【正文】
7 8 9 10 11 12 A A B(Toilet cleaning) X Y C(refueling) D(Catering load) E(Garbage dumping) EST LST Service Schedule X A (qp=1) (ltos=1) Y A (qp=1) (ltos=0) B (qp=2) (ltos=0) B (qp=2) (ltos=1) C (qp=1) (ltos=0) D (qp=3) (ltos=0) D (qp=3) (ltos=1) E (qp=1) (ltos=0) Bill Of Material (Service) BOM File Paren t Com p o n e n t Q t y p er L T o f fs e tX A 1 1Y A 1 0A B 2 0A B 2 1A C 1 0A D 3 0A D 3 1A E 1 0 t i m e 1 2 3 4 5 6 7 8 9 10 11 12X 1Y 1Arrival/Departure Schedule (MPS) Remark: Aircraft is scheduled to arrive at the beginning of time 1, and depart at the beginning of time 12. The arrival and departure marshaling have to be on time 1 and 11, respectively. (unit=30min) Service Requirement Planning t i m e 1 2 3 4 5 6 7 8 9 10 11 12Re q. 1Sch l 1X t i m e 1 2 3 4 5 6 7 8 9 10 11 12Re q. 1Sc h l 1A Service Requirement Planning T i m e 1 2 3 4 5 6 7 8 9 10 11 12Req. 1Sch l . 1Y T i m e 1 2 3 4 5 6 7 8 9 10 11 12Re q. 1 1Sch l . 1 1A Remark: The aircraft departs at the beginning of period 12, so the marshaling has to be pleted in period 11. T i m e 1 2 3 4 5 6 7 8 9 10 11 12Req. 4 Sch l . 2 2 T i m e 1 2 3 4 5 6 7 8 9 10 11 12Req. 1Sch l . 1A B T i m e 1 2 3 4 5 6 7 8 9 10 11 12Re q. 1 Sc h l . 1 C Service Requirement Planning T i m e 1 2 3 4 5 6 7 8 9 10 11 12Re q. 1 Sc h l . 1 T i m e 1 2 3 4 5 6 7 8 9 10 11 12Req. 1Sch l . 1A D Service Requirement Planning T i m e 1 2 3 4 5 6 7 8 9 10 11 12Req. 6 Sch l . 3 3 E Summarized Service Requirements T ime1 2 3 4 5 6 7 8 9 10 11 12A 1 1B 2 2C 1D 3 3E 1 Capacity/Load Balancing The system schedules all the flights in MSS, then use MRP procedure to calculate all the services required. The service requirements are scheduled by MRP at the latest start time (LST). The system also calculates the earliest start time (EST) schedule. Schedules are then adjusted between EST and LST to balance the loading and capacity. 精品 資 料網(wǎng) 第三章 再論材料需求規(guī)劃 MPS: 件號 ./需求量 /需求日期 單階 BOM展開,利用計劃訂單發(fā)出 (POR)計算各期