation. c). Schedule the time limit of the meeting. Arrange the approximated time for the various topics. d). Definitude the caller and the presider of the meeting and assure every topic have enough time to discuss. e). Definitude the recorder and the draftsman of the meeting minute. f). The presider shall sum up every topic and decisions when the meeting finished for easy making of the minute. g). If any topics need further discussion after meeting, the presider shall schedule the date of the next meeting. h). The meeting minute shall be sent to all the participants and the peoples who will execute some decisions made in the meeting. 3) Daily Work System a). A weekly regular meeting shall be presided by the project manager to municate things, harmonize works and dispose assignments. All the members of the project management board shall participant. b). A daily harmony meeting shall be presided by the construction manager. The header of work teams and the subcontractors shall participant. c). The record for the meetings must be made good and clean up to form a meeting minute. d). The special engineers shall execute the decisions made in the meetings and report the results to the construction manager in a period of time. e). The report forms such as Monthly Report of Construction, Monthly Report of Work Progress, Monthly Report of Work Quality, shall be reported to the project manager. Construction Organization Construction Organization Chart The construction anization chart of the work is as following: Civil Works, Underground Piping amp。 c) To deal with payment claims with the Owner and Contractor。 b) To keep in contact with the designer to deal with technical issues。 f) To arrange the progress of the work. 6) Construction Department a) To anize site construction and coordination according to the general program and staged schedules。 e) To be responsible for the maintenance and care of mechanical equipment。 c) To be responsible for security for all site staff。 Civil Works, Underground Piping amp。 c) To provide logistics services。 c) Working out QA/QC schemes。 c) Participate in the contract negotiation, audit the subcontract variation and claim information, get the approval from the Owner and C
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1